Construction of the 39,96 Kw solar panels and the installation of two heat pump micro-installations with a capacity of 38 kw to Zielonka Stara. (Q108927): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The planned investment in Chemikal Partners in Zielonka Stara 2a, parcel 152/2 in the municipality of Zvolen, will consist of: Construction of the installation of photovoltaic panels under 39 960Wp.consisting of 148 sub-panels on the roof of a production building and an office building of Chemikal Partners and two inverters having a power of 20,75 kWp each. The area to be converted as a result of the project is approximately 272 m². The instal...)
Property / summary
The planned investment in Chemikal Partners in Zielonka Stara 2a, parcel 152/2 in the municipality of Zvolen, will consist of: Construction of the installation of photovoltaic panels under 39 960Wp.consisting of 148 sub-panels on the roof of a production building and an office building of Chemikal Partners and two inverters having a power of 20,75 kWp each. The area to be converted as a result of the project is approximately 272 m². The installation will be connected to the dividing line in the production building. This energy will be used for its own purposes. The system will be equipped with inverters. A locker with security features and stops to install the PV will be connected to the existing switchboard in the manufacturing building. The following pre-installation internal installation shall be designed: Solar installation, installation between the security cabinet and inverters, main installation. Installation of ground heat pumps with a combined output of 76,00 kWp consisting of two micro-installations: installation of a heat pump with a capacity of 38 kw and installation of a heat pump capacity of 38 quarters in the town of Zielonka 2a and plot No. 152/2 for Chemikal Partners Andrzej Chróst. To date, the office building and the production building have been heated by a solid fuel boiler. The dismantling of an existing boiler is designed, closing the heating circuit by the diaphragm weighing vessel and the installation of the heat pump of the Vailant company, which will be connected to the second heat pump and operating in a cascade system. 20 holes (vertical probes) are designed to ensure energy from the ground (vertical probes) at a depth of 95 m each located in 152/2 parcel. Heat from the ground will be taken from the ground by the vertical plane, the U-tube built onto wells. In order to limit the number of cables transporting the heating factor to the building, 2 collective wells were designed. (English)
 
Property / summary: The planned investment in Chemikal Partners in Zielonka Stara 2a, parcel 152/2 in the municipality of Zvolen, will consist of: Construction of the installation of photovoltaic panels under 39 960Wp.consisting of 148 sub-panels on the roof of a production building and an office building of Chemikal Partners and two inverters having a power of 20,75 kWp each. The area to be converted as a result of the project is approximately 272 m². The installation will be connected to the dividing line in the production building. This energy will be used for its own purposes. The system will be equipped with inverters. A locker with security features and stops to install the PV will be connected to the existing switchboard in the manufacturing building. The following pre-installation internal installation shall be designed: Solar installation, installation between the security cabinet and inverters, main installation. Installation of ground heat pumps with a combined output of 76,00 kWp consisting of two micro-installations: installation of a heat pump with a capacity of 38 kw and installation of a heat pump capacity of 38 quarters in the town of Zielonka 2a and plot No. 152/2 for Chemikal Partners Andrzej Chróst. To date, the office building and the production building have been heated by a solid fuel boiler. The dismantling of an existing boiler is designed, closing the heating circuit by the diaphragm weighing vessel and the installation of the heat pump of the Vailant company, which will be connected to the second heat pump and operating in a cascade system. 20 holes (vertical probes) are designed to ensure energy from the ground (vertical probes) at a depth of 95 m each located in 152/2 parcel. Heat from the ground will be taken from the ground by the vertical plane, the U-tube built onto wells. In order to limit the number of cables transporting the heating factor to the building, 2 collective wells were designed. (English) / rank
Normal rank
 

Revision as of 17:49, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the 39,96 Kw solar panels and the installation of two heat pump micro-installations with a capacity of 38 kw to Zielonka Stara.
Project in Poland financed by DG Regio

    Statements

    0 references
    279,764.97 zloty
    0 references
    67,143.59 Euro
    13 January 2020
    0 references
    497,531.67 zloty
    0 references
    119,407.6 Euro
    13 January 2020
    0 references
    56.23 percent
    0 references
    3 August 2017
    0 references
    31 December 2018
    0 references
    ANDRZEJ CHRÓST CHEMIKAL PARTNERS
    0 references
    0 references

    51°21'23.4"N, 21°35'4.2"E
    0 references
    Projektowana inwestycja w firmie Chemikal Partners w miejscowości Zielonka Stara 2a, działka 152/2 w gminie Zwoleń polegać będzie na: Budowie instalacji paneli fotowoltaicznych o mocy 39 960Wp.składająca się ze 148 szt. paneli posadowionych na dachu budynku produkcyjnego i budynku biurowego firmy Chemikal Partners oraz dwóch inwerterów o mocy 20,75 kWp każdy. Powierzchnia przeznaczona do przekształcenia w wyniku realizacji przedsięwzięcia wynosi ok 272 m2. Instalacja podłączona będzie do rozdzielni w budynku produkcyjnym. Energia ta będzie wykorzystywana na własne potrzeby. Układ wyposażony zostanie w automatykę sterującą pracą falowników. Szafka z zabezpieczeniami i ogranicznikami przepięć do instalacji ogniw fotowoltaicznych połączona będzie z istniejącą rozdzielnicą w budynku produkcyjnym. Na terenie projektuje się następującą instalację wewnętrzną zalicznikową: Instalacja solarna, Instalacja pomiędzy szafką zabezpieczeniową a inwerterami, Instalacja główna. Instalacja gruntowych pomp ciepłą o łącznej mocy 76,00 kWp składająca się z dwóch mikroinstalacji: instalacja pompy ciepła o mocy 38 kw i instalacja pompy ciepła o mocy 38 kw. w miejscowości Zielonka 2a działka nr 152/2 dla firmy Chemikal Partners Andrzej Chróst. Dotychczas budynek biurowy i budynek produkcyjny ogrzewane były za pomocą kotła na paliwo stałe. Projektuje się demontaż istniejącego kotła, zamknięcie obiegu grzewczego przez przeponowe naczynie wzbiorcze oraz montaż pompy ciepła firmy Vaillant która połączona będzie z drugą pompą ciepła i działała będzie w systemie kaskadowym. Dla zapewnienia pozyskiwania energii z gruntu zaprojektowano 20 otworów (sondy pionowe) o głębokości 95m każdy zlokalizowane na działce o numerze ewidencyjnym 152/2. Energia cieplna pozyskiwana będzie z gruntu przez pionowe wymienniki, U-rurki zabudowane w otworach wiertniczych. W celu ograniczenia liczby przewodów transportujących czynnik grzewczy do budynku zaprojektowano 2 studnie zbiorczą. (Polish)
    0 references

    Identifiers

    RPMA.04.01.00-14-9303/17
    0 references