Construction of a combined heat and power station in Minsk Mazowiecki (Q84890): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): This project is linked to the installation of a cogeneration system within the existing boiler of PEC Sp. z o. o. in Minsk Mazowiecki.As a result of the investment, the current boiler in Minsk Mazowiecki at ul.1 PLM Warszawa 1 will be converted into a combined heat and power plant.The project assumes the use of natural gas as a fuel.The electricity produced will be used for own purposes and the surplus will be sold to the Energy Plant.The proj...) |
(Created claim: summary (P836): This project is connected with the installation of the cogeneration system within the existing boiler room belonging to PEC Sp. z o. o. in Minsk Mazowiecki. As a result of the investment, the current boiler room operating in Minsk Mazowiecki on ul. 1 PLM Warszawa 1 will be transformed into a CHP plant. The project assumes the use of natural gas as fuel. The electricity produced will be used for own use and its excess will be sold to the Energy P...) |
||||||||||||||
Property / summary | |||||||||||||||
This project is connected with the installation of the cogeneration system within the existing boiler room belonging to PEC Sp. z o. o. in Minsk Mazowiecki. As a result of the investment, the current boiler room operating in Minsk Mazowiecki on ul. 1 PLM Warszawa 1 will be transformed into a CHP plant. The project assumes the use of natural gas as fuel. The electricity produced will be used for own use and its excess will be sold to the Energy Plant. The project will be implemented in Mazowieckie Voivodeship, Minsk County, the city of Mińsk Mazowiecki, on ul. 1PLM Warszawa 1, on land with geodesic number 2476/3, within the registration area 0001 Mińsk Mazowiecki. (English) | |||||||||||||||
Property / summary: This project is connected with the installation of the cogeneration system within the existing boiler room belonging to PEC Sp. z o. o. in Minsk Mazowiecki. As a result of the investment, the current boiler room operating in Minsk Mazowiecki on ul. 1 PLM Warszawa 1 will be transformed into a CHP plant. The project assumes the use of natural gas as fuel. The electricity produced will be used for own use and its excess will be sold to the Energy Plant. The project will be implemented in Mazowieckie Voivodeship, Minsk County, the city of Mińsk Mazowiecki, on ul. 1PLM Warszawa 1, on land with geodesic number 2476/3, within the registration area 0001 Mińsk Mazowiecki. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: This project is connected with the installation of the cogeneration system within the existing boiler room belonging to PEC Sp. z o. o. in Minsk Mazowiecki. As a result of the investment, the current boiler room operating in Minsk Mazowiecki on ul. 1 PLM Warszawa 1 will be transformed into a CHP plant. The project assumes the use of natural gas as fuel. The electricity produced will be used for own use and its excess will be sold to the Energy Plant. The project will be implemented in Mazowieckie Voivodeship, Minsk County, the city of Mińsk Mazowiecki, on ul. 1PLM Warszawa 1, on land with geodesic number 2476/3, within the registration area 0001 Mińsk Mazowiecki. (English) / qualifier | |||||||||||||||
point in time: 14 October 2020
|
Revision as of 14:43, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a combined heat and power station in Minsk Mazowiecki |
Project in Poland financed by DG Regio |
Statements
8,911,870.0 zloty
0 references
21,216,380.0 zloty
0 references
42.0 percent
0 references
29 January 2018
0 references
30 June 2020
0 references
PRZEDSIĘBIORSTWO ENERGETYKI CIEPLNEJ SPÓŁKA Z OGRANICZONA ODPOWIEDZIALNOŚCIĄ
0 references
Niniejsze przedsięwzięcie związane jest z instalacją układu kogeneracji w ramach istniejącej kotłowni należącej do PEC Sp. z o. o. w Mińsku Mazowieckim. W wyniku realizacji inwestycji obecna kotłownia funkcjonująca w Mińsku Mazowieckim przy ul. 1 PLM Warszawa 1 przekształci się w elektrociepłownię. W projekcie założono zastosowanie gazu ziemnego jako paliwa. Produkowana energia elektryczna będzie wykorzystywana na potrzeby własne, a jej nadmiar zostanie sprzedany do Zakładu Energetycznego. Projekt będzie realizowany w województwie mazowieckim, powiecie mińskim, mieście Mińsk Mazowiecki, przy ul. 1PLM Warszawa 1, na działce o numerze geodezyjnym 2476/3, w obrębie ewidencyjnym 0001 Mińsk Mazowiecki. (Polish)
0 references
This project is connected with the installation of the cogeneration system within the existing boiler room belonging to PEC Sp. z o. o. in Minsk Mazowiecki. As a result of the investment, the current boiler room operating in Minsk Mazowiecki on ul. 1 PLM Warszawa 1 will be transformed into a CHP plant. The project assumes the use of natural gas as fuel. The electricity produced will be used for own use and its excess will be sold to the Energy Plant. The project will be implemented in Mazowieckie Voivodeship, Minsk County, the city of Mińsk Mazowiecki, on ul. 1PLM Warszawa 1, on land with geodesic number 2476/3, within the registration area 0001 Mińsk Mazowiecki. (English)
14 October 2020
0 references
Identifiers
POIS.01.06.01-00-0020/18
0 references