Integrated System of Transportation in Agglomeration and in Wrocław-Stage III A (Q86073): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): Construction of a tramway track with the necessary collision construction.Reconstruction of the railway viaduct for the purpose of the route in ul.Long.Multi-screen design (road, track, telecommunications, electrical, water, bridge, etc.), remove_old_english_translation)
(‎Created claim: summary (P836): The construction of the tramway track along with the necessary reconstruction of the collision weaponry. Reconstruction of the railway viaduct for the purpose of the route in ul. A long one. Multi-discipline design (road, track, teletechnical, electrical, water-channel, bridge, etc.), translated_summary)
Property / summary
 
The construction of the tramway track along with the necessary reconstruction of the collision weaponry. Reconstruction of the railway viaduct for the purpose of the route in ul. A long one. Multi-discipline design (road, track, teletechnical, electrical, water-channel, bridge, etc.) (English)
Property / summary: The construction of the tramway track along with the necessary reconstruction of the collision weaponry. Reconstruction of the railway viaduct for the purpose of the route in ul. A long one. Multi-discipline design (road, track, teletechnical, electrical, water-channel, bridge, etc.) (English) / rank
 
Normal rank
Property / summary: The construction of the tramway track along with the necessary reconstruction of the collision weaponry. Reconstruction of the railway viaduct for the purpose of the route in ul. A long one. Multi-discipline design (road, track, teletechnical, electrical, water-channel, bridge, etc.) (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:31, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Integrated System of Transportation in Agglomeration and in Wrocław-Stage III A
Project in Poland financed by DG Regio

    Statements

    0 references
    96,740,853.0 zloty
    0 references
    23,217,804.72 Euro
    13 January 2020
    0 references
    128,987,805.0 zloty
    0 references
    30,957,073.2 Euro
    13 January 2020
    0 references
    75.0 percent
    0 references
    4 September 2015
    0 references
    30 June 2023
    0 references
    GMINA WROCŁAW
    0 references
    0 references
    0 references

    51°7'34.7"N, 16°58'41.5"E
    0 references
    Budowa torowiska tramwajowego wraz z niezbędną przebudową kolizyjnego uzbrojenia. Przebudowa wiaduktu kolejowego na potrzeby trasy w ul. Długiej. Projekt wielobranżowy (branża drogowa, torowa, teletechniczna, elektryczna, wod-kan, mostowa itp..) (Polish)
    0 references
    The construction of the tramway track along with the necessary reconstruction of the collision weaponry. Reconstruction of the railway viaduct for the purpose of the route in ul. A long one. Multi-discipline design (road, track, teletechnical, electrical, water-channel, bridge, etc.) (English)
    14 October 2020
    0 references

    Identifiers

    POIS.06.01.00-00-0026/16
    0 references