Integrated System of Transportation in Agglomeration and in Wrocław-Stage III A (Q86073): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): Construction of a tramway track with the necessary collision construction.Reconstruction of the railway viaduct for the purpose of the route in ul.Long.Multi-screen design (road, track, telecommunications, electrical, water, bridge, etc.), remove_old_english_translation) |
(Created claim: summary (P836): The construction of the tramway track along with the necessary reconstruction of the collision weaponry. Reconstruction of the railway viaduct for the purpose of the route in ul. A long one. Multi-discipline design (road, track, teletechnical, electrical, water-channel, bridge, etc.), translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The construction of the tramway track along with the necessary reconstruction of the collision weaponry. Reconstruction of the railway viaduct for the purpose of the route in ul. A long one. Multi-discipline design (road, track, teletechnical, electrical, water-channel, bridge, etc.) (English) | |||||||||||||||
Property / summary: The construction of the tramway track along with the necessary reconstruction of the collision weaponry. Reconstruction of the railway viaduct for the purpose of the route in ul. A long one. Multi-discipline design (road, track, teletechnical, electrical, water-channel, bridge, etc.) (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The construction of the tramway track along with the necessary reconstruction of the collision weaponry. Reconstruction of the railway viaduct for the purpose of the route in ul. A long one. Multi-discipline design (road, track, teletechnical, electrical, water-channel, bridge, etc.) (English) / qualifier | |||||||||||||||
point in time: 14 October 2020
|
Revision as of 15:31, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Integrated System of Transportation in Agglomeration and in Wrocław-Stage III A |
Project in Poland financed by DG Regio |
Statements
96,740,853.0 zloty
0 references
128,987,805.0 zloty
0 references
75.0 percent
0 references
4 September 2015
0 references
30 June 2023
0 references
GMINA WROCŁAW
0 references
Budowa torowiska tramwajowego wraz z niezbędną przebudową kolizyjnego uzbrojenia. Przebudowa wiaduktu kolejowego na potrzeby trasy w ul. Długiej. Projekt wielobranżowy (branża drogowa, torowa, teletechniczna, elektryczna, wod-kan, mostowa itp..) (Polish)
0 references
The construction of the tramway track along with the necessary reconstruction of the collision weaponry. Reconstruction of the railway viaduct for the purpose of the route in ul. A long one. Multi-discipline design (road, track, teletechnical, electrical, water-channel, bridge, etc.) (English)
14 October 2020
0 references
Identifiers
POIS.06.01.00-00-0026/16
0 references