Energy efficiency increase WTW Poland Sp. z o.o. in Bartoszyce through a comprehensive thermal modernisation of the company’s building (Q132135): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The project aims at improving the energy efficiency of WTW Poland Sp. z o.o through a comprehensive thermal modernisation with the replacement of the heat source. The project will be carried out at the premises of the company at ul. Konopicka 2F in Bartoszyce number of 75/29 r. 280101_1.0008 Bartoszyce. The start of the preparatory work of the project 18.04.2018. the Ombudsman launched the project 02.04.2019. the project will be completed in 3...)
Property / summary
The project aims at improving the energy efficiency of WTW Poland Sp. z o.o through a comprehensive thermal modernisation with the replacement of the heat source. The project will be carried out at the premises of the company at ul. Konopicka 2F in Bartoszyce number of 75/29 r. 280101_1.0008 Bartoszyce. The start of the preparatory work of the project 18.04.2018. the Ombudsman launched the project 02.04.2019. the project will be completed in 31.12.2019. STAGE 1: preparatory works: ex-ante energy audits, technical documentation, ornithological expertise and chitosan, feasibility studies. STAGE 2: construction works: — thermal modernisation of WTW Poland’s production hall with a useful floor area of 2 319.5 m²: the exchange of 1 007 m² of the outdoor wall of the arena, the warming of 597 m² of the external wall, the warming of 2 033.22 m² wall, the warming of 1 497.35 m² floor on the ground, the replacement of 1 011.6 m² of windows, the replacement of 57.5 m² of gates (non-eligible). — the replacement of a source of heat towards more energy efficient and modernisation of central heating and domestic hot water installations (Assembly: 14 units of heaters with 16-18 kW/head, 2 gas boilers, weather automation (1 kpl), heat meters for home and service water meters, gas meter, ca. 550 m orurination, insulation for the use of valves of 14 units, 2 regulatory units and 14 units) of ETAP 3: ex-post Energy Audit. The planned activities within the framework of the project follow the assumptions set out in the ROP WiM for Priority Axis 4 — Energy efficiency, Thematic Objective 4 — Supporting the shift towards a low-carbon economy in all sectors through a 73.72 % energy efficiency improvement project, a 77.42 % reduction in annual heating energy consumption and a 79.38 % reduction in greenhouse gas emissions. (English)
 
Property / summary: The project aims at improving the energy efficiency of WTW Poland Sp. z o.o through a comprehensive thermal modernisation with the replacement of the heat source. The project will be carried out at the premises of the company at ul. Konopicka 2F in Bartoszyce number of 75/29 r. 280101_1.0008 Bartoszyce. The start of the preparatory work of the project 18.04.2018. the Ombudsman launched the project 02.04.2019. the project will be completed in 31.12.2019. STAGE 1: preparatory works: ex-ante energy audits, technical documentation, ornithological expertise and chitosan, feasibility studies. STAGE 2: construction works: — thermal modernisation of WTW Poland’s production hall with a useful floor area of 2 319.5 m²: the exchange of 1 007 m² of the outdoor wall of the arena, the warming of 597 m² of the external wall, the warming of 2 033.22 m² wall, the warming of 1 497.35 m² floor on the ground, the replacement of 1 011.6 m² of windows, the replacement of 57.5 m² of gates (non-eligible). — the replacement of a source of heat towards more energy efficient and modernisation of central heating and domestic hot water installations (Assembly: 14 units of heaters with 16-18 kW/head, 2 gas boilers, weather automation (1 kpl), heat meters for home and service water meters, gas meter, ca. 550 m orurination, insulation for the use of valves of 14 units, 2 regulatory units and 14 units) of ETAP 3: ex-post Energy Audit. The planned activities within the framework of the project follow the assumptions set out in the ROP WiM for Priority Axis 4 — Energy efficiency, Thematic Objective 4 — Supporting the shift towards a low-carbon economy in all sectors through a 73.72 % energy efficiency improvement project, a 77.42 % reduction in annual heating energy consumption and a 79.38 % reduction in greenhouse gas emissions. (English) / rank
Normal rank
 

Revision as of 16:55, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Energy efficiency increase WTW Poland Sp. z o.o. in Bartoszyce through a comprehensive thermal modernisation of the company’s building
Project in Poland financed by DG Regio

    Statements

    0 references
    797,058.05 zloty
    0 references
    191,293.93 Euro
    13 January 2020
    0 references
    1,219,133.58 zloty
    0 references
    292,592.06 Euro
    13 January 2020
    0 references
    65.38 percent
    0 references
    18 April 2018
    0 references
    31 December 2019
    0 references
    WTW POLAND SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    54°15'20.9"N, 20°48'24.5"E
    0 references
    Przedmiotem projektu jest poprawa efektywność energetycznej budynku przedsiębiorstwa WTW Poland Sp. z o.o. poprzez przeprowadzenie kompleksowej termomodernizacji wraz z wymianą źródła ciepła. Realizacja przedsięwzięcia odbywać się będzie w siedzibie firmy przy ul. Konopnickiej 2F w Bartoszycach nr działki 75/29 obr. 280101_1.0008 miasta Bartoszyce. Data rozpoczęcia realizacji prac przygotowawczych projektu 18.04.2018 r. Rzeczowe rozpoczęcie realizacji projektu 02.04.2019 r. Zakończenie projektu nastąpi 31.12.2019 r. ZAKRES RZECZOWY I ETAPY REALIZACJI: ETAP 1: prace przygotowawcze: audyt energetycznych ex ante, dokumentacja techniczna, ekspertyza ornitologiczna i chiropterologiczna, studium wykonalności. ETAP 2: wykonanie robót budowlanych: - termomodernizacja hali produkcyjnej przedsiębiorstwa WTW Poland o powierzchni użytkowej 2319,5 m2: wymiana 1007 m2 zewnętrznej ściany warstwowej hali, ocieplenie 597 m2 ściany zewnętrznej, ocieplenie 2033,22 m2 stropodachu, ocieplenie 1497,35 m2 podłogi na gruncie, wymiana 1011,6 m2 okien, wymiana 57,5 m2 bramy(niekwalifikowane). - wymiana źródła ciepła na bardziej efektywne energetycznie oraz modernizacja instalacji centralnego ogrzewania i ciepłej wody użytkowej (montaż: 14 szt. nagrzewnic o mocy 16-18 kW/szt., 2 kotłów gazowych, automatyki pogodowej (1 kpl.), liczników ciepła dla c.o. i c.w.u., gazomierza,ok. 550 m orurowania, izolacji cieplnej do orurowania, zaworów odpowietrzających 14 szt., regulacyjnych 2 szt. oraz trójdrogowych 14 szt.) ETAP 3: audyt energetyczny ex post. Planowane w ramach projektu działania wpisują się w założenia określone w SzOOP RPO WiM dla Osi Priorytetowej 4 – Efektywność energetyczna, celu tematycznego 4 – Wspieranie przejścia na gospodarkę niskoemisyjną we wszystkich sektorach, poprzez uzyskane w ramach projektu zwiększenie efektywności energetycznej o 73,72%, zmniejszenie rocznego zużycia energii cieplnej o 77,42% oraz ograniczenie emisji gazów cieplarnianych o 79,38%. (Polish)
    0 references

    Identifiers

    RPWM.04.02.00-28-0007/18
    0 references