“Professional perspectives of the Technical Schools Group — Direction of the future!” (Q117388): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The tasks planned to be carried out within the framework of the project will involve the upgrading and fitting of the Practical ITS Centre with the fitting-out of the site at ul. Grunwalka 18 in Białystok, construction of a storage building to wind up wood materials with a garage and the purchase of equipment for the establishment of a modern training centre, in line with safety and labour market needs, thereby increasing the level of vocation...) |
||
Property / summary | |||
Property / summary: The tasks planned to be carried out within the framework of the project will involve the upgrading and fitting of the Practical ITS Centre with the fitting-out of the site at ul. Grunwalka 18 in Białystok, construction of a storage building to wind up wood materials with a garage and the purchase of equipment for the establishment of a modern training centre, in line with safety and labour market needs, thereby increasing the level of vocational training in the timber, mechanical and food industry in the BOF and thus in the region. This effect will be achieved through the simultaneous implementation of the “soft” project from the ESF (the idea of an integrated project). The target audience is the students (from the area of the province) Podlaskie, BOF) from Białystok’s technical schools. The target group is also teachers ZSTwB. The project responds to the problems and needs arising from the detailed diagnosis carried out by the Technical School Complex in Białystok and included in the Development Strategy for the Development of Technical Schools in Białystok. Władysław Andersa na Lata 2016-2020 (approved by the authority), which mentions, among other things, the very poor condition of the ZSTwB infrastructure. Failure to carry out the project would entail increasing the problems encountered by the school at the present time and which are described in point. IV.2 The development of competitive educational institutions would lead to the marginalisation of ZSTwB in the education market and its graduates would be at risk of difficulties in finding employment and, as a result, unemployment. A description of the investment tasks is included in the STC in Annex 1 to the proposal. (English) / rank | |||
Revision as of 17:24, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | “Professional perspectives of the Technical Schools Group — Direction of the future!” |
Project in Poland financed by DG Regio |
Statements
11,203,054.15 zloty
0 references
13,787,749.63 zloty
0 references
81.25 percent
0 references
30 April 2019
0 references
31 July 2020
0 references
MIASTO BIAŁYSTOK
0 references
Zadania zaplanowane do realizacji w ramach projektu zakładają przebudowę z rozbudową i wyposażeniem Pracowni Zajęć Praktycznych ZST wraz z zagospodarowaniem terenu przy ul. Grunwaldzkiej 18 w Białymstoku, budowę budynku magazynowego z wiatą na składowanie materiałów drzewnych i boksem garażowym oraz zakup wyposażenia do placówki w celu stworzenia nowoczesnej placówki szkoleniowej, zgodnie z wymaganiami bezpieczeństwa i zapotrzebowaniem rynku pracy, co wpłynie na podniesienie poziomu kształcenia zawodowego w branży drzewnej, mechanicznej i spożywczej na terenie BOF, a tym samym w regionie. Osiągnięcie tego efektu będzie możliwe dzięki równoczesnej realizacji projektu „miękkiego" ze środków EFS (idea projektu zintegrowanego). Grupę docelową stanowią uczniowie (z terenu woj. Podlaskiego, terenu BOF) z Zespołu Szkół Technicznych w Białymstoku. Grupę docelową stanowią także nauczyciele ZSTwB. Projekt stanowi odpowiedź na problemy i potrzeby wynikające ze szczegółowej diagnozy przeprowadzonej przez Zespół Szkół Technicznych w Białymstoku i zawartej w opracowanej Strategii Rozwoju Zespołu Szkół Technicznych im. Gen. Władysława Andersa na Lata 2016 – 2020 (zatwierdzonej przez organ prowadzący), gdzie jest mowa m.in. o bardzo złym stanie infrastruktury ZSTwB. Zaniechanie realizacji projektu wiązałoby się z pogłębianiem się problemów z jakimi w chwili obecnej boryka się szkoła a które zostały opisane w pkt. IV.2. Rozwój konkurencyjnych placówek edukacyjnych doprowadziłaby do marginalizacji ZSTwB na rynku edukacyjnym, a jego absolwentom groziłby trudnościami w znalezieniu zatrudnienia, a w konsekwencji bezrobociem. Opis zadań inwestycyjnych znajduje się w SW stanowiącym załącznik nr 1 do wniosku. (Polish)
0 references
Identifiers
RPPD.08.02.02-20-0012/18
0 references