Q85957 (Q85957): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): A single-nave tunnel is assumed to be constructed in the TBM hollow shield technology. It’s 1,44 miles. The other elements of the road system will be: access roads to the tunnel: I will recognise access roads to the tunnel with toll station, Wolin Island access roads to the tunnel and roundabout., translated_summary) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 14:55, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Poland financed by DG Regio |
Statements
775,677,722.67 zloty
0 references
912,562,026.68 zloty
0 references
85.0 percent
0 references
1 January 2014
0 references
31 March 2023
0 references
GMINA MIASTO ŚWINOUJŚCIE
0 references
Zakłada się wykonanie tunelu jednonawowego w technologii tarczy drążonej TBM, dł. 1,44 km. Pozostałymi elementami układu drogowego będą: drogi dojazdowe do tunelu: wyspa Uznam drogi dojazdowe do tunelu wraz ze stacją poboru opłat, wyspa Wolin drogi dojazdowe do tunelu oraz rondo. (Polish)
0 references
A single-nave tunnel is assumed to be constructed in the TBM hollow shield technology. It’s 1,44 miles. The other elements of the road system will be: access roads to the tunnel: I will recognise access roads to the tunnel with toll station, Wolin Island access roads to the tunnel and roundabout. (English)
14 October 2020
0 references
Identifiers
POIS.04.02.00-00-0021/16
0 references