Installation of solar collectors to assist residential heating in residential buildings in the municipality of Third (Q104767): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The objective is “to increase the use of RES in the Gm. The specific objectives are: Improving the energy efficiency of households. The improvement of the quality of the natural environment of GT. Following the project identified by stakeholders: 1. Main (local authority, employees of the UG, MA ROP WL, inhabitants who participate in proj.), 2. I. secondary (inhabitants who do not participate in proj., kokal. energy plants, farmers.), 3. I. co...)
Property / summary
The objective is “to increase the use of RES in the Gm. The specific objectives are: Improving the energy efficiency of households. The improvement of the quality of the natural environment of GT. Following the project identified by stakeholders: 1. Main (local authority, employees of the UG, MA ROP WL, inhabitants who participate in proj.), 2. I. secondary (inhabitants who do not participate in proj., kokal. energy plants, farmers.), 3. I. context (which can affect: public capital related to the protection of the land., regional and district authorities, org. eco.) In order to carry out the following tasks, the following tasks are planned: H Z. solar collectors in GT (84szt.) (2kl. + heated 200 l/d.skobny-12; 2kola. + heated 200 l/d. flat skes4t.; 2ol. + heated 200 l/elewation-6szt.; 2ol. + heated 200 l/d.slated with headlamp-levelling (4s); 3kola. + heated 300 l/dapski-8; 3ol. + heated 300 l/d. skobny-28szt.; 3ol. + heated 300 l/elewation-7szt.; 3 col. + heated 300 l/scored with angular adjustment 7zt.; 4ol. + heated 400 l/d. skobny-7szt.; 4kol. + Heres.400l/d. sangled with revision-1st.), Z.II.Investor’s supervision (1st.) Z.III.Promocy — Internet portal (1s), no result for the following: — Additional production capacity e. renewable — 0.33 MW — Production/generation from newly built/new generating capacity of the installation. OF-2 927,17MWt/year — Estimated annual decrease in greenhouse gas emissions — 897,82 tonnes equivalent/year. The project is part of the “Development Strategy of the Third Committee 2015-2020” and is targeted at harvesting, including from the sun, from renewable sources. A reduction in greenhouse gases (greenhouse gases) resulting from the burning of fuels on the floor area, an increase in the share of energy from RES, -reduction of final consumption. In addition, in accordance with the ‘Air Protection Programme for the Lublin Zone’, the investment is in the public domain. (English)
 
Property / summary: The objective is “to increase the use of RES in the Gm. The specific objectives are: Improving the energy efficiency of households. The improvement of the quality of the natural environment of GT. Following the project identified by stakeholders: 1. Main (local authority, employees of the UG, MA ROP WL, inhabitants who participate in proj.), 2. I. secondary (inhabitants who do not participate in proj., kokal. energy plants, farmers.), 3. I. context (which can affect: public capital related to the protection of the land., regional and district authorities, org. eco.) In order to carry out the following tasks, the following tasks are planned: H Z. solar collectors in GT (84szt.) (2kl. + heated 200 l/d.skobny-12; 2kola. + heated 200 l/d. flat skes4t.; 2ol. + heated 200 l/elewation-6szt.; 2ol. + heated 200 l/d.slated with headlamp-levelling (4s); 3kola. + heated 300 l/dapski-8; 3ol. + heated 300 l/d. skobny-28szt.; 3ol. + heated 300 l/elewation-7szt.; 3 col. + heated 300 l/scored with angular adjustment 7zt.; 4ol. + heated 400 l/d. skobny-7szt.; 4kol. + Heres.400l/d. sangled with revision-1st.), Z.II.Investor’s supervision (1st.) Z.III.Promocy — Internet portal (1s), no result for the following: — Additional production capacity e. renewable — 0.33 MW — Production/generation from newly built/new generating capacity of the installation. OF-2 927,17MWt/year — Estimated annual decrease in greenhouse gas emissions — 897,82 tonnes equivalent/year. The project is part of the “Development Strategy of the Third Committee 2015-2020” and is targeted at harvesting, including from the sun, from renewable sources. A reduction in greenhouse gases (greenhouse gases) resulting from the burning of fuels on the floor area, an increase in the share of energy from RES, -reduction of final consumption. In addition, in accordance with the ‘Air Protection Programme for the Lublin Zone’, the investment is in the public domain. (English) / rank
Normal rank
 

Revision as of 16:56, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Installation of solar collectors to assist residential heating in residential buildings in the municipality of Third
Project in Poland financed by DG Regio

    Statements

    0 references
    654,558.95 zloty
    0 references
    157,094.15 Euro
    13 January 2020
    0 references
    779,236.84 zloty
    0 references
    187,016.84 Euro
    13 January 2020
    0 references
    84.0 percent
    0 references
    2 April 2018
    0 references
    28 December 2018
    0 references
    GMINA TRZESZCZANY
    0 references
    Celem gł. proj. jest "zwiększenie wykorzystania OZE na terenie Gm. Trzeszczany". Cele szczegółowe to: Zwiększenie efektywności energetycznej gosp. domowych gm.. Poprawa jakości środowiska naturalnego GT. W związku z projektem zidenty. gr. interesariuszy: 1. I. główni (władzę lokalną, pracowników UG, IZ RPO WL, mieszkańców gm. biorący udział w proj.), 2. I. drugorzędni (mieszkańców gm. nie biorących udziału w proj., lokal. zakłady energetyczne, rolników.), 3. I. kontekstowi (mogący oddział. na proj: inst. publiczne związane z ochroną środ., władze region. i powiatowe, org. eko.) W ramach proj. zaplanowano realizację nast. zadań: Z.I.Instalacja kolektorów słonecznych w GT (84szt.) (2kol.+ podgrze.200l/d.skośny-12szt.; 2kol.+podgrze.200l/d. płaski4szt.; 2kol.+podgrze.200l/elewacja-6szt.; 2kol.+ podgrze.200l/d.skośny z korektą-4szt.; 3kol.+podgrze.300 l/d.płaski-8szt.; 3kol.+podgrze.300l/d. skośny-28szt.; 3kol.+podgrze.300l/elewacja-7szt.; 3 kol.+podgrze.300l/d.skośnym z korektą kąta-7szt.; 4kol.+podgrze.400l/d. skośny-7szt.; 4kol. + podgrze.400l/d. skośny z korektą-1szt.), Z.II.Nadzór inwestorski (1szt.) Z.III.Promocja - portal internetowy (1szt.) Bezp. rezultaty: - Dodatkowa zdolność wytwarzania e. odnawialne- 0,33MW - Produkcja e. cieplnej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzyst. OZE- 2 927,17MWht/rok - Szacowany roczny spadek emisji gazów cieplarnianych- 897,82 tony ekwiwalentu/rok. Projekt wpisuje się w "Strategię Rozwoju Gminy Trzeszczany 2015-2020" i ukierunkowany jest na pozyskiwanie e. z OZE, w tym także ze słońca. Dla osiągnięcia zakład. w proj. długofal. efektów, konieczna jest redukcja gazów cieplarni., powstałych w wyniku spalania paliw na terenie gm., -zwiększenie udziału ener. pochodzącej z OZE, -redukcja zużytej e. finalnej. Dodatkowo zgodnie z "Programem ochrony powietrza dla strefy lubelskiej" -inwestycja leży na ob. nieprzekracz. poz. dopuszcz. w odniesieniu do subst. podlegających ocenie jakości powietrza. (Polish)
    0 references

    Identifiers

    RPLU.04.01.00-06-0189/16
    0 references