(Removed claim: summary (P836): The project consists of reconverting district heating networks with thermal insulated heat and affected by the corrosion of district heating to a non-ducted district heating network from advanced pre-insulated pipes and the construction of 81 individual high efficiency heat exchanger units.The task consists of three construction tasks., remove_old_english_translation) |
(Created claim: summary (P836): The project consists of the conversion of channel heating networks with degraded thermal insulation and damaged by corrosion with heating pipes into a channelless heating network from modern pre-insulated pipes and the construction of 81 individual high-efficiency heat exchangers. The task consists of three construction tasks., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The project consists of the conversion of channel heating networks with degraded thermal insulation and damaged by corrosion with heating pipes into a channelless heating network from modern pre-insulated pipes and the construction of 81 individual high-efficiency heat exchangers. The task consists of three construction tasks. (English) | |||||||||||||||
Property / summary: The project consists of the conversion of channel heating networks with degraded thermal insulation and damaged by corrosion with heating pipes into a channelless heating network from modern pre-insulated pipes and the construction of 81 individual high-efficiency heat exchangers. The task consists of three construction tasks. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project consists of the conversion of channel heating networks with degraded thermal insulation and damaged by corrosion with heating pipes into a channelless heating network from modern pre-insulated pipes and the construction of 81 individual high-efficiency heat exchangers. The task consists of three construction tasks. (English) / qualifier | |||||||||||||||
point in time: 14 October 2020
|
Revision as of 14:52, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Decommissioning of the group heating substation ‘B-2’, B-1’ and ‘T-1’ in Tychy. |
Project in Poland financed by DG Regio |
Statements
6,093,900.0 zloty
0 references
11,219,560.0 zloty
0 references
54.31 percent
0 references
30 December 2016
0 references
28 February 2023
0 references
PRZEDSIĘBIORSTWO ENERGETYKI CIEPLNEJ SP. Z O.O.
0 references
Projekt polega na przebudowie kanałowych sieci ciepłowniczych ze zdegradowaną izolacją termiczną i naruszonymi przez korozję rurami ciepłowniczymi na bezkanałową sieć ciepłowniczą z nowoczesnych rur preizolowanych oraz budowę 81 sztuk indywidualnych wysokosprawnych wymiennikowni ciepła. Na zadanie składają się trzy zadania budowlane. (Polish)
0 references
The project consists of the conversion of channel heating networks with degraded thermal insulation and damaged by corrosion with heating pipes into a channelless heating network from modern pre-insulated pipes and the construction of 81 individual high-efficiency heat exchangers. The task consists of three construction tasks. (English)
14 October 2020
0 references
Identifiers
POIS.01.07.02-00-0008/16