Key to better education in primary schools in the town of Szamotuła (Q136622): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: budget (P474): 184,636.12799999997 euro) |
(Changed an Item: Fixing rounding issue) |
||||||||||||||
Property / budget | |||||||||||||||
184,636.13 Euro
| |||||||||||||||
Property / budget: 184,636.13 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 184,636.13 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.24 Euro
| |||||||||||||||
Property / budget: 184,636.13 Euro / qualifier | |||||||||||||||
point in time: 13 January 2020
|
Revision as of 04:18, 25 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Key to better education in primary schools in the town of Szamotuła |
Project in Poland financed by DG Regio |
Statements
653,919.62 zloty
0 references
769,317.2 zloty
0 references
85.0 percent
0 references
1 February 2019
0 references
31 August 2020
0 references
MIASTO I GMINA SZAMOTUŁY
0 references
Projekt będzie realizowany od lutego 2019 do sierpnia 2021 (31m-cy) w 2 szkołach z terenu Miasta Szamotuły: SP nr 1 w Szamotułach oraz SP nr 2 w Szamotułach w woj. wlkp Celem gł. jest poprawa warunków dydakt. SP 1 i SP 2 w Szamotułach, podniesienie kompet. klucz. niezbędnych na rynku pracy 540u. (283K;257M) w tym 200U. (107K;93M) o specj. potrzebach eduk. (340U. (200K;140M) z SP 1 w Szamotułach i 200U. (83K;117M) z SP 2 w Szamotułach) oraz podniesienie kompet. zawod. wśród 27 n-li (26K) w tym 15n-li pracujących w SP 1 w Szamotułach i 12 n-li z SP 2 w Szamotułach w okr. IX.19-VIII.21r. W pr. zaplanowano: -realizacje zaj. rozwijających zainteresowania dla 200ucz. z SP 1 i 140ucz. z SP 2 w Szamotułach w zakr. kompet. klucz. niezbędnych na rynku pracy w okresie IX.19-VI.21 (łącznie:2261h). - realizacje zaj. dla 200ucz. SP 1 i 90ucz. SP 2 w Szamotułach ze specjalnymi potrzebami eduk. w celu realizacji zaj. dydakt. -wyrów. (łącznie 1510h) oraz zajęć specjalist. (łącznie 1900h) w okresie IX.19 -VI.21r. Na potrzeby prawidł. realizacji zaj. w proj., udostępnione zostaną sale dydakt. wraz z zapleczem tech.-socjalnym na ter. obu szkół objętych pr. - doposażenie w 6 pracowni w SP 1 w Szamotułach (w tym 2 prac. przyrodniczych i 4 prac. matemat.) i 5 pracowni w SP 2 w Szamotułach (w tym 3 prac. przyrodnicze i 2 prac. matemat.) w sprzęt i pomoce dydakt. w celu stworzenia warunków do nauczania opartego na metodzie eksperym. w okresie II-VI.19r. - doskonalenie umiejętności i komp. zawodowych 15 n-li z SP 1 i 12 n-li z SP 2 w Szamotułach w zakr. rozwoju komp. klucz. u ucz., stosowania metod eksperymentu oraz prowadzenia procesu indywid. pracy z uczniem ze specjal. potrzebami eduk. Zaplanowane do realizacji zadania w pr. Benef. określił na podst. przeprowadzonych w grudniu 2017r. diagnoz szkół objętych wsparciem. Uwzględniono występujące problemy i potrzeby gr. doc. Wsparcie dostosowane będzie do indywid. potrzeb uczestn. z uwzględnieniem potrzeb os. z niepełnospr. (Polish)
0 references
The project will run from February 2019 to August 2021 (31 months) in 2 schools in the town of Szamotua: SP No 1 in Szamotuvalves and SP No 2 in Szamot in Wlkp. the objective is to improve the conditions of the dyke. SP 1 and SP 2 in Szamotułines, raising the skills needed in the labour market 540u. (283k; 257M) including 200U. (107k; 93M) with special needs. (340U. (200k; 140M) from SP 1 in Szamovines and 200U. (83k; 117k; m) from SP 2 in Szamotułines) and an increase in skin. of 27 n-li (26K) including 15nth SP 1 in Szamotuły and 12 n-li SP 2 in Szamotułan in okr. IX.19-VIII.21. The draft is scheduled to take place in the following stages: — outputs of the developing expressions of interest for the 200s with SP 1 and 140. with SP 2 in Szamotuary in set up the skills needed in the labour market during the period IX.19-VI.21 (total: 2261H). Achieve the 200th e. SP 1 and 90cz. SP 2 in Szamotuvalves with special needs in order to carry out the provision. − − − − − − − − − − − − − − − (total 1510h) and specialised activities. (total 1900h) during the period IX.19 to VI.21. For the purposes of the action he will be able to fill in the order and will be able to use the smoke rooms, together with the technical facilities of the two schools that are part of pr. Providing 6 staff for SP 1 in Szamotuach (including 2 natural and 4 workers) and 5 staff from SP 2 in Szamotuach (including 3 natural and 2 workers) in equipment and aids, in order to create the conditions for teaching based on the method of experiment in the period II-VI.19. — skills and professional skills of 15 n-SP 1 n-SP and 12 n-SP 2 in Szamotuvalves in the development of a key player in the development, use of experimental methods and performance of the turkey process with a student with special needs. Planned to carry out the task in pr. In December 2017, Benef. has been identified by Benef. in the diagnosis of the schools supported. The needs of the disabled are taken into account and the needs of the disabled are taken into account, taking into account the needs of disabled people. (English)
0 references
Identifiers
RPWP.08.01.02-30-0045/17
0 references