Reducing the energy intensity of beer production (Q15675): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: budget (P474): 328,158.16000000003 euro)
(‎Changed an Item: Fixing rounding issue)
Property / budget
 
328,158.16 Euro
Amount328,158.16 Euro
UnitEuro
Property / budget: 328,158.16 Euro / rank
 
Preferred rank
Property / budget: 328,158.16 Euro / qualifier
 
exchange rate to Euro: 0.04 Euro
Amount0.04 Euro
UnitEuro
Property / budget: 328,158.16 Euro / qualifier
 
point in time: 10 January 2020
Timestamp+2020-01-10T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:58, 24 September 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reducing the energy intensity of beer production
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    3,281,581.6 Czech koruna
    0 references
    131,263.26 Euro
    10 January 2020
    0 references
    8,203,954.0 Czech koruna
    0 references
    328,158.16 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    6 June 2017
    0 references
    27 August 2018
    0 references
    Měšťanský pivovar Havlíčkův Brod a.s.
    0 references

    49°36'29.34"N, 15°34'9.91"E
    0 references
    58001
    0 references
    Komplexní modernizace a rekonstrukce technologií souvisejících s výrobou, rozvodem a spotřebou energie při výrobě piva ( výroba a rozvod páry a teplé vody, rekuperace tepla, vzduchotechnika, výroba chladu ) včetně stavebních opatření na snižování energetické náročnosti budov ( zateplení, výměna oken) a modernizace systémů měření a regulace. Záměr se týká 80% areálu společnosti (je ve vlastnictví žadatele). a. (Czech)
    0 references
    Comprehensive modernisation and reconstruction of technology related to energy production, distribution and consumption of energy in beer production (production and distribution of steam and hot water, heat recovery, ventilation, cold production) including building measures to reduce the energy performance of buildings (insulation, replacement of windows) and the modernisation of measurement and control systems. The project concerns 80 % of the company’s site (it is owned by the applicant). (English)
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/15_010/0002917
    0 references