Q84851 (Q84851): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The project consists of exchanging insulation on heat pipes arranged in heating channels, with diameters ranging from 2DN 100 to 2DN 600 and the exchange of heatworks for pre-insulated technologies. In the case of overhead heaters, only insulation will be replaced. The project will carry out 13 investment tasks, including 3 concerning district heating and 10 networks. In total, 4 heating chambers and ca. 6 169 meters of net., translated_summary)
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
label / enlabel / en
Thermal modernisation of the channel and air pipes in Gdynia, Rumi and Wejherowo.

Revision as of 14:40, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    12,302,180.0 zloty
    0 references
    2,952,523.20 Euro
    13 January 2020
    0 references
    21,890,000.0 zloty
    0 references
    5,253,600.0 Euro
    13 January 2020
    0 references
    56.2 percent
    0 references
    1 January 2017
    0 references
    31 December 2021
    0 references
    OKRĘGOWE PRZEDSIĘBIORSTWO ENERGETYKI CIEPLNEJ SPÓŁKA Z O.O.
    0 references
    0 references
    0 references
    Projekt polega na wymianie izolacji na ciepłociągach ułożonych w kanałach ciepłowniczych, o średnicach od 2DN 100 do 2DN 600 oraz wymianie ciepłociągów na technologie preizolowaną. W przypadku ciepłociągów napowietrznych wymianie będzie podlegać jedynie izolacja. W ramach Projektu zostanie zrealizowanych 13 zadań inwestycyjnych, w tym 3 dotyczące komór ciepłowniczych i 10 dotyczących sieci. Łącznie w ramach Projektu zmodernizowane zostaną 4 komory ciepłownicze i ok. 6 169 mb sieci. (Polish)
    0 references
    The project consists of exchanging insulation on heat pipes arranged in heating channels, with diameters ranging from 2DN 100 to 2DN 600 and the exchange of heatworks for pre-insulated technologies. In the case of overhead heaters, only insulation will be replaced. The project will carry out 13 investment tasks, including 3 concerning district heating and 10 networks. In total, 4 heating chambers and ca. 6 169 meters of net. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.01.05.00-00-0035/16
    0 references