Modernisation of district heating and dismantling of low emissions in Tychy in 2017-2023 (Q85009): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project consists of the rebuilding of district heating networks with heat insulated and affected by the corrosion of district heating, on a non-ducted district heating network of modern pre-insulated pipes with the construction of 21 individual high efficiency heat exchangers and the construction of new residential district heating networks, which allow for the connection to the network of buildings in order to wind up the local coal boile...) |
(Created claim: summary (P836): The project consists of remodeling district heating networks with degraded thermal insulation and damaged by corrosion with heating pipes, into a sewerless district heating network from modern pre-insulated pipes with the construction of 21 individual high-efficiency heat exchangers and the construction of new district heating networks, allowing for connection to the grid of buildings for the purpose of dismantling local coal boilers. The projec...) |
||||||||||||||
Property / summary | |||||||||||||||
The project consists of remodeling district heating networks with degraded thermal insulation and damaged by corrosion with heating pipes, into a sewerless district heating network from modern pre-insulated pipes with the construction of 21 individual high-efficiency heat exchangers and the construction of new district heating networks, allowing for connection to the grid of buildings for the purpose of dismantling local coal boilers. The project will reduce transmission heat losses on grids and heat nodes, reduce network failure and increase its durability and reduce the amount of gaseous and particulate pollutants emitted into the air, as well as environmentally burdensome combustion waste. (English) | |||||||||||||||
Property / summary: The project consists of remodeling district heating networks with degraded thermal insulation and damaged by corrosion with heating pipes, into a sewerless district heating network from modern pre-insulated pipes with the construction of 21 individual high-efficiency heat exchangers and the construction of new district heating networks, allowing for connection to the grid of buildings for the purpose of dismantling local coal boilers. The project will reduce transmission heat losses on grids and heat nodes, reduce network failure and increase its durability and reduce the amount of gaseous and particulate pollutants emitted into the air, as well as environmentally burdensome combustion waste. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project consists of remodeling district heating networks with degraded thermal insulation and damaged by corrosion with heating pipes, into a sewerless district heating network from modern pre-insulated pipes with the construction of 21 individual high-efficiency heat exchangers and the construction of new district heating networks, allowing for connection to the grid of buildings for the purpose of dismantling local coal boilers. The project will reduce transmission heat losses on grids and heat nodes, reduce network failure and increase its durability and reduce the amount of gaseous and particulate pollutants emitted into the air, as well as environmentally burdensome combustion waste. (English) / qualifier | |||||||||||||||
point in time: 14 October 2020
|
Revision as of 14:51, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernisation of district heating and dismantling of low emissions in Tychy in 2017-2023 |
Project in Poland financed by DG Regio |
Statements
8,108,430.0 zloty
0 references
15,166,818.13 zloty
0 references
53.46 percent
0 references
29 May 2017
0 references
31 December 2023
0 references
PRZEDSIĘBIORSTWO ENERGETYKI CIEPLNEJ SP. Z O.O.
0 references
Projekt polega na przebudowie kanałowych sieci ciepłowniczych ze zdegradowaną izolacją termiczną i naruszonymi przez korozję rurami ciepłowniczymi , na bezkanałową sieć ciepłowniczą z nowoczesnych rur preizolowanych wraz z budową 21 szt. indywidualnych wysokosprawnych wymiennikowni ciepła oraz na budowie nowych osiedlowych sieci ciepłowniczych , pozwalających na przyłączenie do sieci budynków ,w celu likwidacji lokalnych kotłowni węglowych. Przedmiotowe przedsięwzięcie spowoduje zmniejszenie przesyłowych strat ciepła na sieciach i w węzłach cieplnych , zmniejszenie awaryjności sieci i zwiększenie jej trwałości oraz redukcje ilości emitowanych do powietrza zanieczyszczeń gazowych i pyłowych oraz odpadów paleniskowych obciążających środowisko. (Polish)
0 references
The project consists of remodeling district heating networks with degraded thermal insulation and damaged by corrosion with heating pipes, into a sewerless district heating network from modern pre-insulated pipes with the construction of 21 individual high-efficiency heat exchangers and the construction of new district heating networks, allowing for connection to the grid of buildings for the purpose of dismantling local coal boilers. The project will reduce transmission heat losses on grids and heat nodes, reduce network failure and increase its durability and reduce the amount of gaseous and particulate pollutants emitted into the air, as well as environmentally burdensome combustion waste. (English)
14 October 2020
0 references
Identifiers
POIS.01.07.02-00-0004/17
0 references