Construction of the storm water drainage system in Barna (Q137839): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The object of the project is the construction of a storm-water sewerage system in Barna on parcels at numerze:obręb 2 Barlinek, parcels Nos 674, 688/7, 651/9, 660/12 (breakdown of plot 660/1), 695/1 and strip 1 of Barlinek, parcels 458,562, 564, 584, 586, 592/3, 592/14, 705,707/1, 709, 710/1, 566.Investment. Flukowski and ul. The herb of 828 b.The investment is part of a major project (previously implemented with the POŚ) of the water and wast...) |
||
Property / summary | |||
Property / summary: The object of the project is the construction of a storm-water sewerage system in Barna on parcels at numerze:obręb 2 Barlinek, parcels Nos 674, 688/7, 651/9, 660/12 (breakdown of plot 660/1), 695/1 and strip 1 of Barlinek, parcels 458,562, 564, 584, 586, 592/3, 592/14, 705,707/1, 709, 710/1, 566.Investment. Flukowski and ul. The herb of 828 b.The investment is part of a major project (previously implemented with the POŚ) of the water and wastewater management project by the PWK ‘PPłonia’ as defined in that project as task No 2.4.1 (Construction of a storm-water sewage system at ul. Flukowski) and 2.5 (Construction of separators for the rainwater collectors in the ul. Gardening, reconstruction and renovation of the rainwater reservoir, reconstruction of the storm-water sewage system at ul. Green in Barna, only in the section on ul. Green). these elements have not been realised because of the lack of formal capacity to obtain the funding from the OPEX subsidy. the investment is “prescribed” to the municipality of Barlinek in order to complete the range of investments presented in this application. (English) / rank | |||
Revision as of 19:30, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of the storm water drainage system in Barna |
Project in Poland financed by DG Regio |
Statements
2,845,747.37 zloty
0 references
3,347,938.11 zloty
0 references
85.0 percent
0 references
11 March 2016
0 references
30 July 2018
0 references
GMINA BARLINEK
0 references
Przedmiotem projektu jest budowa kanalizacji deszczowej w Barlinku na działkach o numerze:obręb 2 Barlinek, działki nr 674, 688/7, 651/9, 660/12 (z podziału działki 660/1), 695/1 oraz obręb 1 Barlinek, działki nr 458,562, 564, 584, 586, 592/3, 592/14, 705,707/1, 709, 710/1, 566.Inwestycja obejmuje swoim zakresem ul. Flukowskiego oraz ul. Zielną na odcinku 828 mb.Inwestycja jest częścią dużego (wcześniej zrealizowanego z POiŚ)projektu w zakresie gospodarki wodno-ściekowej przez PWK "Płonia" określonego w tym projekcie jako zadania nr 2.4.1 (Budowa kanalizacji deszczowej w ul. Flukowskiego) oraz 2.5 (Budowa separatorów na kolektorach deszczowych w ul. Ogrodowej, przebudowa i remont zbiornika retencyjnego wód deszczowych, przebudowa kanalizacji deszczowej w ul. Zielnej w Barlinku, tylko w części dotyczącej ul. Zielnej).Elementy te nie zostały zrealizowane z uwagi na brak formalnych możliwości pozyskania na dane zadania dofinansowania z POiŚ.Obecnie inwestycja jest "przepisywana" na Gminę Barlinek aby móc dokończyć zakres inwestycji przedstawiony w niniejszym wniosku. (Polish)
0 references
Identifiers
RPZP.03.03.00-32-A005/16
0 references