Construction of gas network medium pressure Kutno-Krośniewice with the gas station (Q86145): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project consists of the construction of a medium-pressure medium and a reductive gas station, together with the installation of AKPiA and a telemetric system, and the connection of facilities to the gas supply system.Basic parameters planned for the construction of the gas pipeline:225 PE L = 14 320 m and the PE 180 L = 10 940 m pipeline.Basic parameters of the intended reducing station:— The skills of Q = 2000 Nm3/h — With an MOPSC of 5,5...)
(‎Created claim: summary (P836): The project consists of the construction of the I° medium pressure pipeline and gas station, together with the ACP and telemetry installation, and the connection of the facilities to the gas dispensing system. Basic parameters planned for the construction of the pipeline: Gas pipeline Dz225 PE L= 14320 m and gas pipeline Dz180 PE L= 10940 m. Basic parameters of the planned reduction station: — Pass rate Q = 2000 Nm3/h – ILO max. inlet pressure =...)
Property / summary
 
The project consists of the construction of the I° medium pressure pipeline and gas station, together with the ACP and telemetry installation, and the connection of the facilities to the gas dispensing system. Basic parameters planned for the construction of the pipeline: Gas pipeline Dz225 PE L= 14320 m and gas pipeline Dz180 PE L= 10940 m. Basic parameters of the planned reduction station: — Pass rate Q = 2000 Nm3/h – ILO max. inlet pressure = 5.5 MPa – Maximum output MOP = 0.5 MPa – Min. output pressure Pwyjmin = 0,15 MPa (English)
Property / summary: The project consists of the construction of the I° medium pressure pipeline and gas station, together with the ACP and telemetry installation, and the connection of the facilities to the gas dispensing system. Basic parameters planned for the construction of the pipeline: Gas pipeline Dz225 PE L= 14320 m and gas pipeline Dz180 PE L= 10940 m. Basic parameters of the planned reduction station: — Pass rate Q = 2000 Nm3/h – ILO max. inlet pressure = 5.5 MPa – Maximum output MOP = 0.5 MPa – Min. output pressure Pwyjmin = 0,15 MPa (English) / rank
 
Normal rank
Property / summary: The project consists of the construction of the I° medium pressure pipeline and gas station, together with the ACP and telemetry installation, and the connection of the facilities to the gas dispensing system. Basic parameters planned for the construction of the pipeline: Gas pipeline Dz225 PE L= 14320 m and gas pipeline Dz180 PE L= 10940 m. Basic parameters of the planned reduction station: — Pass rate Q = 2000 Nm3/h – ILO max. inlet pressure = 5.5 MPa – Maximum output MOP = 0.5 MPa – Min. output pressure Pwyjmin = 0,15 MPa (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:33, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of gas network medium pressure Kutno-Krośniewice with the gas station
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    0 references
    0 references
    4,775,023.75 zloty
    0 references
    1,146,005.7 Euro
    13 January 2020
    0 references
    5,617,675.0 zloty
    0 references
    1,348,242.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    30 June 2017
    0 references
    31 August 2018
    0 references
    DUON DYSTRYBUCJA SP. Z O.O.
    0 references
    0 references

    52°15'22.0"N, 19°10'8.0"E
    0 references

    52°11'15.0"N, 19°26'48.1"E
    0 references

    52°14'31.6"N, 19°17'13.2"E
    0 references
    Projekt polega na budowie gazociągu średn. ciśnienia i stacji gazowej redukcyjnej I°, wraz z instalacją AKPiA oraz telemetryczną, oraz podłączeniu obiektów do systemu dyspozycji gazem. Podstawowe parametry planowanego do wybudowania gazociągu: Gazociąg Dz225 PE L= 14320m i Gazociąg Dz180 PE L= 10940m. Podstawowe parametry planowanej stacji redukcyjnej: - Przepustowość Q = 2000 Nm3/h - Maks. ciśn. dolotowe MOPwej = 5,5 MPa - Maks. ciśn. wyjściowe MOPwyj = 0,5 MPa - Min. ciśn. wyjściowe Pwyjmin = 0,15 MPa (Polish)
    0 references
    The project consists of the construction of the I° medium pressure pipeline and gas station, together with the ACP and telemetry installation, and the connection of the facilities to the gas dispensing system. Basic parameters planned for the construction of the pipeline: Gas pipeline Dz225 PE L= 14320 m and gas pipeline Dz180 PE L= 10940 m. Basic parameters of the planned reduction station: — Pass rate Q = 2000 Nm3/h – ILO max. inlet pressure = 5.5 MPa – Maximum output MOP = 0.5 MPa – Min. output pressure Pwyjmin = 0,15 MPa (English)
    14 October 2020
    0 references

    Identifiers

    POIS.07.01.00-00-0026/16
    0 references