Improvement of the water and sewerage system of the municipality and reconstruction of the wastewater treatment plant in Wąwolnika (Q105583): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The main objective of the project is to ensure the continuity of water supply and the collection of waste water in the municipality of Wąwolnica. Key results: The number of additional persons benefiting from an improved wastewater treatment capacity of 1156 p.e. Number of additional persons benefiting from an improved water supply of 2568, the target group of the project is the recipient of water supply and waste water services. The results wi...) |
||
Property / summary | |||
Property / summary: The main objective of the project is to ensure the continuity of water supply and the collection of waste water in the municipality of Wąwolnica. Key results: The number of additional persons benefiting from an improved wastewater treatment capacity of 1156 p.e. Number of additional persons benefiting from an improved water supply of 2568, the target group of the project is the recipient of water supply and waste water services. The results will be achieved as a result of the project’s scope: 1. Development and modernisation of the wastewater treatment plant in Wąwolnica 2.1. Reconstruction (modernisation) of the water intake in Wąwolnip 2.2. Expansion of the water supply network in Belżycka Street in Wąwolnica 2.3. Refurbishment — renovation of the water pumping station in msc. Shoulder 2.4. Refurbishment — renovation of the water pumping station in msc. Graboki 2.5. Payment collector system for msc. River 2.6. An online service to assess the satisfaction of users from 3 services received. Refurbishment — renovation of the sewage pumping station on the sanitary sewage network in msc. The river and the building within the proposed investment are now being supplied with water from a water station in the Wązwolnica system. The existing gravity network does not provide the water customer at the required pressure. In order to improve the pressure parameters supplied to the water and the fulfilment of the fire conditions, a new water supply network is foreseen to be constructed to which the pressurised water will be pressurised by means of a hydraulic reservoir installed in the building station. The water needs for domestic and economic purposes will not change until new building is integrated into the water mains network. A forward-looking increase in water demand for new customers in a quantity of 2 m³/d, including existing customers up to 5 m³/d, is foreseen. the water supply network is designed from EP 110/10 pipes to 1,25 MPa for a total length of 762 m combined by welding. In view of the need to carry out the works to be carried out, the operations of the operated units shall be designed in a mixed technology. (English) / rank | |||
Revision as of 16:42, 17 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improvement of the water and sewerage system of the municipality and reconstruction of the wastewater treatment plant in Wąwolnika |
Project in Poland financed by DG Regio |
Statements
3,429,701.87 zloty
0 references
4,034,943.42 zloty
0 references
85.0 percent
0 references
26 October 2015
0 references
30 July 2021
0 references
GMINA WĄWOLNICA
0 references
Celem głównym projektu jest zapewnienie ciągłości dostaw wody oraz odbioru ścieków na terenie gminy Wąwolnica. Kluczowe rezultaty: Liczba dodatkowych osób korzystających z ulepszonego oczyszczania ścieków 1156 RLM Liczba dodatkowych osób korzystających z ulepszonego zaopatrzenia w wodę 2568 Grupę docelową projektu stanowią odbiorcy usług w zakresie zaopatrzenia w wodę oraz odbioru ścieków. Rezultaty zostaną osiągnięte w wyniku zrealizowania zakresu projektu: 1. Rozbudowa i modernizacja oczyszczalni ścieków w Wąwolnicy 2.1. Przebudowa ( modernizacja) ujęcia wody w Wąwolnicy 2.2. Rozbudowa sieci wodociągowej w ulicy Bełżyckiej w Wąwolnicy 2.3. Modernizacja - remont pompowni wody w msc. Łopatki 2.4. Modernizacja - remont pompowni wody w msc. Grabówki 2.5. System inkasent dla msc. Zarzeka 2.6. Serwis internetowy w celu oceny poziomu satysfakcji użytkowników z otrzymanych usług 3. Modernizacja - remont przepompowni ścieków na sieci kanalizacji sanitarnej w msc. Zarzeka i Wąwolnica Budynki leżące w obrębie projektowanej inwestycji zaopatrywane są obecnie w wodę ze stacji wodociągowej w Wąwolnicy w systemie grawitacyjnym. Istniejąca sieć grawitacyjna nie dostarcza dla w/.w odbiorców wody pod wymaganym ciśnieniem. W celu poprawienia parametrów ciśnieniowych dostarczanej wody i spełnienia warunków pożarowych przewiduje się wykonanie nowej sieci wodociągowej ciśnieniowej, do której woda tłoczona będzie ciśnieniowo poprzez zestaw hydroforowy zamontowany w budynku stacji wodociągowej. Zapotrzebowanie wody na cele bytowo-gospodarcze nie zmieni się do czasu włączenia do sieci wodociągowej nowej zabudowy. Przewiduje się przyszłościowo zwiększenie zapotrzebowania wody dla nowych odbiorców w ilości 2 m3/d, łącznie z istniejącymi odbiorcami do 5 m3/d. Sieć wodociągową zaprojektowano z rur PE 110/10 na ciśnienie 1,25 MPa o długości łącznej 762 m łączonych przez zgrzewanie. Z uwagi na konieczność wykonania przewiertów sterowanych sieć jest projektowana w technologii mieszanej. (Polish)
0 references
Identifiers
RPLU.06.04.00-06-0006/17
0 references