Increasing energy efficiency in public buildings in Gmina Strom (Q108986): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The project ‘Increasing energy efficiency in public buildings in the municipality of Strom’ will include: 1. Office of the Municipal Office — street Piaski 4: The insulation of the roof, the modernisation of the subdivision of the subdivision of the building on the ground — warming, modernisation of the boundary of the Stricuan external bulkhead floor of 38 cm — warming, insulation of the wall of 43 cm, modernisation of the envelope of Stroera...)
Property / summary
The project ‘Increasing energy efficiency in public buildings in the municipality of Strom’ will include: 1. Office of the Municipal Office — street Piaski 4: The insulation of the roof, the modernisation of the subdivision of the subdivision of the building on the ground — warming, modernisation of the boundary of the Stricuan external bulkhead floor of 38 cm — warming, insulation of the wall of 43 cm, modernisation of the envelope of Stroerański envelope — warming, replacement of doors and windows, solar collectors, replacement of luminaires on energy efficient LED bulbs; 2. Voluntary Fire Service Building — Boska Wola: The modernisation of the envelope for Strom Strom — warming, roof insulation, insulation of the outer wall of 42 cm, replacement of doors and windows, solar collectors, replacement of luminaires on an energy-efficient LED; 3. Voluntary Fire Brigade building: Modernisation of the envelope of Strom Strom — warming up, roof warming, modernisation of the boundary of 42 cm side by external side — warming, replacement of doors and windows, solar collectors, replacement of luminaires on energy efficient LED. The main objectives of the project are: • Increase the energy efficiency of public buildings in the municipality of Strom; • Reduction of CO2 emissions. The project’s sub-objectives include, but are not limited to: • Increase the attractiveness of the municipality to future and current inhabitants; • Improving living conditions in areas with the least development prospects in the region. The focus of the project is to help reduce energy demand and increase the awareness of the population. The funds to cover the own contribution will be secured in the budget of the Municipality of the Strom. The project corresponds to the needs of beneficiaries — residents of the municipality of Strom and of the entire region, as identified in the Low Carbon Economy Plan on air quality. The aim of improving the living standards of the local population, including clean air, will have a positive impact on the image of the municipality. (English)
 
Property / summary: The project ‘Increasing energy efficiency in public buildings in the municipality of Strom’ will include: 1. Office of the Municipal Office — street Piaski 4: The insulation of the roof, the modernisation of the subdivision of the subdivision of the building on the ground — warming, modernisation of the boundary of the Stricuan external bulkhead floor of 38 cm — warming, insulation of the wall of 43 cm, modernisation of the envelope of Stroerański envelope — warming, replacement of doors and windows, solar collectors, replacement of luminaires on energy efficient LED bulbs; 2. Voluntary Fire Service Building — Boska Wola: The modernisation of the envelope for Strom Strom — warming, roof insulation, insulation of the outer wall of 42 cm, replacement of doors and windows, solar collectors, replacement of luminaires on an energy-efficient LED; 3. Voluntary Fire Brigade building: Modernisation of the envelope of Strom Strom — warming up, roof warming, modernisation of the boundary of 42 cm side by external side — warming, replacement of doors and windows, solar collectors, replacement of luminaires on energy efficient LED. The main objectives of the project are: • Increase the energy efficiency of public buildings in the municipality of Strom; • Reduction of CO2 emissions. The project’s sub-objectives include, but are not limited to: • Increase the attractiveness of the municipality to future and current inhabitants; • Improving living conditions in areas with the least development prospects in the region. The focus of the project is to help reduce energy demand and increase the awareness of the population. The funds to cover the own contribution will be secured in the budget of the Municipality of the Strom. The project corresponds to the needs of beneficiaries — residents of the municipality of Strom and of the entire region, as identified in the Low Carbon Economy Plan on air quality. The aim of improving the living standards of the local population, including clean air, will have a positive impact on the image of the municipality. (English) / rank
Normal rank
 

Revision as of 17:56, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Increasing energy efficiency in public buildings in Gmina Strom
Project in Poland financed by DG Regio

    Statements

    0 references
    852,864.82 zloty
    0 references
    204,687.56 Euro
    13 January 2020
    0 references
    1,066,081.02 zloty
    0 references
    255,859.44 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    5 January 2016
    0 references
    31 December 2017
    0 references
    GMINA STROMIEC
    0 references

    51°38'47.4"N, 21°5'27.6"E
    0 references
    Projekt "Zwiększenie efektywności energetycznej w budynkach użyteczności publicznej w Gminie Stromiec" obejmie: 1. Budynek Urzędu Gminy – ulica Piaski 4 : Ocieplenie dachu, Modernizacja przegrody Podłoga na gruncie – ocieplenie, Modernizacja przegrody Ściana zewnętrzna podziemia gr. 38 cm – ocieplenie, Ocieplenie ścian warstwowych gr. 43 cm, Modernizacja przegrody Strop zewnętrzny żerański – ocieplenie, Wymiana drzwi i okien, Kolektory solarne, Wymiana opraw na źródła energooszczędne LED; 2. Budynek Ochotniczej Straży Pożarnej – Boska Wola: Modernizacja przegrody Strop zewnętrzny – ocieplenie, Ocieplenie dachu, Ocieplenie ścian zewnętrznych gr. 42 cm, Wymiana drzwi i okien, Kolektory solarne, Wymiana opraw na źródła energooszczędne LED; 3. Budynek Ochotniczej Straży Pożarnej – Boże: Modernizacja przegrody Strop zewnętrzny – ocieplenie, Ocieplenie dachu, Modernizacja przegrody Ściana zewnętrzna gr. 42 cm – ocieplenie, Wymiana drzwi i okien, Kolektory solarne, Wymiana opraw na źródła energooszczędne LED. Głównymi celami projektu są: • Zwiększenie efektywności energetycznej budynków użyteczności publicznej na terenie gminy Stromiec; • Zmniejszenie emisji CO2. Cele cząstkowe projektu obejmują między innymi: • Zwiększenie atrakcyjności gminy dla przyszłych i obecnych mieszkańców; • Poprawa warunków życia na obszarach o najmniejszych perspektywach rozwojowych w regionie. Projekt ukierunkowany jest na wspomaganie procesu zmniejszenia zapotrzebowania na energie? i zwiększania świadomości ekologicznej mieszkańców. Środki finansowe na pokrycie wkładu własnego zostaną zabezpieczone w budżecie Gminy Stromiec. Projekt odpowiada na potrzeby Beneficjentów – mieszkańców Gminy Stromiec i całego regionu, zidentyfikowane w Planie Gospodarki Niskoemisyjnej, dotyczących jakości powietrza. Dbałość o polepszanie stopy życiowej mieszkańców, w tym czystego powietrza, działań proekologicznych pozytywnie wpłynie na wizerunek Gminy. (Polish)
    0 references

    Identifiers

    RPMA.04.02.00-14-5303/16
    0 references