Construction of the municipal pre-school in Mielec (Q117343): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The subject of the project: ‘The construction of a municipal nursery in the Mielnik’ is the construction of a new building in the Mielnik nursery, including the adaptation and adaptation of the premises and the development of the area around, in the area of the establishment and equipment of the playground. The project will be located in Podlaskie Province, the powiat siemiatycki, in the municipality of Mielnik, in the municipality of Mielnik,...)
Property / summary
The subject of the project: ‘The construction of a municipal nursery in the Mielnik’ is the construction of a new building in the Mielnik nursery, including the adaptation and adaptation of the premises and the development of the area around, in the area of the establishment and equipment of the playground. The project will be located in Podlaskie Province, the powiat siemiatycki, in the municipality of Mielnik, in the municipality of Mielnik, on the part of the parcel No. 6143/2, 4th rim. The scope of this investment includes: Building a 1-storey kindergarten in steel modular technology with kitchen and consumption rooms; Construction of connections: gas, energy, water, sanitation and stormwater; — fitting-out of premises; The implementation of the playground; — Construction of a paved and manoeuvring area. The strategic objective of the project, in line with the objective of the Priority Axis VIII. The infrastructure for services of general interest, the Podlaskie Regional Operational Programme for 2014-2020 is improving access to pre-school education. The objectives of the project are to be found in the specific objective of Sub-action 8.2.1 “Pre-school infrastructure, vocational and continuous training”, Measure 8.2 Complement to the deficits in education and training infrastructure, Priority VIII. Infrastructure for services of general interest. The specific objective to be achieved through the implementation of the project under Measure 8.2.1 is increased access to pre-school education. The implementation of the project will enable the indicators to be achieved: at product level: — Number of pre-school infrastructure facilities supported: 1 units — Potential supported infrastructure for childcare or education infrastructure (CI35): 50 people. — Number of facilities adapted to the needs of persons with disabilities: 1 (b) at result level: Making available to the residents of the Municipality of Mielnik a new nursery, ensuring the proper living conditions of the institutions: 1 units (English)
 
Property / summary: The subject of the project: ‘The construction of a municipal nursery in the Mielnik’ is the construction of a new building in the Mielnik nursery, including the adaptation and adaptation of the premises and the development of the area around, in the area of the establishment and equipment of the playground. The project will be located in Podlaskie Province, the powiat siemiatycki, in the municipality of Mielnik, in the municipality of Mielnik, on the part of the parcel No. 6143/2, 4th rim. The scope of this investment includes: Building a 1-storey kindergarten in steel modular technology with kitchen and consumption rooms; Construction of connections: gas, energy, water, sanitation and stormwater; — fitting-out of premises; The implementation of the playground; — Construction of a paved and manoeuvring area. The strategic objective of the project, in line with the objective of the Priority Axis VIII. The infrastructure for services of general interest, the Podlaskie Regional Operational Programme for 2014-2020 is improving access to pre-school education. The objectives of the project are to be found in the specific objective of Sub-action 8.2.1 “Pre-school infrastructure, vocational and continuous training”, Measure 8.2 Complement to the deficits in education and training infrastructure, Priority VIII. Infrastructure for services of general interest. The specific objective to be achieved through the implementation of the project under Measure 8.2.1 is increased access to pre-school education. The implementation of the project will enable the indicators to be achieved: at product level: — Number of pre-school infrastructure facilities supported: 1 units — Potential supported infrastructure for childcare or education infrastructure (CI35): 50 people. — Number of facilities adapted to the needs of persons with disabilities: 1 (b) at result level: Making available to the residents of the Municipality of Mielnik a new nursery, ensuring the proper living conditions of the institutions: 1 units (English) / rank
Normal rank
 

Revision as of 16:38, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the municipal pre-school in Mielec
Project in Poland financed by DG Regio

    Statements

    0 references
    282,676.6 zloty
    0 references
    67,842.38 Euro
    13 January 2020
    0 references
    1,570,425.6 zloty
    0 references
    376,902.14 Euro
    13 January 2020
    0 references
    18.0 percent
    0 references
    10 January 2018
    0 references
    21 November 2018
    0 references
    GMINA MIELNIK
    0 references
    0 references

    52°19'51.2"N, 23°2'56.0"E
    0 references
    Przedmiotem projektu pn. „Budowa przedszkola gminnego w Mielniku” jest budowa nowego budynku przedszkola w Mielniku, w tym adaptacja i dostosowanie pomieszczeń oraz zagospodarowanie terenu wokół, w zakresie utworzenia i wyposażenia placu zabaw. Projekt zlokalizowany będzie w województwie podlaskim, w powiecie siemiatyckim, na terenie gminy wiejskiej Mielnik, w miejscowości Mielnik, na części działki nr geod. 6143/2, obręb 4. Zakres niniejszej inwestycji obejmuje: - budowę 1-kondygnacyjnego budynku przedszkola w technologii stalowej modułowej wraz z zapleczem kuchennym i salą konsumpcyjną; - wykonanie przyłączy: gazowego, energetycznego, wodnego, kanalizacji sanitarnej i deszczowej; - wyposażenie pomieszczeń; - wykonanie placu zabaw; - wykonanie drogi utwardzonej i placu manewrowego. Celem strategicznym projektu, zgodnym z celem Osi priorytetowej VIII. Infrastruktura dla usług użyteczności publicznej, Regionalnego Programu Operacyjnego Województwa Podlaskiego na lata 2014-2020, jest zwiększenie dostępności do edukacji przedszkolnej. Cele projektu wpisują się w cel szczegółowy Poddziałania 8.2.1 Infrastruktura przedszkolna, kształcenia zawodowego i ustawicznego, Działania 8.2 Uzupełnienie deficytów w zakresie infrastruktury edukacyjnej i szkoleniowej, Osi Priorytetowej VIII. Infrastruktura dla usług użyteczności publicznej. Celem szczegółowym do osiągnięcia poprzez realizację projektu w ramach Poddziałania 8.2.1 jest zwiększona dostępność do edukacji przedszkolnej. Realizacja projektu pozwoli na osiągnięcie wskaźników: a) na poziomie produktu: - Liczba wspartych obiektów infrastruktury przedszkolnej: 1 szt. - Potencjał objętej wsparciem infrastruktury w zakresie opieki nad dziećmi lub infrastruktury edukacyjnej (CI35): 50 osób. - Liczba obiektów dostosowanych do potrzeb osób z niepełnosprawnościami: 1 szt. b) na poziomie rezultatu: - Udostępnienie mieszkańcom Gminy Mielnik nowego przedszkola, zapewniającego właściwe warunki bytowe wychowankom: 1 szt. (Polish)
    0 references

    Identifiers

    RPPD.08.02.01-20-0003/18
    0 references