Water and sanitation infrastructure development in the Jaisielna Agglomeration Valley (Q85297): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project will be implemented in Podkarpackie Province, Jarsienica Rosenna (Jansienica, Wola Jabelick and Blyne) and Brzozów (Stara Wieś), in the Jaisielna Agglomeracja Agglomeration.The aim of the project is to:investment in sewerage system extension in the gravity/discharge system and the extension and reconstruction of the wastewater treatment plant in Blim.The planned treatment plants are to:modification of premises:sewage pumping statio...)
(‎Created claim: summary (P836): The project will be implemented in the Podkarpackie Voivodeship, Gmm. Jasienica Rosielna (Jasienica, Wola Jasienicka and Blizne) and Brzozów (Stara Wieś) in the Agglomeration Jasienica Rosielna. The project plans to: investment works in the field of expansion of sewage systems in gravity-pressure system and expansion and reconstruction of sewage treatment plant in Blizno. The following shall be planned at the treatment plant: reconstruction of f...)
Property / summary
 
The project will be implemented in the Podkarpackie Voivodeship, Gmm. Jasienica Rosielna (Jasienica, Wola Jasienicka and Blizne) and Brzozów (Stara Wieś) in the Agglomeration Jasienica Rosielna. The project plans to: investment works in the field of expansion of sewage systems in gravity-pressure system and expansion and reconstruction of sewage treatment plant in Blizno. The following shall be planned at the treatment plant: reconstruction of facilities: sewage pumping plant, Hydrocentrum multifunction reactor, existing blower station, trafo station. Demolition of existing objects: Staircase, Sander, Technological and social building, sinking point, sinking point, Retency-averaging tank of the catchment point, Supply sludge tank, ground filter, Measuring well. Construction of facilities: Excess sludge tank, first-degree effluent pumping plant, second-degree effluent pumping plant, technological water pumping plant, Rainwater pumping plant, Retention tank, sewage tank, Driving waste water retention tank, Distributor chamber, Measuring well, Multifunctional Reactor, Designed air station, II refined waste water measuring well, Mechanical drainage building The treated waste water will be pumped into the distribution chambers of semi-periodic multifunctional biological reactors. The sewage system will be built for 33.89 km (9.5 km Jasienica Rosielna, 24.39 km Stara Wieś) and reconstructed sewage network in Blizno with a length of 1.2 km. The water supply network will cover 10 km in Jasienica Rosielna, as well as construction of 5 wells and construction of SUW. (English)
Property / summary: The project will be implemented in the Podkarpackie Voivodeship, Gmm. Jasienica Rosielna (Jasienica, Wola Jasienicka and Blizne) and Brzozów (Stara Wieś) in the Agglomeration Jasienica Rosielna. The project plans to: investment works in the field of expansion of sewage systems in gravity-pressure system and expansion and reconstruction of sewage treatment plant in Blizno. The following shall be planned at the treatment plant: reconstruction of facilities: sewage pumping plant, Hydrocentrum multifunction reactor, existing blower station, trafo station. Demolition of existing objects: Staircase, Sander, Technological and social building, sinking point, sinking point, Retency-averaging tank of the catchment point, Supply sludge tank, ground filter, Measuring well. Construction of facilities: Excess sludge tank, first-degree effluent pumping plant, second-degree effluent pumping plant, technological water pumping plant, Rainwater pumping plant, Retention tank, sewage tank, Driving waste water retention tank, Distributor chamber, Measuring well, Multifunctional Reactor, Designed air station, II refined waste water measuring well, Mechanical drainage building The treated waste water will be pumped into the distribution chambers of semi-periodic multifunctional biological reactors. The sewage system will be built for 33.89 km (9.5 km Jasienica Rosielna, 24.39 km Stara Wieś) and reconstructed sewage network in Blizno with a length of 1.2 km. The water supply network will cover 10 km in Jasienica Rosielna, as well as construction of 5 wells and construction of SUW. (English) / rank
 
Normal rank
Property / summary: The project will be implemented in the Podkarpackie Voivodeship, Gmm. Jasienica Rosielna (Jasienica, Wola Jasienicka and Blizne) and Brzozów (Stara Wieś) in the Agglomeration Jasienica Rosielna. The project plans to: investment works in the field of expansion of sewage systems in gravity-pressure system and expansion and reconstruction of sewage treatment plant in Blizno. The following shall be planned at the treatment plant: reconstruction of facilities: sewage pumping plant, Hydrocentrum multifunction reactor, existing blower station, trafo station. Demolition of existing objects: Staircase, Sander, Technological and social building, sinking point, sinking point, Retency-averaging tank of the catchment point, Supply sludge tank, ground filter, Measuring well. Construction of facilities: Excess sludge tank, first-degree effluent pumping plant, second-degree effluent pumping plant, technological water pumping plant, Rainwater pumping plant, Retention tank, sewage tank, Driving waste water retention tank, Distributor chamber, Measuring well, Multifunctional Reactor, Designed air station, II refined waste water measuring well, Mechanical drainage building The treated waste water will be pumped into the distribution chambers of semi-periodic multifunctional biological reactors. The sewage system will be built for 33.89 km (9.5 km Jasienica Rosielna, 24.39 km Stara Wieś) and reconstructed sewage network in Blizno with a length of 1.2 km. The water supply network will cover 10 km in Jasienica Rosielna, as well as construction of 5 wells and construction of SUW. (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:35, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Water and sanitation infrastructure development in the Jaisielna Agglomeration Valley
Project in Poland financed by DG Regio

    Statements

    0 references
    17,794,614.19 zloty
    0 references
    4,270,707.41 Euro
    13 January 2020
    0 references
    20,934,840.23 zloty
    0 references
    5,024,361.66 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    24 November 2014
    0 references
    31 December 2020
    0 references
    GMINA JASIENICA ROSIELNA
    0 references
    0 references
    Projekt będzie realizowany w woj. podkarpackim,gm. Jasienica Rosielna (Jasienica, Wola Jasienicka i Blizne) oraz gm. Brzozów (Stara Wieś), na terenie Aglomeracji Jasienica Rosielna. W ramach projektu planuje się: prace inwestycyjne z zakresu rozbudowy kanalizacji w systemie grawitacyjno-tłocznym oraz rozbudowę i przebudowę oczyszczalni ścieków w Bliznem. Na oczyszczalni planuje się: przebudowa obiektów: pompownia ścieków, reaktor wielofunkcyjny typu „Hydrocentrum”, stacja dmuchaw istniejąca, stacja trafo. Rozbiórka obiektów istniejących: Krata schodkowa, Piaskownik, Budynek technologiczno-socjalny, Punkt zlewny, Piaskownik punktu zlewnego, Zbiornik retencyjno-uśredniający punktu zlewnego, Zbiornik osadu nadmiernego, Filtr gruntowy, Studzienka pomiarowa. Budowę obiektów: Zbiornik osadu nadmiernego, Pompownia ścieków I stopnia, Pompownia ścieków II stopnia, Pompownia wody technologicznej, Pompownia wód deszczowych, Zbiornik retencyjny, ścieków, Zbiornik retencyjny ścieków dowożonych, Komora rozdzielcza, Studnia pomiarowa, Reaktor wielofunkcyjny, Stacja dmuchaw projektowana, Studnia pomiarowa ścieków oczyszczonych, Budynek oczyszczania mechanicznego, Pompownia ścieków dowożonych, Budynek wielofunkcyjny, Silos na wapno, Stacja dozowania koagulantu, Filtr powietrza I, Filtr powietrza II. Podczyszczone ścieki będą dawkowane pompowo do komór rozdzielczych wielofunkcyjnych reaktorów biologicznych o działaniu semiperiodycznym. Zostanie wybudowana kanalizacja o dł.33,89km (9,5km Jasienica Rosielna, 24,39km Stara Wieś) oraz przebudowana sieć kanalizacji w Bliznem o dł.1,2km. Sieć wodociągowa obejmie 10km w Jasienicy Rosielnej, oraz wykonanie i uzbrojenie 5 studni i budowę SUW. (Polish)
    0 references
    The project will be implemented in the Podkarpackie Voivodeship, Gmm. Jasienica Rosielna (Jasienica, Wola Jasienicka and Blizne) and Brzozów (Stara Wieś) in the Agglomeration Jasienica Rosielna. The project plans to: investment works in the field of expansion of sewage systems in gravity-pressure system and expansion and reconstruction of sewage treatment plant in Blizno. The following shall be planned at the treatment plant: reconstruction of facilities: sewage pumping plant, Hydrocentrum multifunction reactor, existing blower station, trafo station. Demolition of existing objects: Staircase, Sander, Technological and social building, sinking point, sinking point, Retency-averaging tank of the catchment point, Supply sludge tank, ground filter, Measuring well. Construction of facilities: Excess sludge tank, first-degree effluent pumping plant, second-degree effluent pumping plant, technological water pumping plant, Rainwater pumping plant, Retention tank, sewage tank, Driving waste water retention tank, Distributor chamber, Measuring well, Multifunctional Reactor, Designed air station, II refined waste water measuring well, Mechanical drainage building The treated waste water will be pumped into the distribution chambers of semi-periodic multifunctional biological reactors. The sewage system will be built for 33.89 km (9.5 km Jasienica Rosielna, 24.39 km Stara Wieś) and reconstructed sewage network in Blizno with a length of 1.2 km. The water supply network will cover 10 km in Jasienica Rosielna, as well as construction of 5 wells and construction of SUW. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.02.03.00-00-0079/16
    0 references