Certainkov — tůběrý construction (Q71788): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The construction of the runaways from the main drainage facility in the unbuilt territory of the Municipality of Červenkov on permanent grassland and infertile land., remove_old_english_translation) |
||
Property / summary | |||
Property / summary: The construction of the runaways from the main drainage facility in the unbuilt territory of the Municipality of Červenkov on permanent grassland and infertile land. (English) / rank | |||
Revision as of 20:47, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Certainkov — tůběrý construction |
Project in Czech Republic financed by DG Regio |
Statements
472,452.7 Czech koruna
0 references
472,452.7 Czech koruna
0 references
100 percent
0 references
31 August 2020
0 references
xxx
0 references
34506
0 references
Výstavba průtočné tůně napouštěné z hlavního odvodňovacího zařízení v nezastavěném území obce Černíkov na trvalém travním porostu a neplodné půdě. (Czech)
0 references
Identifiers
CZ.05.4.27/0.0/0.0/19_131/0010208
0 references