Reconstruction of the intersection of DK 19 (al. Solidarity and al. Gen. It. Sikorski) and DW 809 (ul. Gen. Spirit in Lublin — removal of traffic towards the Lublin Czechs interchange (S12/S17/S19) (Q88468): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project concerns the conversion of street junctions: al.Solidarity, al.Sikorski and ul.B. Dear at the intersection between two and two levels with the central island, the connection points and the traffic lights at ‘0’ level (within the course of ul.Gen.B. Ducha and al.Sikorski) and a estader maintained within al.Solidarity.The material scope of the investment includes, inter alia:— construction of road viaduct within al.Solidarity;Constru...)
(‎Created claim: summary (P836): The project concerns the reconstruction of the intersection of streets:al. Solidarity, al. Sikorski and Gen. B. Spirit for a two-level intersection with the central island, linkages and light signalling at level “0” (in the course of ul. It’s a gene. B. Spirit and al. Sikorski) and the overpass conducted in the al. It’s a solidarity. The material scope of the investment includes, inter alia: —construction of the road viaduct within al. Solidarit...)
Property / summary
 
The project concerns the reconstruction of the intersection of streets:al. Solidarity, al. Sikorski and Gen. B. Spirit for a two-level intersection with the central island, linkages and light signalling at level “0” (in the course of ul. It’s a gene. B. Spirit and al. Sikorski) and the overpass conducted in the al. It’s a solidarity. The material scope of the investment includes, inter alia: —construction of the road viaduct within al. Solidarity; — construction of intersection with central island and traffic lights at the intersection of streets: It’s a gene. B. Spirit, Al. Sikorski and al. Solidarity; —reconstruction al. Sikorski on the section necessary for incorporation into al. Solidarity; —reconstruction of ul. It’s a gene. B. Spirit on the section from al. Solidarity to St. The Polygon; — construction of a junction with traffic lights at the intersection of ul. It’s a gene. B. Ducha and ul. The Northern one; —reconstruction of ul. North on the section necessary for incorporation into Gen Street. B. of the Spirit; —the construction of a footbridge over al. Solidarity; —construction and construction of pavements; — construction of bicycle paths; —construction of bus bays; — construction of environmental protection devices (e.g. acoustic screens, rainwater drainage); —construction and construction of technical infrastructure equipment(including light signalling, lighting) The products of the project will be: — Rebuilt national road No. 19 with total length. 1,05 km (including: it’s al. Solidarity – 0.89 km, al. Sikorskiego – 0.16 km) – Rebuilt of Voivodeship Road No. 809 (ul. It’s a gene. B. Spirit) d. 0.44 km The main users of the project will be: — residents of Lublin and LOF; —inhabitants of Lubelskie Voivodship and neighbouring voivodships; —passenger car drivers in transit traffic; —professional vans and truck drivers; —tourists visiting Lublin. (English)
Property / summary: The project concerns the reconstruction of the intersection of streets:al. Solidarity, al. Sikorski and Gen. B. Spirit for a two-level intersection with the central island, linkages and light signalling at level “0” (in the course of ul. It’s a gene. B. Spirit and al. Sikorski) and the overpass conducted in the al. It’s a solidarity. The material scope of the investment includes, inter alia: —construction of the road viaduct within al. Solidarity; — construction of intersection with central island and traffic lights at the intersection of streets: It’s a gene. B. Spirit, Al. Sikorski and al. Solidarity; —reconstruction al. Sikorski on the section necessary for incorporation into al. Solidarity; —reconstruction of ul. It’s a gene. B. Spirit on the section from al. Solidarity to St. The Polygon; — construction of a junction with traffic lights at the intersection of ul. It’s a gene. B. Ducha and ul. The Northern one; —reconstruction of ul. North on the section necessary for incorporation into Gen Street. B. of the Spirit; —the construction of a footbridge over al. Solidarity; —construction and construction of pavements; — construction of bicycle paths; —construction of bus bays; — construction of environmental protection devices (e.g. acoustic screens, rainwater drainage); —construction and construction of technical infrastructure equipment(including light signalling, lighting) The products of the project will be: — Rebuilt national road No. 19 with total length. 1,05 km (including: it’s al. Solidarity – 0.89 km, al. Sikorskiego – 0.16 km) – Rebuilt of Voivodeship Road No. 809 (ul. It’s a gene. B. Spirit) d. 0.44 km The main users of the project will be: — residents of Lublin and LOF; —inhabitants of Lubelskie Voivodship and neighbouring voivodships; —passenger car drivers in transit traffic; —professional vans and truck drivers; —tourists visiting Lublin. (English) / rank
 
Normal rank
Property / summary: The project concerns the reconstruction of the intersection of streets:al. Solidarity, al. Sikorski and Gen. B. Spirit for a two-level intersection with the central island, linkages and light signalling at level “0” (in the course of ul. It’s a gene. B. Spirit and al. Sikorski) and the overpass conducted in the al. It’s a solidarity. The material scope of the investment includes, inter alia: —construction of the road viaduct within al. Solidarity; — construction of intersection with central island and traffic lights at the intersection of streets: It’s a gene. B. Spirit, Al. Sikorski and al. Solidarity; —reconstruction al. Sikorski on the section necessary for incorporation into al. Solidarity; —reconstruction of ul. It’s a gene. B. Spirit on the section from al. Solidarity to St. The Polygon; — construction of a junction with traffic lights at the intersection of ul. It’s a gene. B. Ducha and ul. The Northern one; —reconstruction of ul. North on the section necessary for incorporation into Gen Street. B. of the Spirit; —the construction of a footbridge over al. Solidarity; —construction and construction of pavements; — construction of bicycle paths; —construction of bus bays; — construction of environmental protection devices (e.g. acoustic screens, rainwater drainage); —construction and construction of technical infrastructure equipment(including light signalling, lighting) The products of the project will be: — Rebuilt national road No. 19 with total length. 1,05 km (including: it’s al. Solidarity – 0.89 km, al. Sikorskiego – 0.16 km) – Rebuilt of Voivodeship Road No. 809 (ul. It’s a gene. B. Spirit) d. 0.44 km The main users of the project will be: — residents of Lublin and LOF; —inhabitants of Lubelskie Voivodship and neighbouring voivodships; —passenger car drivers in transit traffic; —professional vans and truck drivers; —tourists visiting Lublin. (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:43, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reconstruction of the intersection of DK 19 (al. Solidarity and al. Gen. It. Sikorski) and DW 809 (ul. Gen. Spirit in Lublin — removal of traffic towards the Lublin Czechs interchange (S12/S17/S19)
Project in Poland financed by DG Regio

    Statements

    0 references
    58,936,135.29 zloty
    0 references
    14,144,672.47 Euro
    13 January 2020
    0 references
    69,860,847.48 zloty
    0 references
    16,766,603.4 Euro
    13 January 2020
    0 references
    84.36 percent
    0 references
    15 April 2016
    0 references
    31 January 2018
    0 references
    GMINA LUBLIN
    0 references
    0 references
    Projekt dotyczy przebudowy skrzyżowania ulic:al. Solidarności, al. Sikorskiego i ul Gen. B. Ducha na skrzyżowanie dwupoziomowe z wyspą centralną, łącznicami i sygnalizacją świetlną w poziomie „0” (w ciągu ul. Gen. B. Ducha oraz al. Sikorskiego) oraz estakadą prowadzoną w ciągu al. Solidarności. Zakres rzeczowy inwestycji obejmuje m. in.: -budowę wiaduktu drogowego w ciągu al. Solidarności; -budowę skrzyżowania z wyspą centralną i sygnalizacją świetlną na przecięciu ulic: Gen. B.Ducha, al.Sikorskiego i al. Solidarności; -przebudowę al. Sikorskiego na odcinku niezbędnym dla wykonania włączenia do al. Solidarności; -przebudowę ul. Gen. B. Ducha na odcinku od al. Solidarności do ul. Poligonowej; -budowę skrzyżowania z sygnalizacją świetlną na skrzyżowaniu ul. Gen. B. Ducha i ul. Północnej; -przebudowę ul. Północnej na odcinku niezbędnym dla wykonania włączenia do ul Gen. B. Ducha; -budowę kładki dla pieszych nad al. Solidarności; -przebudowę i budowę chodników; -budowę ścieżek rowerowych; -przebudowę zatok autobusowych; -budowę urządzeń ochrony środowiska (np. ekrany akustyczne, kanalizacja deszczowa); -przebudowę i budowę urządzeń infrastruktury technicznej(m.in sygnalizacji świetlnej, oświetlenia) Produktami projektu będą: - Przebudowana droga krajowa nr 19 o łącznej dł. 1,05 km (w tym: al. Solidarności – 0,89 km, al. Sikorskiego – 0,16 km) - Przebudowana droga wojewódzka nr 809 (ul. Gen. B. Ducha) o dł. 0,44 km Głównymi użytkownikami projektu będą: -mieszkańcy Lublina i LOF; -mieszkańcy Województwa Lubelskiego i sąsiednich województw; -kierowcy samochodów osobowych w ruchu tranzytowym; -kierowcy zawodowi samochodów dostawczych i ciężarowych; -turyści odwiedzający Lublin. (Polish)
    0 references
    The project concerns the reconstruction of the intersection of streets:al. Solidarity, al. Sikorski and Gen. B. Spirit for a two-level intersection with the central island, linkages and light signalling at level “0” (in the course of ul. It’s a gene. B. Spirit and al. Sikorski) and the overpass conducted in the al. It’s a solidarity. The material scope of the investment includes, inter alia: —construction of the road viaduct within al. Solidarity; — construction of intersection with central island and traffic lights at the intersection of streets: It’s a gene. B. Spirit, Al. Sikorski and al. Solidarity; —reconstruction al. Sikorski on the section necessary for incorporation into al. Solidarity; —reconstruction of ul. It’s a gene. B. Spirit on the section from al. Solidarity to St. The Polygon; — construction of a junction with traffic lights at the intersection of ul. It’s a gene. B. Ducha and ul. The Northern one; —reconstruction of ul. North on the section necessary for incorporation into Gen Street. B. of the Spirit; —the construction of a footbridge over al. Solidarity; —construction and construction of pavements; — construction of bicycle paths; —construction of bus bays; — construction of environmental protection devices (e.g. acoustic screens, rainwater drainage); —construction and construction of technical infrastructure equipment(including light signalling, lighting) The products of the project will be: — Rebuilt national road No. 19 with total length. 1,05 km (including: it’s al. Solidarity – 0.89 km, al. Sikorskiego – 0.16 km) – Rebuilt of Voivodeship Road No. 809 (ul. It’s a gene. B. Spirit) d. 0.44 km The main users of the project will be: — residents of Lublin and LOF; —inhabitants of Lubelskie Voivodship and neighbouring voivodships; —passenger car drivers in transit traffic; —professional vans and truck drivers; —tourists visiting Lublin. (English)
    14 October 2020
    0 references

    Identifiers

    POPW.02.02.00-06-0002/16
    0 references