Construction of a tram line to Vilnius with the purchase of rolling stock and associated infrastructure. (Q86080): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project involves the construction of three sections of the tram line to Vilnius.Two sections within the line of Rakowiecka — Pulawy — Govorna — Spacerowa — Belwederska — Sobieski — al.The Republic of Poland (with the construction of the relevant terminals) and the third section on ul.A battle of Warsaw on the section from ul.Grójec to West Denmark, with a total length of ca.11.70 km.The final length of the route will be determined on the b...) |
(Created claim: summary (P836): The project includes the construction of three sections of the tram route to Wilanów. Two sections within Rakowiecka Street – Puławska – Goworka – Walk – Belwederska – Sobieskiego – al. Rzeczpospolita (including the construction of relevant frontal terminals) and the third section within ul. The Battle of Warsaw 1920 on the section from ul. Grójecka to the Western Railway Station with a total length of approx. It’s 11,70 miles. The final length...) |
||||||||||||||
Property / summary | |||||||||||||||
The project includes the construction of three sections of the tram route to Wilanów. Two sections within Rakowiecka Street – Puławska – Goworka – Walk – Belwederska – Sobieskiego – al. Rzeczpospolita (including the construction of relevant frontal terminals) and the third section within ul. The Battle of Warsaw 1920 on the section from ul. Grójecka to the Western Railway Station with a total length of approx. It’s 11,70 miles. The final length of the route will be determined on the basis of the design documentation. (English) | |||||||||||||||
Property / summary: The project includes the construction of three sections of the tram route to Wilanów. Two sections within Rakowiecka Street – Puławska – Goworka – Walk – Belwederska – Sobieskiego – al. Rzeczpospolita (including the construction of relevant frontal terminals) and the third section within ul. The Battle of Warsaw 1920 on the section from ul. Grójecka to the Western Railway Station with a total length of approx. It’s 11,70 miles. The final length of the route will be determined on the basis of the design documentation. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project includes the construction of three sections of the tram route to Wilanów. Two sections within Rakowiecka Street – Puławska – Goworka – Walk – Belwederska – Sobieskiego – al. Rzeczpospolita (including the construction of relevant frontal terminals) and the third section within ul. The Battle of Warsaw 1920 on the section from ul. Grójecka to the Western Railway Station with a total length of approx. It’s 11,70 miles. The final length of the route will be determined on the basis of the design documentation. (English) / qualifier | |||||||||||||||
point in time: 14 October 2020
|
Revision as of 15:32, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a tram line to Vilnius with the purchase of rolling stock and associated infrastructure. |
Project in Poland financed by DG Regio |
Statements
554,638,744.87 zloty
0 references
973,069,700.0 zloty
0 references
57.0 percent
0 references
29 January 2014
0 references
31 July 2021
0 references
TRAMWAJE WARSZAWSKIE SP. Z O.O.
0 references
Projekt obejmuje budowę trzech odcinków trasy tramwajowej do Wilanowa. Dwóch odcinków w ciągu ulic Rakowieckiej – Puławskiej – Goworka – Spacerowej – Belwederskiej – Sobieskiego – al. Rzeczpospolitej (wraz z budową odpowiednich terminali czołowych) oraz trzeciego odcinka w ciągu ul. Bitwy Warszawskiej 1920 r. na odcinku od ul. Grójeckiej do Dworca Zachodniego o łącznej długości ok. 11,70 km. Ostateczna długość trasy zostanie ustalona na podstawie opracowanej dokumentacji projektowej. (Polish)
0 references
The project includes the construction of three sections of the tram route to Wilanów. Two sections within Rakowiecka Street – Puławska – Goworka – Walk – Belwederska – Sobieskiego – al. Rzeczpospolita (including the construction of relevant frontal terminals) and the third section within ul. The Battle of Warsaw 1920 on the section from ul. Grójecka to the Western Railway Station with a total length of approx. It’s 11,70 miles. The final length of the route will be determined on the basis of the design documentation. (English)
14 October 2020
0 references
Identifiers
POIS.06.01.00-00-0033/16
0 references