Construction of a photovoltaic farm in Marianka (Q104891): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The project consists of the construction of a PV power plant with an installed capacity of 0.99 MW on part of the plot No 136/2 within the Municipality of Stary Bras. The applicant has the right to the property on which he will be built up to 31.12.2035 under the lease contract of 15.04.2016. The plant will consist of high performance solar panels (3768 units with a power rating of 265 W, assuming a high minimum performance factor of 16.2 %) i...)
Property / summary
The project consists of the construction of a PV power plant with an installed capacity of 0.99 MW on part of the plot No 136/2 within the Municipality of Stary Bras. The applicant has the right to the property on which he will be built up to 31.12.2035 under the lease contract of 15.04.2016. The plant will consist of high performance solar panels (3768 units with a power rating of 265 W, assuming a high minimum performance factor of 16.2 %) installed on steel wafers with a slope of 36o, connected to inverters with a efficiency of at least 98 %, a n nn/SN station. The farm will be equipped with devices and systems for continuous monitoring of its work by making the most of the farm for energy production and monitoring possible damage. This is presented in detail in the technical design and financial statement. Due to the location of the farm (one of the most highly exposed regions in the country) and advanced technology, the plant will be able to produce around 1 051 MWh of electricity during the year. The electricity generated will be supplied to the energy network SN 15 kV via a transformer station n/SN. The estimated lifetime of the farm is 25 years. The technology used meets the EU Ecolabel criteria and standards as defined by the President of the PKN on the list of harmonised standards. The project will be implemented in the second half of 2018. The project will be carried out on the basis of indirect payment claims. As a result of the project, CO2 emissions will be reduced by 2 881,66 Mg. The project will have a positive impact on the following audiences: Applicant, — electricity consumers. (English)
 
Property / summary: The project consists of the construction of a PV power plant with an installed capacity of 0.99 MW on part of the plot No 136/2 within the Municipality of Stary Bras. The applicant has the right to the property on which he will be built up to 31.12.2035 under the lease contract of 15.04.2016. The plant will consist of high performance solar panels (3768 units with a power rating of 265 W, assuming a high minimum performance factor of 16.2 %) installed on steel wafers with a slope of 36o, connected to inverters with a efficiency of at least 98 %, a n nn/SN station. The farm will be equipped with devices and systems for continuous monitoring of its work by making the most of the farm for energy production and monitoring possible damage. This is presented in detail in the technical design and financial statement. Due to the location of the farm (one of the most highly exposed regions in the country) and advanced technology, the plant will be able to produce around 1 051 MWh of electricity during the year. The electricity generated will be supplied to the energy network SN 15 kV via a transformer station n/SN. The estimated lifetime of the farm is 25 years. The technology used meets the EU Ecolabel criteria and standards as defined by the President of the PKN on the list of harmonised standards. The project will be implemented in the second half of 2018. The project will be carried out on the basis of indirect payment claims. As a result of the project, CO2 emissions will be reduced by 2 881,66 Mg. The project will have a positive impact on the following audiences: Applicant, — electricity consumers. (English) / rank
Normal rank
 

Revision as of 17:12, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a photovoltaic farm in Marianka
Project in Poland financed by DG Regio

    Statements

    0 references
    830,637.02 zloty
    0 references
    199,352.88 Euro
    13 January 2020
    0 references
    2,180,149.67 zloty
    0 references
    523,235.92 Euro
    13 January 2020
    0 references
    38.1 percent
    0 references
    1 April 2018
    0 references
    25 July 2019
    0 references
    LAZE LUBELSKA AGENCJA ZRÓWNOWAŻONEJ ENERGETYKI SP. Z O.O.
    0 references
    0 references
    Przedmiotem projektu jest budowa elektrowni fotowoltaicznej o mocy zainstalowanej 0,99 MW na części działki nr 136/2 w obrębie Gminy Stary Brus. Wnioskodawca posiada prawo do nieruchomości, na której będzie wybudowana do 31.12.2035 na podstawie umowy dzierżawy z dn. 15.04.2016. Elektrownia będzie się składać z wysokowydajnych paneli fotowoltaicznych (3768 szt. o mocy 265 W, zakładając wysoki minimalny współczynnik skuteczności modułu na poziomie 16,2%) zainstalowanych na stelażach wykonanych z ocynkowanej stali i aluminium o kacie nachylenia 36o, podłączonych do inwerterów o sprawności co najmniej 98%, stacji nn/SN. Farma będzie wyposażona w urządzenia i systemy do ciągłego monitoringu jej pracy maksymalnie wykorzystując farmę do produkcji energii oraz zapewniając monitoring ewentualnych uszkodzeń. Szczegółowo powyższe przedstawiono w projekcie technicznym oraz kosztorysie. Ze względu na położenie farmy (jeden z najbardziej nasłonecznionych regionów w kraju) oraz zaawansowaną technologię projektowana elektrownia będzie w stanie wyprodukować w ciągu roku łącznie około 1051 MWh energii elektr. Wytworzona energia elektr. będzie dostarczana do sieci energetycznej SN 15 kV poprzez stację transformatorową nn/SN. Przewidywany czas eksploatacji farmy to 25 lat. Zastosowana technologia spełnia kryteria i normy ekologiczne UE określone w obwieszczeniach Prezesa PKN w sprawie wykazu norm zharmonizowanych. Projekt będzie realizowany w II połowie 2018 r. Na dzień złożenia wniosku Wnioskodawca posiada wszystkie formalno-prawne dokumenty, włącznie z pozwoleniem na budowę i zabezpieczeniem wkładu własnego, nie występuje ryzyko nie zrealizowania projektu z przyczyn niezależnych od Wnioskodawcy. Projekt będzie realizowany na zasadzie pośrednich wniosków o płatność. W wyniku realizacji projektu nastąpi zmniejszenie emisji CO2 do atmosfery o 2 881,66 Mg. Projekt będzie miał pozytywny wpływ na następujących odbiorców: - wnioskodawca, - odbiorcy energii elektrycznej. (Polish)
    0 references

    Identifiers

    RPLU.04.02.00-06-0088/17
    0 references