Thermal modernisation of the building’s educational centre (Q95432): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The project entitled: “Thermal modernisation of the building of the Kowarach School of Education Centre” refers to the improvement of energy efficiency through the construction of works consisting of a heating of the wood pellet window in part of the low and high building, the replacement of old wooden windows into the new PVC windows, the insulation of the external wall of the polystyrene, the modernisation of the heating system by replacing...)
Property / summary
The project entitled: “Thermal modernisation of the building of the Kowarach School of Education Centre” refers to the improvement of energy efficiency through the construction of works consisting of a heating of the wood pellet window in part of the low and high building, the replacement of old wooden windows into the new PVC windows, the insulation of the external wall of the polystyrene, the modernisation of the heating system by replacing old coal boilers with new gas boilers, improving the heating system of the central heating system by the installation of new radiator valves with thermostatic heads, improving thermal insulation of the basement pipes, including the washing of the installation, upgrading the heating system of hot water pipes by using a heat pump, improving thermal insulation of the basement pipes. The works will be carried out in three posts: I. Thermomodernisation of façade with replacement of wooden windows at PVC, II. Insulation of costume by inflating the needle into the low and high premise of the Centre, III. Conversion of boiler rooms with replacement of the heat source (from coal boilers to gas, condensing). The project will run from 01.05.2016 to 31.12.2017. The main aim of the main project is to upgrade the facility of the ‘War’ Centre with the replacement and modernisation of the energy source in order to increase the energy efficiency of the company by reducing heat losses by using RES technology. The specific objectives of the project were expressed in the form of output indicators (part S of the proposal). The project will result in a modernised facility, increased energy efficiency of the company and a strengthening of its position in the tourism services market. Amount of heating energy saved 1955 GJ/year, final energy to 1961 GJ/year (English)
 
Property / summary: The project entitled: “Thermal modernisation of the building of the Kowarach School of Education Centre” refers to the improvement of energy efficiency through the construction of works consisting of a heating of the wood pellet window in part of the low and high building, the replacement of old wooden windows into the new PVC windows, the insulation of the external wall of the polystyrene, the modernisation of the heating system by replacing old coal boilers with new gas boilers, improving the heating system of the central heating system by the installation of new radiator valves with thermostatic heads, improving thermal insulation of the basement pipes, including the washing of the installation, upgrading the heating system of hot water pipes by using a heat pump, improving thermal insulation of the basement pipes. The works will be carried out in three posts: I. Thermomodernisation of façade with replacement of wooden windows at PVC, II. Insulation of costume by inflating the needle into the low and high premise of the Centre, III. Conversion of boiler rooms with replacement of the heat source (from coal boilers to gas, condensing). The project will run from 01.05.2016 to 31.12.2017. The main aim of the main project is to upgrade the facility of the ‘War’ Centre with the replacement and modernisation of the energy source in order to increase the energy efficiency of the company by reducing heat losses by using RES technology. The specific objectives of the project were expressed in the form of output indicators (part S of the proposal). The project will result in a modernised facility, increased energy efficiency of the company and a strengthening of its position in the tourism services market. Amount of heating energy saved 1955 GJ/year, final energy to 1961 GJ/year (English) / rank
Normal rank
 

Revision as of 21:54, 15 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of the building’s educational centre
Project in Poland financed by DG Regio

    Statements

    0 references
    210,165.14 zloty
    0 references
    50,439.63 Euro
    13 January 2020
    0 references
    323,259.07 zloty
    0 references
    77,582.18 Euro
    13 January 2020
    0 references
    65.01 percent
    0 references
    1 December 2015
    0 references
    31 December 2017
    0 references
    CENTRUM EDUKACJI PRO FUTURO SPÓŁKA CYWILNA MAŁGORZATA I DARIUSZ SZYMAŃSCY
    0 references
    0 references
    Projekt pn. „Termomodernizacja budynku Ośrodka Oświatowo – Wypoczynkowego Wojków w Kowarach” dotyczy zwiększenia efektywności energetycznej poprzez realizację robót budowlanych polegających na dociepleniu stropodachu granulatem celulozowym w części niskiej i wysokiej budynku, wymianie starych okien drewnianych na nowe okna pcv, ocieplenie ścian zewnętrznych styropianem, modernizację systemu grzewczego poprzez wymianę starych kotłów węglowych na nowe kotły gazowe, poprawę sprawności instalacji centralnego ogrzewania poprzez montaż nowych zaworów grzejnikowych z głowicami termostatycznymi, poprawę izolacji termicznej rur w piwnicach, wraz z płukaniem instalacji, modernizację systemu podgrzewania ciepłej wody użytkowej poprzez zastosowanie pompy ciepła, poprawa izolacji termicznej rur w piwnicach. Roboty będą realizowane w trzech etpach: I. Termoizilacja elewaci wraz z wymianą okien drewnianych na PCV, II. Docieplenie stropodachu poprzez wdmuchanie granulatu celulozowego do cześci niskiej i wysokiej obiektu Ośrodka, III. Przebudowa kotłowni z wymianą źródła ciepła (z kotłów węglowych na gazowe, kondensacyjne). Projekt będzie realizowany w okresie od 01.05.2016 r. do 31.12.2017 r. Odbiorcami efektów rzeczowych realizacji projektu jest społeczność lokalna Gminy Miasta Kowary oraz osoby korzystające z usług turystycznych i rehabilitacyjnych. Celem głownym projektu jest głęboka modernizacja obiektu Ośrodka "Wojków" wraz z wymianą i modernizacją źródła energii mająca, aby podnieść efektywność energetyczną przedsiębiorstwa poprzez zmniejszenie strat ciepła poprzez zastsowanie technologii wykorzystującej OZE. Cele szczególowe projektu zostały wyrażone w formie wskaźników produktu (część S wniosku). Rezultatem projektu będzie zmodernizowany obiekt, zwiększona efektywność energetyczna przedsiębiorstwa oraz wzmocnienie jego pozycji na rynku usług turystycznych. Ilość zaoszczędzonej energii cieplnej wyniesienie 1955 Gj/rok, zmnieszy się energia końcowa do 1961 Gj/rok (Polish)
    0 references

    Identifiers

    RPDS.03.02.00-02-0021/16
    0 references