Construction of a tram line from the Wilczak loop to Naples in Poznań (Q86086): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project and the execution of the works for the construction of a double-oriented tram line on ul.Napraowice section from the Wilczak loop to ul.Ms Błażaja.The project involves the construction of:track infrastructure, network infrastructure, railway station infrastructure, underground installations within the prescribed technical conditions of network gestures, road surfaces and pedestrian pavements forming an integral part of the areas of...) |
(Created claim: summary (P836): Design and execution of construction works for the construction of a two-tier tram route in the street. Naramowice on the section from the Wilczak loop to the area of ul. It’s a clown. The project involves the construction of: track infrastructure, network infrastructure, engineering downstream infrastructure, underground installations to the extent of the technical conditions of the network’s Gestapo, road pavements and pedestrian tracks formin...) |
||||||||||||||
Property / summary | |||||||||||||||
Design and execution of construction works for the construction of a two-tier tram route in the street. Naramowice on the section from the Wilczak loop to the area of ul. It’s a clown. The project involves the construction of: track infrastructure, network infrastructure, engineering downstream infrastructure, underground installations to the extent of the technical conditions of the network’s Gestapo, road pavements and pedestrian tracks forming an integral part of the street space covered by the project. (English) | |||||||||||||||
Property / summary: Design and execution of construction works for the construction of a two-tier tram route in the street. Naramowice on the section from the Wilczak loop to the area of ul. It’s a clown. The project involves the construction of: track infrastructure, network infrastructure, engineering downstream infrastructure, underground installations to the extent of the technical conditions of the network’s Gestapo, road pavements and pedestrian tracks forming an integral part of the street space covered by the project. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Design and execution of construction works for the construction of a two-tier tram route in the street. Naramowice on the section from the Wilczak loop to the area of ul. It’s a clown. The project involves the construction of: track infrastructure, network infrastructure, engineering downstream infrastructure, underground installations to the extent of the technical conditions of the network’s Gestapo, road pavements and pedestrian tracks forming an integral part of the street space covered by the project. (English) / qualifier | |||||||||||||||
point in time: 14 October 2020
|
Revision as of 15:32, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a tram line from the Wilczak loop to Naples in Poznań |
Project in Poland financed by DG Regio |
Statements
109,002,900.02 zloty
0 references
187,741,818.85 zloty
0 references
58.06 percent
0 references
1 January 2014
0 references
31 December 2022
0 references
MIASTO POZNAŃ
0 references
Projekt oraz wykonastwo robót budowlanych dla budowy dwutotrowej trasy tramwajowej w ciągu ul. Naramowice na odcinku od pętli Wilczak do rejonu ul. Błażeja. Projekt zakłada budowę: infrastruktury torowej, infrastruktury sieciowej, infrastruktury przystankowej obieku inżynierskiego, instalacji podziemnych w zakresie przewidzianym warunkami technicznymi gestorów sieci, też nawierzchni drogowych i ciagów pieszych stanowiących integralną część przestrzeni ulic objętych zakresem projektu. (Polish)
0 references
Design and execution of construction works for the construction of a two-tier tram route in the street. Naramowice on the section from the Wilczak loop to the area of ul. It’s a clown. The project involves the construction of: track infrastructure, network infrastructure, engineering downstream infrastructure, underground installations to the extent of the technical conditions of the network’s Gestapo, road pavements and pedestrian tracks forming an integral part of the street space covered by the project. (English)
14 October 2020
0 references
Identifiers
POIS.06.01.00-00-0039/16
0 references