(Created claim: summary (P836): The implementation of the proposed project envisages the conversion of neglected and mostly undeclared areas into functional urban green areas. The applicant, the beneficiary of the grant and the owner and later operator of the green areas covered by the project will be the Municipality of Resko.The project will include works on 4 sites located in the city of Resko: 1. “NAD Rega” – integral. 29028 m², of which 10640 m² currently does not functio...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 14:45, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Poland financed by DG Regio |
Statements
3,468,438.4 zloty
0 references
4,080,515.77 zloty
0 references
85.0 percent
0 references
1 January 2014
0 references
31 March 2019
0 references
GMINA RESKO
0 references
Realizacja wnioskowanego projektu przewiduje prace związane z przekształceniem zaniedbanych i w większości nieurządznych terenów na funkcjonalne tereny zieleni miejskiej. Wnioskodawcą, Beneficjentem dotacji, oraz właścicielem oraz późniejszym operatorem terenów zieleni będących przedmiotem projektu będzie Gmina Resko.Projekt obejmować będzie prace na 4 terenach zlokalizowanych w mieście Resko: 1. „NAD REGĄ” – pow. całk. 29 028 m2, z czego 10 640 m2 nie pełni obecnie funkcji terenu zieleni – planuje się wykonanie nasadzeń, montaż elementów małej architektury, budowę alejek i oświetlenia, oczyszczenie zbiornika wodnego i wykonanie piaszczystej plaży, umocnienie skarpy. Koszt: 609 135,02 zł brutto 2. „PRZY STADIONIE” - pow. całk. 10 157 m2 – planuje się wykonanie nasadzeń, montaż elementów małej architektury, budowę alejek, placu zabaw i oświetlenia. Koszt: 542 380,04 zł brutto 3. „PRZY DOMU KULTURY” - pow. całk. 10 739 m2, z czego 10 111 m2 nie pełni obecnie funkcji terenu zieleni – planuje się wykonanie nasadzeń, montaż elementów małej architektury, budowę alejek, placu zabaw, sceny z widownią oraz oświetlenia, wykonanie robót ziemnych. Koszt: 592 126,15 zł brutto 4. „ZA WAŁEM” - pow. całk. 16 712 m2, z czego 15 867 m2 nie pełni obecnie funkcji terenu zieleni – planuje się wykonanie nasadzeń, montaż elementów małej architektury, budowę alejek, placu zabaw i oświetlenia. Koszt: 1 009 325,84 zł brutto (Polish)
0 references
The implementation of the proposed project envisages the conversion of neglected and mostly undeclared areas into functional urban green areas. The applicant, the beneficiary of the grant and the owner and later operator of the green areas covered by the project will be the Municipality of Resko.The project will include works on 4 sites located in the city of Resko: 1. “NAD Rega” – integral. 29028 m², of which 10640 m² currently does not function as a green area – plantings, installation of small architectural elements, construction of alleys and lighting, cleaning the water reservoir and making a sandy beach, strengthening the slope. Cost: 609 135.02 PLN gross 2. “Her stadium” – integral. 10157 m² – plantings, installation of small architectural elements, construction of alleys, playground and lighting are planned. Cost: 542 380.04 PLN gross 3. “FROM THE COMMUNITY OF CULTURE” – the integral. 10739 m², of which 10111 m² currently does not function as a green area – plantings, installation of small architectural elements, construction of alleys, playground, stage with audience and lighting, earthworks are planned. Cost: 592 126.15 PLN gross 4. “At the rampart” – the integral. 16712 m², of which 15867 m² currently does not function as a green area – plantings, installation of small architectural elements, construction of alleys, playground and lighting are planned. Cost: 1 009 325.84 PLN gross (English)
14 October 2020
0 references
Identifiers
POIS.02.05.00-00-0148/16
0 references