Construction of S6 Slupsk — Gdańsk, odc. Bożefield Wielkie — start of the Tricity ring road (Q85865): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project aims at building the S6 S Slupsk — Gdańsk, odc.Bożefield Wielkie — beginning of a bypass between the Tricity triangle40.85 km of the comprehensive TEN-T network. the project is implemented in P & B system within 3 tasks:— Activity 1:Bożefield Wielkie (with interchange) from Luzino (with interchange), — Activity 2:Luzino node (without junction) — Shemid Century (with interchange), — Zadanie 3:Sheemid interchange (without junction) —...) |
(Created claim: summary (P836): The project aims at the construction of the S6 Słupsk – Gdańsk expressway, pc. Bowiepole Wielkie – the beginning of the Tri-City ring road. 40.85 km, located in the TEN-T comprehensive network. The project is implemented in the P&B system as part of 3 tasks: — Task 1: Bożepole Wielkie (with a knot) – Fr. Luzino (with a knot), – Task 2: Luzino knot (without knot) – w. Szemud (with a knot), – Task 3: Szemud knot (without a knot) – w. Gdynia Wielki...) |
||||||||||||||
Property / summary | |||||||||||||||
The project aims at the construction of the S6 Słupsk – Gdańsk expressway, pc. Bowiepole Wielkie – the beginning of the Tri-City ring road. 40.85 km, located in the TEN-T comprehensive network. The project is implemented in the P&B system as part of 3 tasks: — Task 1: Bożepole Wielkie (with a knot) – Fr. Luzino (with a knot), – Task 2: Luzino knot (without knot) – w. Szemud (with a knot), – Task 3: Szemud knot (without a knot) – w. Gdynia Wielki Kack (with a knot). (English) | |||||||||||||||
Property / summary: The project aims at the construction of the S6 Słupsk – Gdańsk expressway, pc. Bowiepole Wielkie – the beginning of the Tri-City ring road. 40.85 km, located in the TEN-T comprehensive network. The project is implemented in the P&B system as part of 3 tasks: — Task 1: Bożepole Wielkie (with a knot) – Fr. Luzino (with a knot), – Task 2: Luzino knot (without knot) – w. Szemud (with a knot), – Task 3: Szemud knot (without a knot) – w. Gdynia Wielki Kack (with a knot). (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project aims at the construction of the S6 Słupsk – Gdańsk expressway, pc. Bowiepole Wielkie – the beginning of the Tri-City ring road. 40.85 km, located in the TEN-T comprehensive network. The project is implemented in the P&B system as part of 3 tasks: — Task 1: Bożepole Wielkie (with a knot) – Fr. Luzino (with a knot), – Task 2: Luzino knot (without knot) – w. Szemud (with a knot), – Task 3: Szemud knot (without a knot) – w. Gdynia Wielki Kack (with a knot). (English) / qualifier | |||||||||||||||
point in time: 14 October 2020
|
Revision as of 14:50, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of S6 Slupsk — Gdańsk, odc. Bożefield Wielkie — start of the Tricity ring road |
Project in Poland financed by DG Regio |
Statements
984,169,193.38 zloty
0 references
1,157,846,109.87 zloty
0 references
85.0 percent
0 references
1 January 2014
0 references
31 December 2023
0 references
GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
0 references
Projekt ma na celu budowę drogi ekspresowej S6 Słupsk – Gdańsk, odc. Bożepole Wielkie - początek obwodnicy Trójmiasta o dł. 40,85 km, zlokalizowanej w sieci kompleksowej TEN-T. Projekt jest realizowany w systemie P&B w ramach 3 zadań: - Zadanie 1: Bożepole Wielkie (z węzłem) – w. Luzino (z węzłem), - Zadanie 2: węzeł Luzino (bez węzła) – w. Szemud (z węzłem), - Zadanie 3: węzeł Szemud (bez węzła) – w. Gdynia Wielki Kack (z węzłem). (Polish)
0 references
The project aims at the construction of the S6 Słupsk – Gdańsk expressway, pc. Bowiepole Wielkie – the beginning of the Tri-City ring road. 40.85 km, located in the TEN-T comprehensive network. The project is implemented in the P&B system as part of 3 tasks: — Task 1: Bożepole Wielkie (with a knot) – Fr. Luzino (with a knot), – Task 2: Luzino knot (without knot) – w. Szemud (with a knot), – Task 3: Szemud knot (without a knot) – w. Gdynia Wielki Kack (with a knot). (English)
14 October 2020
0 references
Identifiers
POIS.03.01.00-00-0044/18
0 references