Construction of the northern Cmilion bypass within DW 765 from the intersection with DK 73 (Q88490): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The investment in question consists of the construction of a section of the DV 765, which is the northern bypass of the municipality of Chmielnik with a total length of approximately 2.67 km.DW 765 is the subject of the project in Świętokrzyskie province, linking Chmielnik and Osiek to a length of 54 km.The project under examination relates to the construction of a bypass around the Chmielnik.In addition, the national road of DK 73 is planned...)
(‎Created claim: summary (P836): This investment consists of construction on the new track, section DW 765, which is the northern bypass of the town Chmielnik, with a total length of about 2.67 km. DW 765, which is the subject of the project, runs through Świętokrzyskie Voivodeship on a 54 km long section connecting Chmielnik and Osiek. The project under examination concerns the construction of a bypass in Chmielnik. In addition, it is planned to extend the DK 73 national road...)
Property / summary
 
This investment consists of construction on the new track, section DW 765, which is the northern bypass of the town Chmielnik, with a total length of about 2.67 km. DW 765, which is the subject of the project, runs through Świętokrzyskie Voivodeship on a 54 km long section connecting Chmielnik and Osiek. The project under examination concerns the construction of a bypass in Chmielnik. In addition, it is planned to extend the DK 73 national road over a distance of about 1.4 km. Access roads with a total length of about 6.5 km were also designed, walking and cycling routes along access roads and pavements, bus bays with platforms. As part of this investment, the construction of an engineering facility – viaduct over the county road No. 0355T, in the town of Suchowola, in the commune of Chmielnik is planned. Access to the ring road will only be possible through the intersections of the ring road with: —National road No. 73, poviat without number (ul. Kielce), access to the Suchowola Mine, -Poviat road No. 0022T (ul. Lubańska), -ul. Szydłowska and the existing provincial road No. 765. In the areas of intersections to public roads the inclusion of access roads has been designed. The bypass will cross without collision with: by District Road No 0355T (ul. It’s Pierzchnicka. Project indicators The total length of built voivodship roads – 2.67 km The total length of rebuilt national roads – 1.41 km The users of the project will be participants of road traffic on this section of the road, i.e. drivers, passengers, cyclists and pedestrians. The construction of the bypass and its connection with existing transport lines will affect the economic development and attractiveness of the region and the areas associated with the roads: national No. 73 and 78 and Voivodeship No. 765. As a result of the project, the road capacity will be increased. This will save time in passenger and freight transport and improve travel comfort. The construction of the Chmielnik bypass will improve the safety of road users and residents of the city. (English)
Property / summary: This investment consists of construction on the new track, section DW 765, which is the northern bypass of the town Chmielnik, with a total length of about 2.67 km. DW 765, which is the subject of the project, runs through Świętokrzyskie Voivodeship on a 54 km long section connecting Chmielnik and Osiek. The project under examination concerns the construction of a bypass in Chmielnik. In addition, it is planned to extend the DK 73 national road over a distance of about 1.4 km. Access roads with a total length of about 6.5 km were also designed, walking and cycling routes along access roads and pavements, bus bays with platforms. As part of this investment, the construction of an engineering facility – viaduct over the county road No. 0355T, in the town of Suchowola, in the commune of Chmielnik is planned. Access to the ring road will only be possible through the intersections of the ring road with: —National road No. 73, poviat without number (ul. Kielce), access to the Suchowola Mine, -Poviat road No. 0022T (ul. Lubańska), -ul. Szydłowska and the existing provincial road No. 765. In the areas of intersections to public roads the inclusion of access roads has been designed. The bypass will cross without collision with: by District Road No 0355T (ul. It’s Pierzchnicka. Project indicators The total length of built voivodship roads – 2.67 km The total length of rebuilt national roads – 1.41 km The users of the project will be participants of road traffic on this section of the road, i.e. drivers, passengers, cyclists and pedestrians. The construction of the bypass and its connection with existing transport lines will affect the economic development and attractiveness of the region and the areas associated with the roads: national No. 73 and 78 and Voivodeship No. 765. As a result of the project, the road capacity will be increased. This will save time in passenger and freight transport and improve travel comfort. The construction of the Chmielnik bypass will improve the safety of road users and residents of the city. (English) / rank
 
Normal rank
Property / summary: This investment consists of construction on the new track, section DW 765, which is the northern bypass of the town Chmielnik, with a total length of about 2.67 km. DW 765, which is the subject of the project, runs through Świętokrzyskie Voivodeship on a 54 km long section connecting Chmielnik and Osiek. The project under examination concerns the construction of a bypass in Chmielnik. In addition, it is planned to extend the DK 73 national road over a distance of about 1.4 km. Access roads with a total length of about 6.5 km were also designed, walking and cycling routes along access roads and pavements, bus bays with platforms. As part of this investment, the construction of an engineering facility – viaduct over the county road No. 0355T, in the town of Suchowola, in the commune of Chmielnik is planned. Access to the ring road will only be possible through the intersections of the ring road with: —National road No. 73, poviat without number (ul. Kielce), access to the Suchowola Mine, -Poviat road No. 0022T (ul. Lubańska), -ul. Szydłowska and the existing provincial road No. 765. In the areas of intersections to public roads the inclusion of access roads has been designed. The bypass will cross without collision with: by District Road No 0355T (ul. It’s Pierzchnicka. Project indicators The total length of built voivodship roads – 2.67 km The total length of rebuilt national roads – 1.41 km The users of the project will be participants of road traffic on this section of the road, i.e. drivers, passengers, cyclists and pedestrians. The construction of the bypass and its connection with existing transport lines will affect the economic development and attractiveness of the region and the areas associated with the roads: national No. 73 and 78 and Voivodeship No. 765. As a result of the project, the road capacity will be increased. This will save time in passenger and freight transport and improve travel comfort. The construction of the Chmielnik bypass will improve the safety of road users and residents of the city. (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:43, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the northern Cmilion bypass within DW 765 from the intersection with DK 73
Project in Poland financed by DG Regio

    Statements

    0 references
    35,150,090.88 zloty
    0 references
    8,436,021.81 Euro
    13 January 2020
    0 references
    41,353,048.1 zloty
    0 references
    9,924,731.54 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    15 December 2016
    0 references
    31 March 2019
    0 references
    WOJEWÓDZTWO ŚWIĘTOKRZYSKIE
    0 references
    Przedmiotowa inwestycja polega na budowie po nowym śladzie, odcinka DW 765, będącej północną obwodnicą miasta Chmielnika o łącznej długości około 2,67 km. DW 765 będąca przedmiotem projektu biegnie przez woj. świętokrzyskie na odcinku o długości 54 km łącząc Chmielnik i Osiek. Analizowany projekt dotyczy budowy obwodnicy w Chmielniku. Ponadto zaplanowano rozbudowę drogi krajowej DK 73 na odcinku około 1,4 km. Zaprojektowano także drogi dojazdowe o łącznej długości około 6,5 km, ciągi pieszo-rowerowe, szlaki rowerowe w ciągu dróg dojazdowych oraz chodniki, zatoki autobusowe z peronami. W ramach przedmiotowej inwestycji zakłada się budowę obiektu inżynierskiego - wiaduktu nad drogą powiatową nr 0355T, w miejscowości Suchowola, w gminie Chmielnik. Dostęp do obwodnicy możliwy będzie wyłącznie poprzez skrzyżowania obwodnicy z: -drogą krajową nr 73, powiatową bez numeru (ul. Kielecka), dojazdową do Kopalni Suchowola, -drogą powiatową nr 0022T (ul. Lubańska), -ul. Szydłowską i istniejącą drogą wojewódzką nr 765. W rejonach skrzyżowań do dróg publicznych zaprojektowano włączenia dróg dojazdowych. Obwodnica będzie krzyżować się bezkolizyjnie z: drogą powiatową nr 0355T (ul. Pierzchnicka). Wskaźniki projektu Całkowita długość wybudowanych dróg wojewódzkich - 2,67 km Całkowita długość przebudowanych dróg krajowych - 1,41 km Użytkownikami projektu będą uczestnicy ruchu drogowego na przedmiotowym odcinku drogi tj. kierowcy, pasażerowie, rowerzyści oraz piesi. Budowa obwodnicy wraz z połączeniem jej z istniejącymi ciągami komunikacyjnymi wpłynie na rozwój gospodarczy i atrakcyjność regionu i obszarów, które związane są z drogami: krajową nr 73 i 78 oraz wojewódzką nr 765. W wyniku realizacji projektu zostanie zwiększona przepustowość drogi. Wpłynie to na oszczędność czasu w przewozach pasażerskich i towarowych oraz poprawę komfortu podróżowania. Budowa obwodnicy Chmielnika wpłynie na poprawę bezpieczeństwa uczestników ruchu drogowego i mieszkańców miasta. (Polish)
    0 references
    This investment consists of construction on the new track, section DW 765, which is the northern bypass of the town Chmielnik, with a total length of about 2.67 km. DW 765, which is the subject of the project, runs through Świętokrzyskie Voivodeship on a 54 km long section connecting Chmielnik and Osiek. The project under examination concerns the construction of a bypass in Chmielnik. In addition, it is planned to extend the DK 73 national road over a distance of about 1.4 km. Access roads with a total length of about 6.5 km were also designed, walking and cycling routes along access roads and pavements, bus bays with platforms. As part of this investment, the construction of an engineering facility – viaduct over the county road No. 0355T, in the town of Suchowola, in the commune of Chmielnik is planned. Access to the ring road will only be possible through the intersections of the ring road with: —National road No. 73, poviat without number (ul. Kielce), access to the Suchowola Mine, -Poviat road No. 0022T (ul. Lubańska), -ul. Szydłowska and the existing provincial road No. 765. In the areas of intersections to public roads the inclusion of access roads has been designed. The bypass will cross without collision with: by District Road No 0355T (ul. It’s Pierzchnicka. Project indicators The total length of built voivodship roads – 2.67 km The total length of rebuilt national roads – 1.41 km The users of the project will be participants of road traffic on this section of the road, i.e. drivers, passengers, cyclists and pedestrians. The construction of the bypass and its connection with existing transport lines will affect the economic development and attractiveness of the region and the areas associated with the roads: national No. 73 and 78 and Voivodeship No. 765. As a result of the project, the road capacity will be increased. This will save time in passenger and freight transport and improve travel comfort. The construction of the Chmielnik bypass will improve the safety of road users and residents of the city. (English)
    14 October 2020
    0 references

    Identifiers

    POPW.02.02.00-26-0007/16
    0 references