The extension of the drinking water supply to the municipality of Doubravčice (Q61343): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The project addresses the extension of the existing water infrastructure of Doubravčice. The construction includes the construction of a new water storage tank and the water treatment plant (reflected) and the relevant engineering material, a new tube, a new approach to the object including a running gear, a fence, a drain of 3 Ks and a connection to the treatment site, and then to the individual wells. The water will be transported to the sto...) |
||
Property / summary | |||
Property / summary: The project addresses the extension of the existing water infrastructure of Doubravčice. The construction includes the construction of a new water storage tank and the water treatment plant (reflected) and the relevant engineering material, a new tube, a new approach to the object including a running gear, a fence, a drain of 3 Ks and a connection to the treatment site, and then to the individual wells. The water will be transported to the storage tank by pumping from new wells with a total number of 3 pieces. (English) / rank | |||
Revision as of 12:08, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | The extension of the drinking water supply to the municipality of Doubravčice |
Project in Czech Republic financed by DG Regio |
Statements
7,522,366.12 Czech koruna
0 references
11,799,790.0 Czech koruna
0 references
63.75 percent
0 references
30 June 2020
0 references
Obec Doubravčice
0 references
28201
0 references
Projekt řeší rozšíření stávající vodárenské infrastruktury obce Doubravčice. Stavba zahrnuje výstavbu nové akumulační nádrže vody s úpravnou vody (odradonování) a příslušné technologické vystrojení, nové trubní propoje, novou příjezdovou komunikaci k objektu včetně sjezdu, oplocení, vystrojení 3 ks. vrtů a přípojku NN k objektu úpravny a následně k jednotlivým vrtům. Voda bude do prostoru akumulační nádrže dopravována čerpáním z nových vrtů v celkovém počtu 3 ks. (Czech)
0 references
Identifiers
CZ.05.1.30/0.0/0.0/17_073/0007200
0 references