Thermal modernisation of the building of the Municipal Office in Kozczonów (Q105412): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The main purpose of the project is to improve the quality of the natural environment in the region of Krzczons, through the thermal modernisation of the building of the Office of the Municipality located at ul. Calm 7 in Krzczonów. The realisation of the project will help to reduce the need for fossil fuels in the building. In addition, a comprehensive thermal modernisation process will contribute to reducing air pollution and improving ambien...) |
||
Property / summary | |||
Property / summary: The main purpose of the project is to improve the quality of the natural environment in the region of Krzczons, through the thermal modernisation of the building of the Office of the Municipality located at ul. Calm 7 in Krzczonów. The realisation of the project will help to reduce the need for fossil fuels in the building. In addition, a comprehensive thermal modernisation process will contribute to reducing air pollution and improving ambient air quality. This will be done by reducing GHG and dust emissions. As a consequence, this investment will improve the standard of living of the inhabitants by, inter alia, creating access to modern public infrastructure or reducing the costs of operating this infrastructure and increasing the socio-economic attractiveness of the municipality. The following works are envisaged: — construction of the modernisation of the heating system by means of replacement of radiators, fitting of shut-off valves, balancing, vent, thermostatic, meter of heat and replacement of the source on a gas condensing boiler with the completion of a liquid gas tank and connection to the building. — insulation of walls of the century, including replacement of blackboards, innering, rotary clay, and thermal bridges; — the insulation of the ceiling over the heated room; — pressure tarsus, replacement of gaskets, regulation of PVC windows and replacement of windows at basement; Replacement of external doors; Improving the installation of hot service water; An exchange of luminaires on LED with a motion sensor; The installation of PV. As a result of the project, the amount of thermal energy saved will be 176,00 GJ/year. Annual primary energy consumption in public buildings is also reduced by 130 753.49 kWh/year. In addition, an estimated 42,29 tqCO2 is an annual greenhouse gas reduction. The additional capacity of energy produced from RES is in turn 0,0168 MWt and the electricity from RES will reach 14,396 MWhe/year. (English) / rank | |||
Revision as of 09:00, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of the building of the Municipal Office in Kozczonów |
Project in Poland financed by DG Regio |
Statements
287,431.74 zloty
0 references
338,155.04 zloty
0 references
85.0 percent
0 references
19 October 2018
0 references
29 November 2021
0 references
GMINA KRZCZONÓW
0 references
Celem głównym projektu jest poprawa jakości środowiska naturalnego w gm. Krzczonów poprzez termomodernizację budynku Urzędu Gminy zlokalizowanego w przy ul. Spokojnej 7 w Krzczonowie. Realizacja projektu posłuży zmniejszeniu zapotrzebowania na energię z paliw kopalnych w przedmiotowym budynku. Ponadto przeprowadzenie procesu kompleksowej termomodernizacji przyczyni się do redukcji zanieczyszczenia powietrza atmosferycznego i poprawie jego jakości. Stanie się to dzięki zmniejszeniu emisji gazów cieplarnianych i pyłów do atmosfery. W konsekwencji inwestycja ta poprawi komfort życia mieszkańców m.in. poprzez stworzenie dostępu do nowoczesnej infrastruktury publicznej czy obniżenie kosztów eksploatacji tej infrastruktury oraz podniesie atrakcyjność społeczno-gospodarczą gminy. Zakłada się przeprowadzenie następujących prac: - wykonanie modernizacji instalacji c.o. poprzez wymianę grzejników, montaż zaworów odcinających, równoważących, odpowietrzających, termostatycznych, licznika ciepła oraz wymianę źródła na gazowy kocioł kondensacyjny na gaz płynny wraz z wykonaniem zbiornika na gaz płynny i podłączenia do budynku. - docieplenie ścian zew. wraz z wymianą obróbek blacharskich, orynnowania, obrobieniem glifów, zmin. mostków cieplnych; - docieplenie stropu nad pomieszczeniami ogrzewanymi; - w. nawiewników ciśnieniowych, wymianę uszczelek, regulację okien PVC oraz wymianę okien w podziemiu; - wymianę drzwi zewnętrznych; - usprawnienie instalacji c.w.u.; - wymiana opraw na LED z czujką ruchu; - wykonanie instalacji PV. W wyniku realizacji projektu ilość zaoszczędzonej energii cieplnej wyniesie 176,00 GJ/rok. O 130 753,49 kWh/rok zmniejszy się także roczne zużycie energii pierwotnej w budynkach publ. Szacuje się ponadto, że roczny spadek emisji gazów cieplarnianych wyniesie 42,29 tqCO2. Dodatkowa zdolność energii wytwarzanej z OZE wyniesie z kolei 0,0168 MWt, a produkcja energii elektrycznej z OZE osiągnie wartość 14,396 MWhe/rok. (Polish)
0 references
Identifiers
RPLU.05.02.00-06-0087/19
0 references