Construction of a PV farm with a total capacity of 0.5 MW — ZW Pilchowo (Q137713): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The project will consist of the following tasks: 1) Construction of a photovoltaic farm under the term ‘design and demolition’, (2) Building supervision, (3) Information and promotion activities. Task 1 it will consist of the design, construction, delivery, assembly and connection to the national electricity system of a power plant with a total capacity of 0.5 MW, together with the commissioning and obtaining the required formal and legal docu...) |
||
Property / summary | |||
Property / summary: The project will consist of the following tasks: 1) Construction of a photovoltaic farm under the term ‘design and demolition’, (2) Building supervision, (3) Information and promotion activities. Task 1 it will consist of the design, construction, delivery, assembly and connection to the national electricity system of a power plant with a total capacity of 0.5 MW, together with the commissioning and obtaining the required formal and legal document necessary for the operation and operation of the farm. The farm will be located in the Pomorskie Province, the Municipality of Szczecin, in ul. Szczecin. Water supply 5, reference number 1/4 within the 2002th area of ZW Pilchowo, owned by ZWiK Sp. z o.o. in Szczecin. The contractor will be responsible for: a) Developing the design document and obtaining the decision making the decision to implement the investment on behalf of the contracting authority; (b) Development of implementing projects; (c) Realisation of copyright; site preparation; (e) construction and assembly works including installation of solar panels on the wheelhouse, with the supply of the necessary materials and equipment and software, installation and configuration licences; (f) Supply of local weather stations in the specifications necessary to determine the actual yield of the farm; the connection to the integrated system for the visualisation of water management equipment ZWiK Szczecin operating in the control area of the ZW Pomorzany, and the management and monitoring of the electricity system; (h) the execution of any testing and start-up of a photovoltaic installation; (I) Development of the post as-built doc with complete specification of the source codes of the application programming for the visualisation and control — SCADA in such a way that the Contracting Authority may modify; obtain a final authorisation for the use (in the event of a Building Licence) and of any other permit necessary for the use of the facilities provided; (c) Release for use. Task 2 construction supervision, zd. 3 information and publicity measures (as described in paragraph.D.4) (English) / rank | |||
Revision as of 19:19, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a PV farm with a total capacity of 0.5 MW — ZW Pilchowo |
Project in Poland financed by DG Regio |
Statements
1,578,830.4 zloty
0 references
1,857,447.54 zloty
0 references
85.0 percent
0 references
24 October 2016
0 references
31 October 2018
0 references
ZAKŁAD WODOCIĄGÓW I KANALIZACJI SP. Z O.O.
0 references
Na projekt składać się będą zadania: 1)Budowa farmy fotowoltaicznej w formule "zaprojektuj i wybuduj", 2)Nadzór nad budową, 3)Działania informacyjno-promocyjne. Zad. 1 polegać będzie na zaprojektowaniu, budowie, dostawie, montażu oraz przyłączeniu do krajowego systemu elektroenergetycznego farmy fotowoltaicznej o łącznej mocy 0,5 MW, wraz z uruchomieniem i uzyskaniem wymaganej dok. formalno-prawnej,niezbędnej do uruchomienia i eksploatacji farmy. Farma, zlokalizowana będzie w woj. zachodniopomorskim, gminie Szczecin, w m. Szczecin ul. Wodociągowa 5, nr dz. 1/4 w obrębie 2002 na terenie ZPW Pilchowo będącym własnością ZWiK Sp. z o.o. w Szczecinie. Do zadań wykonawcy należeć będzie: a) Opracowanie dok. projektowej i uzyskanie w imieniu Zamawiającego decyzji umożliwiającej realizacje inwestycji; b) Opracowanie projektów wykonawczych; c) Pełnienie nadzoru autorskiego; d) Przygotowanie terenu; e) Wykonanie robót budowlano-montażowych w tym montaż paneli fotowoltaicznych na stelażu wraz z dostawą niezbędnych materiałów i urządzeń oraz licencji oprogramowania, instalacji i konfiguracji; f) Dostawa lokalnej stacji pogodowej w specyfikacji niezbędnej do określania rzeczywistej produktywności farmy; g) przyłączenie do zintegrowanego systemem wizualizacji urządzeń gospodarki wodnej ZWiK Szczecin, pracującym na terenie Dyspozytorni ZPW Pomorzany oraz zarządzania i monitorowania systemu elektroenergetycznego; h) Wykonanie wszelkich prób i rozruchu instalacji fotowoltaicznej; i) Opracowanie dok. powykonawczej wraz z kompletną dok.opisującą kody źródłowe programowania aplikacji użytkowej do wizualizacji i sterowania – SCADA w sposób umożliwiający modyfikacje przez Zamawiającego; j) Uzyskanie prawomocnego pozwolenia na użytkowanie (w przypadku uzyskania Pozwolenia na Budowę) i pozostałych pozwoleń koniecznych do użytkowania zrealizowanych obiektów; k)Oddanie do użytkowania. Zad. 2 nadzór nad budową, zad. 3 działania informacyjno-promocyjne (opisane w pkt.D.4 (Polish)
0 references
Identifiers
RPZP.02.10.00-32-A108/16
0 references