Development of the sanitary and storm-water sewerage network in Tarczyn (Q85306): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The purpose of the project is to increase the degree of investigation by the Municipality of Tarczyn.As a result, the amount of waste water discharged directly into surface waters will be reduced.Moreover, as a result of the construction of the new sewerage network, it will improve not only the living conditions of the residents in its territory, but also the quality of the natural environment.The investment in question is located in ul.Grey S...)
(‎Created claim: summary (P836): The aim of the project is to increase the degree of scanning of Tarczyn Commune. Thus, the amount of waste water discharged directly into surface water will be reduced. In addition, the construction of a new sewerage network will improve not only the living conditions of its inhabitants but also the quality of the natural environment. The investment in question is located in ul. Grey Rankings, ul. Intricate, hive. Unforgettable, ul. Tulipowa Str...)
Property / summary
 
The aim of the project is to increase the degree of scanning of Tarczyn Commune. Thus, the amount of waste water discharged directly into surface water will be reduced. In addition, the construction of a new sewerage network will improve not only the living conditions of its inhabitants but also the quality of the natural environment. The investment in question is located in ul. Grey Rankings, ul. Intricate, hive. Unforgettable, ul. Tulipowa Street, ul. Rose, ul. Wrzosowa and ul. Gawarskiego, ul. Oakova, ul. Larch and St. Narrow and includes the extension of the sanitary sewage system and the rainwater drainage system in Tarczyn. As a result of the construction of a new sewerage network with a length of 5.94 (including qualified 4.74 km) the network will be connected to the network. It’s 147 people. In addition, the project includes the construction of a 1.07 km long rainwater drainage system. (English)
Property / summary: The aim of the project is to increase the degree of scanning of Tarczyn Commune. Thus, the amount of waste water discharged directly into surface water will be reduced. In addition, the construction of a new sewerage network will improve not only the living conditions of its inhabitants but also the quality of the natural environment. The investment in question is located in ul. Grey Rankings, ul. Intricate, hive. Unforgettable, ul. Tulipowa Street, ul. Rose, ul. Wrzosowa and ul. Gawarskiego, ul. Oakova, ul. Larch and St. Narrow and includes the extension of the sanitary sewage system and the rainwater drainage system in Tarczyn. As a result of the construction of a new sewerage network with a length of 5.94 (including qualified 4.74 km) the network will be connected to the network. It’s 147 people. In addition, the project includes the construction of a 1.07 km long rainwater drainage system. (English) / rank
 
Normal rank
Property / summary: The aim of the project is to increase the degree of scanning of Tarczyn Commune. Thus, the amount of waste water discharged directly into surface water will be reduced. In addition, the construction of a new sewerage network will improve not only the living conditions of its inhabitants but also the quality of the natural environment. The investment in question is located in ul. Grey Rankings, ul. Intricate, hive. Unforgettable, ul. Tulipowa Street, ul. Rose, ul. Wrzosowa and ul. Gawarskiego, ul. Oakova, ul. Larch and St. Narrow and includes the extension of the sanitary sewage system and the rainwater drainage system in Tarczyn. As a result of the construction of a new sewerage network with a length of 5.94 (including qualified 4.74 km) the network will be connected to the network. It’s 147 people. In addition, the project includes the construction of a 1.07 km long rainwater drainage system. (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:35, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Development of the sanitary and storm-water sewerage network in Tarczyn
Project in Poland financed by DG Regio

    Statements

    0 references
    1,370,781.19 zloty
    0 references
    328,987.49 Euro
    13 January 2020
    0 references
    1,612,683.77 zloty
    0 references
    387,044.1 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2017
    0 references
    GMINA TARCZYN
    0 references
    0 references
    0 references
    Celem projektu jest zwiększenie stopnia skanalizowania Gminy Tarczyn. Tym samym zmniejszy się ilość ścieków odprowadzanych bezpośrednio do wód powierzchniowych. Ponadto w wyniku budowy nowej sieci kanalizacji poprawią się nie tylko warunki życia mieszkańców na jej terenie, ale i jakość środowiska przyrodniczego. Przedmiotowa inwestycja znajduje się w ul. Szarych Szeregów , ul. Zawilec, ul. Niezapominajki, ul. Tulipanowej, ul. Różanej, ul. Wrzosowej oraz ul. Gawarskiego, ul. Dębowa, ul. Modrzewiowa i ul. Wąska i obejmuje rozbudowę sieci kanalizacji sanitarnej oraz kanalizacji deszczowe w Tarczynie. W wyniku budowy nowej sieci kanalizacji o długości 5,94 (w tym kwalifikowane 4,74 km) do sieci przyłączonych zostanie ok. 147 osób. Ponadto projekt obejmuje budowę kanalizacji deszczowej o długości 1,07 km. (Polish)
    0 references
    The aim of the project is to increase the degree of scanning of Tarczyn Commune. Thus, the amount of waste water discharged directly into surface water will be reduced. In addition, the construction of a new sewerage network will improve not only the living conditions of its inhabitants but also the quality of the natural environment. The investment in question is located in ul. Grey Rankings, ul. Intricate, hive. Unforgettable, ul. Tulipowa Street, ul. Rose, ul. Wrzosowa and ul. Gawarskiego, ul. Oakova, ul. Larch and St. Narrow and includes the extension of the sanitary sewage system and the rainwater drainage system in Tarczyn. As a result of the construction of a new sewerage network with a length of 5.94 (including qualified 4.74 km) the network will be connected to the network. It’s 147 people. In addition, the project includes the construction of a 1.07 km long rainwater drainage system. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.02.03.00-00-0085/16
    0 references