Reduction of low emissions in the municipal and of the Szczawnica municipal area — solid fuels (Q112468): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The purpose of this project is to replace old c.a. and hot service water sources for new boilers with specific parameters, including subsidies on the need to prepare specific installations. The applicant assumes that 199 heat supplied heating equipment will be upgraded. The main cost categories of this project will be: costs related to the replacement of 199 heat sources; carry out measures to raise public awareness of energy efficiency and re...) |
||
Property / summary | |||
Property / summary: The purpose of this project is to replace old c.a. and hot service water sources for new boilers with specific parameters, including subsidies on the need to prepare specific installations. The applicant assumes that 199 heat supplied heating equipment will be upgraded. The main cost categories of this project will be: costs related to the replacement of 199 heat sources; carry out measures to raise public awareness of energy efficiency and reduce low emissions. The main recipients of this project will be the residents of the Municipality of Shchuvarica, as well as tourists and probation residents. Due to the scale of the project, the project will be implemented in several steps: 1. The application procedure with the signing of the part-financing agreement.2. Project organisation Within this part, rules will be prepared for participation in a project setting out the criteria, the need to participate in an energy assessment, a selection procedure for a project, the documents necessary for joining the project and other conditions for participation. In addition, this phase includes the running of the campaign, in which the applicant will report the possibility of obtaining funding under this project. The selection process, the verification of the criteria and the energy assessment of the buildings will also be carried out in the organisational phase. The organisation phase shall also include activities consisting of the execution of works, i.e. replacement of boilers, installations, etc., together with their documentation and acceptance activities in the work. Monitoring visits will also be carried out in this phase which will verify whether the recipients are using the equipment to be subsidised in compliance with the funding requirements. 1. preparation of financial and economic analysis of the project2. replacement of heat sources with installation 3. raising environmental awareness among the local community (4. lump sum costs of promotion and management) (English) / rank | |||
Revision as of 12:11, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reduction of low emissions in the municipal and of the Szczawnica municipal area — solid fuels |
Project in Poland financed by DG Regio |
Statements
1,789,855.56 zloty
0 references
1,817,165.14 zloty
0 references
98.5 percent
0 references
1 February 2017
0 references
31 December 2019
0 references
MIASTO I GMINA SZCZAWNICA
0 references
Niniejszy projekt ma na celu działania polegające na wymianie starych źródeł c.o. i c.w.u. na nowe kotły o określonych parametrach wraz z dofinansowaniem prac związanych z koniecznością przygotowania określonych instalacji. Wnioskodawca zakłada, że modernizacji poddanych zostanie 199 urządzeń grzewczych będących źródłem ciepła. Główne kategorie kosztów niniejszego projektu stanowić będą: koszty związane z wymianą 199 szt. źródeł ciepła; przeprowadzenie działań podnoszących świadomość ekologiczną społeczeństwa w zakresie poprawy efektywności energetycznej oraz obniżenia niskiej emisji. Głównymi odbiorcami niniejszego projektu będą mieszkańcy gminy Szczawnica a także turyści oraz kuracjusze przebywający na jej terenie. Ze względu na skalę przedsięwzięcia, projekt będzie realizowany w kilku etapach:1. Procedura aplikowania o środki wraz z podpisaniem umowy o dofinansowanie.2. Organizacja projektu. W ramach tej części przygotowany zostanie regulamin udziału w projekcie określający kryteria, konieczność uczestnictwa w ocenie energetycznej, procedury naboru do projektu, dokumenty niezbędne do przystąpienia do projektu i inne warunki uczestnictwa. Ponadto faza ta obejmuje prowadzenie kampanii, w której Wnioskodawca poinformuje o możliwości uzyskania dofinansowania w ramach niniejszego projektu. W fazie organizacyjnej prowadzony będzie również nabór zgłoszeń, weryfikacja kryteriów oraz ocena energetyczna budynków. Faza organizacji obejmuje również działania polegające na wykonaniu prac tj. wymiana kotłów, instalacji itp. wraz z ich udokumentowaniem i działaniami dot. odbiorów ww prac. W fazie tej będą prowadzone również wizyty monitorujące, które będą weryfikować czy odbiorcy użytkują dofinansowane urządzenia zgodnie z wymogami dofinansowania.Zadania: 1. opracowanie analizy finansowej i ekonomicznej projektu2. wymiana źródeł ciepła wraz z instalacjami3. podnoszenie świadomości ekologicznej wśród społeczności lokalnej4. koszty ryczałtowe promocja i zarządzanie (Polish)
0 references
Identifiers
RPMP.04.04.03-12-0238/17
0 references