Reconstruction, adaptation and equipping of a municipal building in Mokoly for pre-school education and training (Q137087): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The project entitled: “Rebuilding, adapting and equipping the municipal building to be fit for the pre-school education and training) will be carried out in the area of Mukolna in the municipality of Sompono, in pow. of horsemeat, in Kilkp.Following the development of a 3-branch pre-school building for 32 children, a two-storey building (ground floor with the use of ‘podpiwek’). After the refurbishment, the building will meet the standards and...)
Property / summary
The project entitled: “Rebuilding, adapting and equipping the municipal building to be fit for the pre-school education and training) will be carried out in the area of Mukolna in the municipality of Sompono, in pow. of horsemeat, in Kilkp.Following the development of a 3-branch pre-school building for 32 children, a two-storey building (ground floor with the use of ‘podpiwek’). After the refurbishment, the building will meet the standards and requirements for pre-school facilities and in harmony with the surrounding park. The project involves the management of the site around the nursery school, including the parking area for employees and parents with access roads and lawns (cost of the ineligible costs). Following the adaptation of the municipal building: 1. Ground floor: a 23.4 m² playing field/playground; 23.6 m² and 26.2 m² -3 sanitary nodes (bathrooms) with a total exchange of 13.8 m² -dishwashers — 4.1 m² -room chapter for meals (catering kitchens) -4.5 m² -cloakroom with a corridor of 17.3 m² -cage staircase — 13.8 m² -corridor -2.5 m² -corridor -8.7 m² -corridor -2 m² -corridor -16.5 m² -v-4.5 m² — unit 7.2 m² — box 7.4 m² — other corridor — 73.3 m² — others: less than 20.9 m² 3. In the cellar: -3 pumping capacity 13.2 m², 11.3 m² and 32.7 m², in a corridor of -27.4 m². The project provides for the provision of a nursery school: 3 lockers of 9 lockers, 1 cupboards with 6 lockers, 6 hexagon chairs, 32 chairs, 1cupboards with cot, 24 cot, 1desk (with 2 cabinets + 2 drawers), 1cupboards with shelves, 6 rack plates, 1shirts. (cost not eligible), with a white panel (cost of non-eligible origin), 24 dead bags (cost not eligible), 3 D6 f and D5,1 fire extinguishers (ineligible costs.) and 1 items kuchni:tablice correlative and white extinguishers, fire extinguishers, sleeping bags. Key product indicators (2018): Number of facilities supported infrastructure (1) Capacity supported by the provision of childcare or education to 32 persons. (English)
 
Property / summary: The project entitled: “Rebuilding, adapting and equipping the municipal building to be fit for the pre-school education and training) will be carried out in the area of Mukolna in the municipality of Sompono, in pow. of horsemeat, in Kilkp.Following the development of a 3-branch pre-school building for 32 children, a two-storey building (ground floor with the use of ‘podpiwek’). After the refurbishment, the building will meet the standards and requirements for pre-school facilities and in harmony with the surrounding park. The project involves the management of the site around the nursery school, including the parking area for employees and parents with access roads and lawns (cost of the ineligible costs). Following the adaptation of the municipal building: 1. Ground floor: a 23.4 m² playing field/playground; 23.6 m² and 26.2 m² -3 sanitary nodes (bathrooms) with a total exchange of 13.8 m² -dishwashers — 4.1 m² -room chapter for meals (catering kitchens) -4.5 m² -cloakroom with a corridor of 17.3 m² -cage staircase — 13.8 m² -corridor -2.5 m² -corridor -8.7 m² -corridor -2 m² -corridor -16.5 m² -v-4.5 m² — unit 7.2 m² — box 7.4 m² — other corridor — 73.3 m² — others: less than 20.9 m² 3. In the cellar: -3 pumping capacity 13.2 m², 11.3 m² and 32.7 m², in a corridor of -27.4 m². The project provides for the provision of a nursery school: 3 lockers of 9 lockers, 1 cupboards with 6 lockers, 6 hexagon chairs, 32 chairs, 1cupboards with cot, 24 cot, 1desk (with 2 cabinets + 2 drawers), 1cupboards with shelves, 6 rack plates, 1shirts. (cost not eligible), with a white panel (cost of non-eligible origin), 24 dead bags (cost not eligible), 3 D6 f and D5,1 fire extinguishers (ineligible costs.) and 1 items kuchni:tablice correlative and white extinguishers, fire extinguishers, sleeping bags. Key product indicators (2018): Number of facilities supported infrastructure (1) Capacity supported by the provision of childcare or education to 32 persons. (English) / rank
Normal rank
 

Revision as of 19:45, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reconstruction, adaptation and equipping of a municipal building in Mokoly for pre-school education and training
Project in Poland financed by DG Regio

    Statements

    0 references
    861,796.95 zloty
    0 references
    206,831.27 Euro
    13 January 2020
    0 references
    1,013,878.79 zloty
    0 references
    243,330.91 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    30 December 2015
    0 references
    30 August 2018
    0 references
    GMINA SOMPOLNO
    0 references
    Projekt pn. „Przebudowa, adaptacja i wyposażenie budynku komunalnego w Mąkolnie na cele przedszkolno-edukacyjne" zrealizowany zostanie na terenie Mąkolna w gminie Sompolno, w pow. konińskim, w woj. wlkp.Po przebudowie powstanie trójoddziałowe przedszkole dla 32 dzieci, budynek dwukondygnacyjny (parter z poddaszem użytkowym z podpiwniczeniem). Budynek po przebudowie spełniać będzie standardy i wymogi niezbędne dla obiektów przedszkolnych i harmonijnie nawiązywać będzie do otaczającego go parku (zabytkowy zespół dworski). Projekt obejmuje zagospodarowanie terenu wokół przedszkola, w tym parking dla pracowników i rodziców z drogą dojazdową i trawnik (koszt niekwalif.). Po adaptacji budynku komunalnego powstaną: 1. Na parterze:-trzy sale zajęć/zabaw o wymiarach 23,4 m2; 23,6m2 i 26,2m2 -3 oddziały węzłów sanitarnych (łazienki) o łącznych wymiarach13,8m2 -zmywalnia-4,1m2-pomieszczenie rozdziału posiłków(kuchnia cateringowa)-4,5m2 -szatnia z korytarzem-17,3m2-klatka schodowa-13,8m2-przedsionek-2,5m2 -korytarz-8,7m2 2.Na poddaszu:-klatka schodowa-16,5m2 -pomieszczenie socjalne-7,2m2 -wc-4,5m2 -pom. porządkowe-7,4m2 - gabinet dyrektora-8,0m2 - korytarz-73,3m2 - pozostałe: poddasze nieużytkowe-20,9m2 3. W piwnicy:-3 pom. techn. o wym. 13,2m2, 11.3m2 i 32,7m2, korytarz-27,4m2. Projekt przewiduje doposażenie przedszkola: 3 szafki z 9 skrytkami,1 szafka z 6 skrytkami,6 stołów sześciokątnych,32 krzesła,1szafka na łóżeczka,24 łóżeczka,1biurko(z 2 szafkami+2 szufladami),1szafa z półkami,6szt. tablic korkowych, 1szt. (koszt niekwalif.), szkolnej tablicy białej (koszt niekwalif.), 24szt. śpiworków z poduszkami (koszt niekwalif.), po 3szt. regałów szatniowych D6 i D5,1szt. gaśnicy (koszt niekwalif.) i 1szt. wyposażenie kuchni:tablice korkowe i białe, gaśnice,śpiworek z poduszką. Wskaźniki produktu kluczowe (2018r.): -Liczba wspartych obiektów infrastruktury przedszkolnej-1 szt. -Potencjał objętej wsparciem infrastr. w zakresie opieki nad dziećmi lub infrastr. edukacyjnej-32 osoby. (Polish)
    0 references

    Identifiers

    RPWP.09.03.01-30-0003/17
    0 references