Adaptation of the premises of the ground floor of the Primary School for the purposes of the pre-school branch, together with the construction of the car park and the refurbishment of the playground (Q117346): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The project is a response to the insufficient pre-school infrastructure in the Municipality of Shchuchuch’ye, and to the low level of pre-school education for children of 3-4 years. The aim of this project is to adapt parts of the centre of the Primary School at Shchuch’ye for the purposes of setting up nursery schools for the youngest groups (3-4 years old) and retrofitting the existing playground and paving the ground for the square. The imp...) |
||
Property / summary | |||
Property / summary: The project is a response to the insufficient pre-school infrastructure in the Municipality of Shchuchuch’ye, and to the low level of pre-school education for children of 3-4 years. The aim of this project is to adapt parts of the centre of the Primary School at Shchuch’ye for the purposes of setting up nursery schools for the youngest groups (3-4 years old) and retrofitting the existing playground and paving the ground for the square. The implementation of the project will contribute to the increase in the number of children enrolled in pre-school education within the territory of the Municipality of Szczuczyn. Ultimately, the project will create 4 nursery units that can host 75 children between 3 and 4 years old. A detailed diagnosis of the needs and deficits in the intervention area is set out in the Annex of the Feasibility Study. In particular, the work will focus on: • adaptations of the layout of the ground floor space (modification of partition walls); • the renovation of the floor, walls and ceilings; • the replacement of internal doors; • the replacement of items of equipment; • the new working arrangement and the cloakroom; • changes in the existing water and sewage systems and electrical installations; • construction of a staircase; • the replacement of parts of windows; • the construction of a surfaced area; • playground equipment. The site is tailored to the needs of people with disabilities. Audience: children of pre-school age from the town of Shchuch’ye, parents and guardians of children, teachers employed in the newly established pre-school wards. The submission of the project is complementary to the actions included in the project submitted by the Applicant under Action 3.1.1 Ensure equal access to high quality pre-school education (expected date of the competition — August 2018). Further information about the project’s complementarity with the project under Action 3.1.1 can be found in the Annex of the Feasibility Study. The tasks are planned to be carried out in the 3 rd quarter of the year 2 018 rd quarter of the year 2019. (English) / rank | |||
Revision as of 16:38, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Adaptation of the premises of the ground floor of the Primary School for the purposes of the pre-school branch, together with the construction of the car park and the refurbishment of the playground |
Project in Poland financed by DG Regio |
Statements
660,333.45 zloty
0 references
776,862.91 zloty
0 references
85.0 percent
0 references
17 September 2018
0 references
22 March 2019
0 references
GMINA SZCZUCZYN
0 references
Projekt jest odpowiedzią na niewystarczającą infrastrukturę przedszkolną w Gminie Szczuczyn oraz niski stopień edukacji przedszkolnej wśród dzieci 3- 4 letnich. W ramach przedmiotowego projektu zaplanowano prace adaptacyjne części obiektu Szkoły Podstawowej w Szczuczynie na potrzeby powstania oddziałów przedszkola przeznaczonych dla najmłodszych grup (3- 4 latków) oraz doposażenie istniejącego placu zabaw i zagospodarowanie terenu w postaci utwardzenia placu. Realizacja projektu przyczyni się do wzrostu liczby dzieci objętych wychowaniem przedszkolnym na terenie gminy Szczuczyn. Docelowo, w ramach projektu mają powstać 4 oddziały przedszkola, które będą mogły przyjąć 75 dzieci w wieku 3- 4 lata. Szczegółowa diagnoza potrzeb i deficytów w obszarze interwencji została przedstawiona w załączniku wniosku Studium wykonalności. W szczególności prace będą dotyczyć: • dostosowania układu pomieszczeń parteru (przebudowa ścian działowych); • remontu posadzek, ścian i sufitów; • wymiany drzwi wewnętrznych; • wymiany elementów wyposażenia; • nowej aranżacji sali zajęć oraz szatni; • zmian w istniejącej instalacji wodno-kanalizacyjnej oraz instalacji elektrycznej; • budowy schodów zew; • wymiany części okien; • budowy placu utwardzonego; • wyposażenia placu zabaw. Obiekt jest dostosowany do potrzeb osób z niepełnosprawnościami. Grupa docelowa: dzieci w wieku przedszkolnym z terenu gminy Szczuczyn, rodzice i opiekunowie dzieci, nauczyciele zatrudnieni w nowopowstałych oddziałach przedszkolnych. Złożenia projektu są komplementarne wobec działań ujętych w projekcie złożonym przez Wnioskodawcę w ramach działania 3.1.1 Zapewnienie równego dostępu do wysokiej jakości edukacji przedszkolnej (przewidywany termin rozstrzygnięcia konkursu- sierpień 2018). Więcej informacji na temat komplementarności projektu z projektem w ramach działania 3.1.1 znajduje się w załączniku Studium wykonalności. Realizację zadań zaplanowano na III kw. 2018- I kw. 2019 roku. (Polish)