Thermal modernisation of the Primary School Building in willow (Q105303): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: EU contribution (P835): 141,698.6376 euro) |
(Changed an Item: Fixing rounding issue) |
||||||||||||||
Property / EU contribution | |||||||||||||||
141,698.64 Euro
| |||||||||||||||
Property / EU contribution: 141,698.64 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 141,698.64 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.24 Euro
| |||||||||||||||
Property / EU contribution: 141,698.64 Euro / qualifier | |||||||||||||||
point in time: 13 January 2020
|
Revision as of 23:01, 23 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of the Primary School Building in willow |
Project in Poland financed by DG Regio |
Statements
590,410.99 zloty
0 references
694,601.17 zloty
0 references
85.0 percent
0 references
29 September 2017
0 references
31 December 2019
0 references
GMINA STARY ZAMOŚĆ
0 references
Przedmiotem projektu jest termomodernizacja budynku SPw wierzbie w Gminie Stary Zamość. Jakość powietrza w gminie jest dobra. Dla gminy nie ma obowiązku opracowania programu ochrony powietrza.Zakres prac obejmuje m.in:ocieplenie ścian zewnętrznych budynku - ocieplenie stropu poddasza - ocieplenie stropu piwnicy - wymiana okien - wymiana drzwi zewnętrznych - modernizacja instalacji c.o.wymiana kotła weglowego na kocioł opalany peletami wyposażonego w monitoring zdalnego sterowania pracą kotła o połączeniu WiFi lub GSM oraz opomiarowanie kotłowni), Dostosowanie wejść dla osób niepełnosprawnych, Dokumentacja techniczna, Audyty energetyczne, SW i Kampania promocyjna . W ramach p. zostaną osiągnięte następujące wskaźniki: Prod.: Liczba zmoderniz. en. bud.- 1; Powierzchnia użytkowa budynków poddanych termo. - 1 419 m2;; Rezult.: Ilość zaoszczędzonej en. cieplnej - 1 715 GJ/rok; Zmniejszenie rocznego zużycia en. pierw. w bud. publ. (CI32) - 476 302 kWh/rok; Szacowany roczny spadek emisji gazów ciepl. (CI34) -236,41 tony/rok, Grupy docelowe p.: mieszkańcy Gminy Stary Zamość korzystający z usług przedmiotowej placówki edukacyjnej w Wierzbie (Polish)
0 references
The project is the thermal renovation of the SPW Building in the municipality of Stary Zamość. The quality of air in the municipality is good. For the municipality there is no obligation to draw up a programme of protection. the scope of the work includes m. in:ocieplenie the external wall of the building — the insulation of the costume — the insulation of the basement — replacement of windows — replacement of external doors — replacement of an external door — replacement of a vegan boiler with a fan boiler equipped with monitoring remote control of the WIFI/GSM boiler and the sub-metering of the boiler), adaptation of entrances for disabled persons, technical documentation, energy audits, SW and promotional campaign. The following indicators will be met in the framework of Mr D. Prod.: Number of modernising budgets — 1; Usable floor area of termo buildings. 1 419 m²; Rezult: Amount of heat saved — 1 715 GJ/year; Reduction of annual consumption. (CI32) — 476 302 kWh/year; The estimated annual decrease in the thermal emissions of the heat. (CI34) -236,41 tonnes/year, target groups: the residents of the Municipality of Stary Zamość benefiting from the services of the educational establishment in the top (English)
0 references
Identifiers
RPLU.05.02.00-06-0037/17
0 references