Renovation of public buildings in the municipality of Strzelm (Q95701): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The aim of the project is to carry out the thermal modernisation of the following educational establishments in the municipality of Strzelm, in the following areas: 1.PSP 2 in the following: replacement of windows, doors, insulation — walls, ceilings, outer wall; regulating c.o. 2.Gimnazjum nr. 1 at Skocgomiu: comprehensive modernisation of the installation (heating system), insulation — land wall, insulation — ceilings, land wall, side wall,...) |
(Created claim: summary (P836): The subject of the project is to carry out thermal modernisation works in the following educational establishments in Strzegom commune within the scope indicated below: 1.PSP No 2 in Strzegom: replacement of windows, doors, warming – wall in ground, stropods, outer wall; 2nd Gymnasium No. 1 in Strzegom: comprehensive modernisation of the installation (heating system), warming – wall in ground, warming – stropodach, wall in ground, external wall,...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is to carry out thermal modernisation works in the following educational establishments in Strzegom commune within the scope indicated below: 1.PSP No 2 in Strzegom: replacement of windows, doors, warming – wall in ground, stropods, outer wall; 2nd Gymnasium No. 1 in Strzegom: comprehensive modernisation of the installation (heating system), warming – wall in ground, warming – stropodach, wall in ground, external wall, replacement of windows, doors, central heating 3.PP no. 2 in Strzegom: comprehensive modernisation of the installation which (c.o. regulation), warming – stropodach, outer wall, wall in ground, replacement of doors, windows. 4. Gymnasium No. 2 in Strzegom: central heating, central heating, central heating, replacement of windows, doors, warming – wall in ground, stropodach, external wall. 5. School and kindergarten building in Jaroszów: Pellet boiler + new heating system (heating system), replacement of door, window joinery, warming – stropodach, outer wall, wall in ground, boiler for pellet + new installation of heating preparation, warming – ceiling with heat flow from the bottom to the top (the ceiling to the attic). 6.PP in Stanowice: Modernisation of central heating installations + heat source exchange (water glycol-water heat pump with wells); replacement of windows and doors, warming – internal wall, internal wall, wall in ground, stropods, ceiling for heat flow from the bottom to the top, roof; modernisation of hot water installations + exchange of heat source (heat pump glycol-water with wells). The project will be implemented from 11.04.2016 to 30.06.2018 by the Municipality of Strzegom and the aforementioned educational institutions as project operators. The target group is all users of educational institutions infrastructure, i.e. pupils, teachers, administrative staff, parents and legal guardians, as well as residents of the municipality of Strzegom. The aim of the project is to reduce annual heat consumption and emissions of harmful gases and dust into the atmosphere. (English) | |||||||||||||||
Property / summary: The subject of the project is to carry out thermal modernisation works in the following educational establishments in Strzegom commune within the scope indicated below: 1.PSP No 2 in Strzegom: replacement of windows, doors, warming – wall in ground, stropods, outer wall; 2nd Gymnasium No. 1 in Strzegom: comprehensive modernisation of the installation (heating system), warming – wall in ground, warming – stropodach, wall in ground, external wall, replacement of windows, doors, central heating 3.PP no. 2 in Strzegom: comprehensive modernisation of the installation which (c.o. regulation), warming – stropodach, outer wall, wall in ground, replacement of doors, windows. 4. Gymnasium No. 2 in Strzegom: central heating, central heating, central heating, replacement of windows, doors, warming – wall in ground, stropodach, external wall. 5. School and kindergarten building in Jaroszów: Pellet boiler + new heating system (heating system), replacement of door, window joinery, warming – stropodach, outer wall, wall in ground, boiler for pellet + new installation of heating preparation, warming – ceiling with heat flow from the bottom to the top (the ceiling to the attic). 6.PP in Stanowice: Modernisation of central heating installations + heat source exchange (water glycol-water heat pump with wells); replacement of windows and doors, warming – internal wall, internal wall, wall in ground, stropods, ceiling for heat flow from the bottom to the top, roof; modernisation of hot water installations + exchange of heat source (heat pump glycol-water with wells). The project will be implemented from 11.04.2016 to 30.06.2018 by the Municipality of Strzegom and the aforementioned educational institutions as project operators. The target group is all users of educational institutions infrastructure, i.e. pupils, teachers, administrative staff, parents and legal guardians, as well as residents of the municipality of Strzegom. The aim of the project is to reduce annual heat consumption and emissions of harmful gases and dust into the atmosphere. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is to carry out thermal modernisation works in the following educational establishments in Strzegom commune within the scope indicated below: 1.PSP No 2 in Strzegom: replacement of windows, doors, warming – wall in ground, stropods, outer wall; 2nd Gymnasium No. 1 in Strzegom: comprehensive modernisation of the installation (heating system), warming – wall in ground, warming – stropodach, wall in ground, external wall, replacement of windows, doors, central heating 3.PP no. 2 in Strzegom: comprehensive modernisation of the installation which (c.o. regulation), warming – stropodach, outer wall, wall in ground, replacement of doors, windows. 4. Gymnasium No. 2 in Strzegom: central heating, central heating, central heating, replacement of windows, doors, warming – wall in ground, stropodach, external wall. 5. School and kindergarten building in Jaroszów: Pellet boiler + new heating system (heating system), replacement of door, window joinery, warming – stropodach, outer wall, wall in ground, boiler for pellet + new installation of heating preparation, warming – ceiling with heat flow from the bottom to the top (the ceiling to the attic). 6.PP in Stanowice: Modernisation of central heating installations + heat source exchange (water glycol-water heat pump with wells); replacement of windows and doors, warming – internal wall, internal wall, wall in ground, stropods, ceiling for heat flow from the bottom to the top, roof; modernisation of hot water installations + exchange of heat source (heat pump glycol-water with wells). The project will be implemented from 11.04.2016 to 30.06.2018 by the Municipality of Strzegom and the aforementioned educational institutions as project operators. The target group is all users of educational institutions infrastructure, i.e. pupils, teachers, administrative staff, parents and legal guardians, as well as residents of the municipality of Strzegom. The aim of the project is to reduce annual heat consumption and emissions of harmful gases and dust into the atmosphere. (English) / qualifier | |||||||||||||||
point in time: 15 October 2020
|
Revision as of 22:38, 15 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Renovation of public buildings in the municipality of Strzelm |
Project in Poland financed by DG Regio |
Statements
3,358,354.3 zloty
0 references
3,951,005.06 zloty
0 references
85.0 percent
0 references
11 April 2016
0 references
15 December 2018
0 references
GMINA STRZEGOM
0 references
Przedmiotem projektu jest przeprowadzenie prac termomodernizacyjnych w następujących placówkach edukacyjnych na terenie gminy Strzegom we wskazanym poniżej zakresie: 1.PSP nr 2 w Strzegomiu: wymiana okien, drzwi, docieplenie - ściana w gruncie, stropodach, ściana zewnętrzna; regulacja c.o. 2.Gimnazjum nr 1 w Strzegomiu: kompleksowa modernizacja instalacji co (system grzewczy), docieplenie - ściana w gruncie, docieplenie – stropodach, ściana w gruncie, ściana zewnętrzna, wymiana okien, drzwi, regulacja c.o. 3.PP nr 2 w Strzegomiu: kompleksowa modernizacja instalacji co (regulacja c.o.), docieplenie – stropodach, ściana zewnętrzna, ściana w gruncie, wymiana drzwi, okien. 4.Gimnazjum nr 2 w Strzegomiu: centralne ogrzewanie, regulacja c.o., wymiana okien, drzwi, docieplenie - ściana w gruncie, stropodach, ściana zewnętrzna. 5.Budynek szkolno- przedszkolny w Jaroszowie: Kocioł na pellet + nowa instalacja grzewcza (system grzewczy), wymiana stolarki drzwiowej, okiennej, docieplenie – stropodach, ściana zewnętrzna, ściana w gruncie, kocioł na pellet + nowa instalacja przygotowania c.w.u., docieplenie - strop przy przepływie ciepła z dołu do góry (Strop do strychu). 6.PP w Stanowicach: Modernizacja instalacji c.o. + wymiana źródła ciepła (pompa ciepła glikol-woda z odwiertami); wymiana okien i drzwi, docieplenie - ściana wewnętrzna, ściana wewnętrzna, ściana w gruncie, stropodach, strop przy przepływie ciepła z dołu do góry, dach; modernizacja instalacji c.w.u. + wymiana źródła ciepła (pompa ciepła glikol-woda z odwiertami). Projekt będzie realizowany od 11.04.2016 do 30.06.2018 r. przez Gminę Strzegom oraz ww. placówki edukacyjne jako operatorzy projektu. Grupą docelową są wszyscy użytkownicy infrastruktury placówek edukacyjnych tj. uczniowie, nauczyciele, kadra administracyjna, rodzice i opiekunowie prawni, a także mieszkańcy gminy Strzegom. Celem projektu jest ograniczenie rocznego zużycia energii cieplnej oraz emisji szkodliwych gazów i pyłów do atmosfery. (Polish)
0 references
The subject of the project is to carry out thermal modernisation works in the following educational establishments in Strzegom commune within the scope indicated below: 1.PSP No 2 in Strzegom: replacement of windows, doors, warming – wall in ground, stropods, outer wall; 2nd Gymnasium No. 1 in Strzegom: comprehensive modernisation of the installation (heating system), warming – wall in ground, warming – stropodach, wall in ground, external wall, replacement of windows, doors, central heating 3.PP no. 2 in Strzegom: comprehensive modernisation of the installation which (c.o. regulation), warming – stropodach, outer wall, wall in ground, replacement of doors, windows. 4. Gymnasium No. 2 in Strzegom: central heating, central heating, central heating, replacement of windows, doors, warming – wall in ground, stropodach, external wall. 5. School and kindergarten building in Jaroszów: Pellet boiler + new heating system (heating system), replacement of door, window joinery, warming – stropodach, outer wall, wall in ground, boiler for pellet + new installation of heating preparation, warming – ceiling with heat flow from the bottom to the top (the ceiling to the attic). 6.PP in Stanowice: Modernisation of central heating installations + heat source exchange (water glycol-water heat pump with wells); replacement of windows and doors, warming – internal wall, internal wall, wall in ground, stropods, ceiling for heat flow from the bottom to the top, roof; modernisation of hot water installations + exchange of heat source (heat pump glycol-water with wells). The project will be implemented from 11.04.2016 to 30.06.2018 by the Municipality of Strzegom and the aforementioned educational institutions as project operators. The target group is all users of educational institutions infrastructure, i.e. pupils, teachers, administrative staff, parents and legal guardians, as well as residents of the municipality of Strzegom. The aim of the project is to reduce annual heat consumption and emissions of harmful gases and dust into the atmosphere. (English)
15 October 2020
0 references
Identifiers
RPDS.03.03.04-02-0029/16
0 references