Thermo-modernisation of buildings of Niepokalanów (Q109041): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The project is intended to be carried out in the area of thermal renovation of the buildings on the premises of the wheel of the Nieuktora None (OO.). Francis not called) in Papauna. The project covers 11 buildings with a total useful floor area of 24 723 m²: Building No 2 with a usable storage of 2 250 m², Building No 3 with a usable length of 185 m², Building No 4 with a usable length of 2 850 m², Building No 5 with a usable length of 2 150 ...) |
||
Property / summary | |||
Property / summary: The project is intended to be carried out in the area of thermal renovation of the buildings on the premises of the wheel of the Nieuktora None (OO.). Francis not called) in Papauna. The project covers 11 buildings with a total useful floor area of 24 723 m²: Building No 2 with a usable storage of 2 250 m², Building No 3 with a usable length of 185 m², Building No 4 with a usable length of 2 850 m², Building No 5 with a usable length of 2 150 m², Building No 7 with a usable length of 878 m², Building No 8 with a usable length of 960 m², Building No 9 with a usable length of 4 382 m², Building No 10 with a usable length of 5 000 m², Building No 12,13 with a usable length of 1 766 m², Building No 16 with a usable length of 2 287 m², in the building 2 015, with a usable formulation of m². The investment will have a comprehensive dimension and it involves a deep energy modernisation, combined with the use of renewable energy sources (solar installations and heat pumps). The following works will be carried out within the framework of the project: Insulation of external walls, warming of the ceiling, flat roof, roof, replacement of window and door frames, frames for window frames, replacement of lighting based on energy efficient lighting, upgrading of the CWU installation, installation of solar installations (solar collectors) and heat pumps. The main objective of the project is to increase the energy efficiency of the 11 buildings of the Niepokalanów community. The investment will reduce atmospheric emissions. The current level of energy consumption is 8 568 048.08 kWh/year, after the renovation works will be 2 965 423.96 kWh/year. As a result of the project, the energy consumption will be reduced by 5 602 624.12 kWh/year. Investment (solar installations and heat pumps) will avoid CO2 emissions of 1 096 763.69 kg/year. (English) / rank | |||
Revision as of 09:18, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermo-modernisation of buildings of Niepokalanów |
Project in Poland financed by DG Regio |
Statements
8,376,427.97 zloty
0 references
10,470,534.97 zloty
0 references
80.0 percent
0 references
1 September 2016
0 references
30 April 2019
0 references
KLASZTOR NIEPOKALANÓW ZAKONU BRACI MNIEJSZYCH KONWENTUALNYCH (OO. FRANCISZKANIE)
0 references
Planowany do realizacji projekt polega na termomodernizacji budynków na terenie Klasztoru Niepokalanów Zakonu Braci Mniejszych Konwentualnych (OO. Franciszkanie) w Paprotni. Przedsięwzięciem objętych jest 11 budynków o łącznej powierzchni użytkowej 24 723 m2: - budynek nr 2 o pow. użytkowej 2 250 m2, - budynek nr 3 o pow. użytkowej 185 m2, - budynek nr 4 o pow. użytkowej 2 850 m2, - budynek nr 5 o pow. użytkowej 2 150 m2, - budynek nr 7 o pow. użytkowej 878 m2, - budynek nr 8 o pow. użytkowej 960 m2, - budynek nr 9 o pow. użytkowej 4 382 m2, - budynek nr 10 o pow. użytkowej 5 000 m2, - budynki nr 12,13 o pow. użytkowej 1 766 m2, - budynek nr 16 o pow. użytkowej 2 287 m2, - Bazylika o pow. użytkowej 2 015 m2. Inwestycja będzie miała kompleksowy wymiar i zakłada głęboką modernizację energetyczną, połączoną z zastosowaniem odnawialnych źródeł energii (instalacji solarnych i pomp ciepła). W ramach przedsięwzięcia zostaną przeprowadzone następujące prace: - ocieplenie ścian zewnętrznych, - ocieplenie stropu, stropodachu, dachu, - wymiana stolarki okiennej i drzwiowej, - montaż nawiewników okiennych, - wymiana oświetlenia wbudowanego na energooszczędne (ledowe), - wymiana kotłowni i instalacji C.O., - modernizacja instalacji CWU, - montaż instalacji solarnych (kolektorów słonecznych) oraz pomp ciepła. Głównym celem projektu jest zwiększenie efektywności energetycznej 11 budynków Klasztoru Niepokalanów. Inwestycja ograniczy emisję zanieczyszczeń trafiających do atmosfery. Obecny poziom zużycia energii kształtuje się na poziomie 8 568 048,08 kWh/rok, po zakończeniu prac termomodernizacyjnych będzie wynosił 2 965 423,96 kWh/rok. W wyniku realizacji projektu zużycie energii zmniejszy się o 5 602 624,12 kWh/rok. Dzięki inwestycji (zastosowaniu instalacji solarnych oraz pomp ciepła) uniknie się emisji CO2 w ilości 1 096 763,69 kg/rok. (Polish)
0 references
Identifiers
RPMA.04.02.00-14-5375/16
0 references