Technical assistance OP KED OP for Ministry of Health 2019-2020 (Q94303): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): Ensure the efficient implementation of OP KED by the Ministry of Health as an intermediate body for priority axis V by, inter alia: ensuring appropriate institutional capacity, ensuring the correct selection, verification, monitoring and control of projects, as well as information and publicity and evaluation., remove_old_english_translation) |
(Created claim: summary (P836): Ensuring effective implementation of PO WER by the Ministry of Health, acting as an intermediary institution for Priority axis V through inter alia: ensure adequate institutional capacity, ensure the proper process of project selection, verification, monitoring and control, as well as information and promotion and evaluation., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
Ensuring effective implementation of PO WER by the Ministry of Health, acting as an intermediary institution for Priority axis V through inter alia: ensure adequate institutional capacity, ensure the proper process of project selection, verification, monitoring and control, as well as information and promotion and evaluation. (English) | |||||||||||||||
Property / summary: Ensuring effective implementation of PO WER by the Ministry of Health, acting as an intermediary institution for Priority axis V through inter alia: ensure adequate institutional capacity, ensure the proper process of project selection, verification, monitoring and control, as well as information and promotion and evaluation. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Ensuring effective implementation of PO WER by the Ministry of Health, acting as an intermediary institution for Priority axis V through inter alia: ensure adequate institutional capacity, ensure the proper process of project selection, verification, monitoring and control, as well as information and promotion and evaluation. (English) / qualifier | |||||||||||||||
point in time: 15 October 2020
|
Revision as of 21:41, 15 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Technical assistance OP KED OP for Ministry of Health 2019-2020 |
Project in Poland financed by DG Regio |
Statements
2,793,039.2 zloty
0 references
3,314,000.0 zloty
0 references
84.28 percent
0 references
1 January 2019
0 references
31 December 2020
0 references
MINISTERSTWO ZDROWIA
0 references
Zapewnienie efektywnego wdrażania PO WER przez Ministerstwo Zdrowia pełniące funkcję Instytucji Pośredniczącej dla osi Priorytetowej V poprzez m.in.: zapewnienie właściwego potencjału instytucjonalnego, zapewnienie prawidłowego procesu wyboru projektów, ich weryfikacji, monitorowania i kontroli, a także informacji i promocji oraz ewaluacji. (Polish)
0 references
Ensuring effective implementation of PO WER by the Ministry of Health, acting as an intermediary institution for Priority axis V through inter alia: ensure adequate institutional capacity, ensure the proper process of project selection, verification, monitoring and control, as well as information and promotion and evaluation. (English)
15 October 2020
0 references
Identifiers
POWR.06.01.00-00-0501/18
0 references