Development of a technology for producing top mating with different functional layers using secondary raw materials (Q78547): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: translated_label) |
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
||
description / en | description / en | ||
Project in Poland | Project Q78547 in Poland | ||
description / pl | description / pl | ||
Projekt w Polsce | Projekt Q78547 w Polsce |
Revision as of 04:10, 29 October 2020
Project Q78547 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Development of a technology for producing top mating with different functional layers using secondary raw materials |
Project Q78547 in Poland |
Statements
6,074,281.25 zloty
0 references
11,922,047.5 zloty
0 references
50.95 percent
0 references
1 June 2019
0 references
31 July 2021
0 references
„IZOBUD” SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Przedmiotem projektu jest przeprowadzenie prac B+R mających na celu opracowanie i wdrożenie we własnej działalności firmy innowacji procesowej. Zaprojektowana i zbudowana w trakcie trwania projektu instalacja pilotażowa oparta będzie na opracowanej przez firmę Izobud koncepcji nowej metody produkcji membran bitumicznych (pap modyfikowanych) posiadających dwie, różne warstwy funkcjonalne (górna i dolna). Dodatkowo Wnioskodawca zamierza opracować nową recepturę masy bitumicznej, w której część najdroższego i bardzo ważnego surowca tj. SBS zostanie zastąpiona przez ścier gumowy z recyklingu, przy zachowaniu co najmniej dotychczasowych parametrów masy bitumicznej. Planowana innowacja procesowa będzie nowością przynajmniej na rynku polskim. Wnioskodawca zakłada, że w wyniku realizacji projektu będzie mógł znacząco obniżyć koszty produkcji pap modyfikowanych i zaoferować produkt odpowiadający w większym stopniu na potrzeby rynkowe. Grupa docelowa klientów po realizacji projektu nie zmieni się. Prace badawcze zostały podzielone na dwa etapy: 1. Badania przemysłowe, podczas których prowadzone będą działania zmierzające do odpowiedniego doboru surowca wtórnego tj. produktu recyklingu gumy w celu częściowego zastąpienia przez niego kopolimeru SBS jako modyfikatora oraz przeprowadzona zostanie, w oparciu o symulacje numeryczne, ocena konstrukcji kluczowych elementów instalacji produkcyjnej i zachodzących w nich procesów, 2. Prace rozwojowe, w ramach których zostanie zaprojektowana, zbudowana oraz przetestowana w trybie pracy ciągłej instalacja pilotażowa. Prowadzona będzie również analiza parametrów produktów gotowych wytwarzanych za pomocą tej instalacji. Zgodnie z art. 25 rozporządzenia KE nr 651/2014 z dnia 17 czerwca 2014 r. uznające niektóre rodzaje pomocy za zgodne z rynkiem wewnętrznym w stosowaniu art. 107 i 108 Traktatu (Dz. Urz. UE L 187/1 z 26.06.2014) (Polish)
0 references
The subject of the project is to carry out R & D works aimed at developing and implementing process innovation in its own activity. The pilot installation designed and built during the project will be based on the concept developed by IZOBUD for a new method of production of bituminous membranes (modified paps) with two different functional layers (top and lower). In addition, the applicant intends to develop a new formula of bituminous mass, in which part of the most expensive and very important raw material, i.e. SBS will be replaced by recycled rubber pulp, maintaining at least the current bituminous mass parameters. The planned process innovation will be a novelty at least on the Polish market. The applicant assumes that, as a result of the project, it will be able to significantly reduce the production costs of modified paps and offer a more market-driven product. The target group of customers after the implementation of the project will not change. The research work has been divided into two stages: 1. Industrial research, during which activities will be carried out to appropriate selection of secondary raw material, i.e. rubber recycling product, in order to partially replace the SBS copolymer as a modifier and will assess, based on numerical simulations, the construction of key components of the production installation and the processes involved, 2. Development works under which it will be designed, built and tested in continuous operation of a pilot installation. The parameters of finished products produced by this installation will also be analysed. Pursuant to Article 25 of Regulation (EC) No 651/2014 of 17 June 2014 declaring certain types of aid compatible with the internal market in the application of Articles 107 and 108 of the Treaty (OJ L. I'm sorry. EU L 187/1 of 26.06.2014) (English)
14 October 2020
0 references
Identifiers
POIR.01.01.01-00-1025/18
0 references