Construction of the road for the Bilinka Billinka bicycles to be completed — section Full — municipality border (Q137590): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): Intervention shall be directed towards improving public communication in the municipality of Full, i.e. reducing congestion and facilitating the use of public transport. The project concerns the construction of a road for bicycles connecting the municipality of Barlinek from the city centre to the city centre in Full. As part of the investment, two parking places will be built — within the investment area and in the city centre. The length of...) |
||
Property / summary | |||
Property / summary: Intervention shall be directed towards improving public communication in the municipality of Full, i.e. reducing congestion and facilitating the use of public transport. The project concerns the construction of a road for bicycles connecting the municipality of Barlinek from the city centre to the city centre in Full. As part of the investment, two parking places will be built — within the investment area and in the city centre. The length of the planned cycle path is 4.747 km. The following tasks must be carried out as part of the implementation of the investment: • Development of the technical documentation• Development of a feasibility study• The development of a cycle road within the district road (km 0 + 137,40)• Construction of a road within a provincial road (km 0 + 407,16)• Construction of a road within a provincial road (km +)• Construction of a cycle path in a provincial road (km + 202,48)• Construction of a cycle path after a rail embankment (km 4 +)• Construction of a cycle road (km +)• Investment and information systems (2 items)• Information and promotion actions• Indirect costs. There will be a change in the organisation of traffic between these sections, which will make it easier for cyclists to move and take priority (also thanks to the installation of 2 traffic lights with traffic detectors at ul. B. Chrobre). As a result of the project, the output of the product will be achieved: length of road built for bicycles: 4.747 km. The project will be implemented in the framework of the Local Government Contract “Lider Pojeczierza”. The project is included in the list of priority projects. (English) / rank | |||
Revision as of 18:55, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of the road for the Bilinka Billinka bicycles to be completed — section Full — municipality border |
Project in Poland financed by DG Regio |
Statements
2,574,881.79 zloty
0 references
3,029,272.71 zloty
0 references
85.0 percent
0 references
8 October 2019
0 references
30 September 2020
0 references
GMINA PEŁCZYCE
0 references
Podejmowana interwencja nakierowana jest na działania usprawniające komunikację publiczną w Gminie Pełczyce, tj. zmniejszenia zatorów i wprowadzenie ułatwień w zakresie korzystania z transportu publicznego. Projekt dotyczy budowy drogi dla rowerów łączącej Gminę Barlinek z centrum miasta w Pełczycach stanowiącą alternatywną trasę dojazdu do Pełczyc dla transportu indywidualnego. W ramach inwestycji zostaną wybudowane również dwa miejsca postojowe – przy strefie inwestycyjnej oraz w centrum miasta. Długość planowanej ścieżki rowerowej wynosi 4,747 km. W ramach realizacji inwestycji konieczne jest wykonanie następujących zadań: • Opracowanie dokumentacji technicznej • Opracowanie studium wykonalności • Budowa drogi rowerowej w ciągu drogi powiatowej (km 0+137,40) • Budowa drogi w ciągu drogi wojewódzkiej (km 0+407,16) • Budowa drogi rowerowej po nasypie kolejowym (km 4+202,48) • Nadzór inwestorski • Tablice informacyjno-promocyjne (2 szt.) • Działania informacyjno-promocyjne • Koszty pośrednie. Pomiędzy tymi odcinkami zmianie ulegnie organizacja ruchu, której zadaniem będzie ułatwienie poruszania i pierwszeństwo dla rowerzystów (również dzięki instalacji 2 sygnalizacji świetlnych z detektorem ruchu przy ul. B. Chrobrego). W wyniku realizacji projektu osiągnięty zostanie wskaźnik produktu: długość wybudowanych dróg dla rowerów - 4,747km. Projekt będzie realizowany w ramach Kontraktu Samorządowego "Lider Pojezierza". Projekt znajduje się na liście projektów priorytetowych KS. (Polish)
0 references
Identifiers
RPZP.02.04.00-32-0002/19
0 references