Replacing the coal-fired boiler by a 139.9 kW heat pump team. (Q137672): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: EU contribution (P835): 135,725.376 euro) |
(Changed an Item: Fixing rounding issue) |
||||||||||||||
Property / EU contribution | |||||||||||||||
135,725.38 Euro
| |||||||||||||||
Property / EU contribution: 135,725.38 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 135,725.38 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.24 Euro
| |||||||||||||||
Property / EU contribution: 135,725.38 Euro / qualifier | |||||||||||||||
point in time: 13 January 2020
|
Revision as of 14:52, 24 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Replacing the coal-fired boiler by a 139.9 kW heat pump team. |
Project in Poland financed by DG Regio |
Statements
565,522.4 zloty
0 references
706,903.0 zloty
0 references
80.0 percent
0 references
2 November 2018
0 references
31 March 2019
0 references
PRZEDSIĘBIORSTWO ROLNE "WEROL" SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Przedsięwzięcie obejmuje zastąpienie istniejącej kotłowni węglowej o mocy 160 kW przez trzy zespoły pomp ciepła na potrzeby centralnego ogrzewania i przygotowania ciepłej wody użytkowej w budynkach przedsiębiorstwa rolnego WEROL sp. z o.o. Obiekt zlokalizowany jest na terenie miejscowości Chwiram 26, 78-600 Wałcz. Projekt obejmuje technologię dolnego źródła ciepła. Obecnie obiekty przedsiębiorstwa ogrzewane są dzięki konwencjonalnym źródłom energii,środowiskowe oraz wysokie koszty paliwa odbiły się na wnioskodawcy wdrożenie odnawialnych źródeł energii. Dla zapewnienia pozyskiwania energii z gruntu za-projektowano 32 odwierty (kolektory pionowe) o głębokości 100mb każdy. Głębokość projektowanych otworów wynika z budowy geologicznej rejonu usytuowania odwiertów. Energia cieplna pozyskiwana będzie z gruntu przez pionowe wymienniki. W celu ograniczenia liczby przewodów transportujących czynnik grzewczy do budynku zaprojektowano 2 studnie zbiorcze dolnego źródła ciepła. W związku z powyższym energia doprowadzana do budynku transportowana będzie jednym przewodem zbiorczym zasilającym oraz jednym przewodem zbiorczym powrotnym (Polish)
0 references
The project involves the replacement of the existing coal-fired boiler with a power of 160 kW by three units of heat pumps for central heating and the preparation of hot water in the buildings of the WEROL sp. z o.o., located in Chwilram 26, 78-600 Walcz. The project includes lower heat source technology. Currently, plants are heated by conventional energy sources, environmental technologies and high fuel costs have affected the applicants’ deployment of renewable energy sources. To ensure energy from the ground, 32 wells (vertical collectors) of 100mb depth were projected. The depth of the projected holes is due to the geological structure of the wells. The heat from the ground will be taken from the ground by the vertical plane. To limit the number of cables transporting the heating factor to the building, 2 units of a lower heat generator are designed for the building. In the light of the above, the energy supplied to the building will be accompanied by a single supply line and a single line for return. (English)
0 references
Identifiers
RPZP.02.09.00-32-A001/17
0 references