(‎Removed claim: summary (P836): The project consists of reconverting district heating networks with thermal insulated heat and affected by the corrosion of district heating to a non-ducted district heating network from advanced pre-insulated pipes and the construction of 81 individual high efficiency heat exchanger units.The task consists of three construction tasks., remove_old_english_translation)
(‎Created claim: summary (P836): The project consists of the conversion of channel heating networks with degraded thermal insulation and damaged by corrosion with heating pipes into a channelless heating network from modern pre-insulated pipes and the construction of 81 individual high-efficiency heat exchangers. The task consists of three construction tasks., translated_summary)
Property / summary
 
The project consists of the conversion of channel heating networks with degraded thermal insulation and damaged by corrosion with heating pipes into a channelless heating network from modern pre-insulated pipes and the construction of 81 individual high-efficiency heat exchangers. The task consists of three construction tasks. (English)
Property / summary: The project consists of the conversion of channel heating networks with degraded thermal insulation and damaged by corrosion with heating pipes into a channelless heating network from modern pre-insulated pipes and the construction of 81 individual high-efficiency heat exchangers. The task consists of three construction tasks. (English) / rank
 
Normal rank
Property / summary: The project consists of the conversion of channel heating networks with degraded thermal insulation and damaged by corrosion with heating pipes into a channelless heating network from modern pre-insulated pipes and the construction of 81 individual high-efficiency heat exchangers. The task consists of three construction tasks. (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:52, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Decommissioning of the group heating substation ‘B-2’, B-1’ and ‘T-1’ in Tychy.
Project in Poland financed by DG Regio

    Statements

    0 references
    6,093,900.0 zloty
    0 references
    1,462,536.0 Euro
    13 January 2020
    0 references
    11,219,560.0 zloty
    0 references
    2,692,694.4 Euro
    13 January 2020
    0 references
    54.31 percent
    0 references
    30 December 2016
    0 references
    28 February 2023
    0 references
    PRZEDSIĘBIORSTWO ENERGETYKI CIEPLNEJ SP. Z O.O.
    0 references
    0 references
    0 references
    Projekt polega na przebudowie kanałowych sieci ciepłowniczych ze zdegradowaną izolacją termiczną i naruszonymi przez korozję rurami ciepłowniczymi na bezkanałową sieć ciepłowniczą z nowoczesnych rur preizolowanych oraz budowę 81 sztuk indywidualnych wysokosprawnych wymiennikowni ciepła. Na zadanie składają się trzy zadania budowlane. (Polish)
    0 references
    The project consists of the conversion of channel heating networks with degraded thermal insulation and damaged by corrosion with heating pipes into a channelless heating network from modern pre-insulated pipes and the construction of 81 individual high-efficiency heat exchangers. The task consists of three construction tasks. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.01.07.02-00-0008/16
    0 references