Clear, safe and eco-efficient replacement of street lighting with energy saving solutions — Step 2 (Q124071): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The project includes the modernisation of street lighting, which is owned by the municipality of Siemianowice Ślaowan, through the replacement of 340 luminaires (10 pieces of ornamental fittings and 330 holders of decorative fittings) on energy efficient (LED) (including wiring, booms and placards). The project is a continuation of a task of the same name in which a total of 2018 lighting points have been modernised. The project does not inclu...) |
||
Property / summary | |||
Property / summary: The project includes the modernisation of street lighting, which is owned by the municipality of Siemianowice Ślaowan, through the replacement of 340 luminaires (10 pieces of ornamental fittings and 330 holders of decorative fittings) on energy efficient (LED) (including wiring, booms and placards). The project is a continuation of a task of the same name in which a total of 2018 lighting points have been modernised. The project does not include replacements or the replacement of poles. (English) / rank | |||
Revision as of 11:38, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Clear, safe and eco-efficient replacement of street lighting with energy saving solutions — Step 2 |
Project in Poland financed by DG Regio |
Statements
548,200.7 zloty
0 references
644,942.0 zloty
0 references
85.0 percent
0 references
31 December 2018
0 references
30 June 2020
0 references
GMINA SIEMIANOWICE ŚLĄSKIE
0 references
Projekt obejmuje modernizację oświetlenia ulicznego stanowiącego własność Gminy Siemianowice Ślaskie poprzez wymianę 340 opraw oświetleniowych (10 szt. oprawy ozdobne, a 330 szt. to oprawy uliczne) na energooszczędne (LED) (włącznie z okablowaniem, wysięgnikami oraz tabliczkami). Projekt jest kontynuacją zadania o tej samej nazwie, w ramach którego zmodernizowano łącznie 2018 punktów oświetleniowych. Projekt nie obejmuje wymiany ani dobudowy słupów. (Polish)
0 references
Identifiers
RPSL.04.05.01-24-004A/19
0 references