“Construction of the DW in Rzeszów on a section from ul. Lübeck to ul. Warsaw — link from DK 97 to DK 94” (Q88472): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The project concerns the construction of a provincial road between ul.Lübeck, ul.Warsaw city in Rzeszów.1 378.91 m (in km 0 + 038,49 to 1 + 417,40), of which:— the construction of the second carriageway on the south side of the existing ul.Krogulski:645.86 m (in km 0, + 038,49 to 0 + 684,35) — construction of the road after the new incident:733.05 m (in km 0 + 684,35 to 1 + 417,40) and includes the following elements:1.Construction of dual car...) |
||
Property / summary | |||
Property / summary: The project concerns the construction of a provincial road between ul.Lübeck, ul.Warsaw city in Rzeszów.1 378.91 m (in km 0 + 038,49 to 1 + 417,40), of which:— the construction of the second carriageway on the south side of the existing ul.Krogulski:645.86 m (in km 0, + 038,49 to 0 + 684,35) — construction of the road after the new incident:733.05 m (in km 0 + 684,35 to 1 + 417,40) and includes the following elements:1.Construction of dual carriageway class G, partly operated as a replacement for the second carriageway to an existing street.Kroulski, 2.Construction or reconstruction of elements ensuring a combination of the planned road with other roads 3.Reconstruction ul.Warsaw on the section requiring the construction of a junction, 4.Construction of additional carriageways to ensure accessibility of the areas adjacent to the road, 5.Construction of pavements and cycle paths, 6.Construction or reconstruction of bus bays, 7.Construction or upgrading of points, 8.Construction of the road drainage system, 9.Construction and upgrading of street lighting, 10.Construction, upgrading or securing of conflicting external infrastructure equipment, 11.Road markings and road safety equipment, 12.Preparatory work, such as felling and planting, demolition of existing road sections, etc.The project will result in:— channelling of transit traffic from the city centre through a new connection to the TEN-T road network, improving the safety of traffic operators, reducing journey times and improving travel comfort, improving environmental protection by reducing noise and exhaust emissions, improving the accessibility of communication to new and existing investment areas.The main users of the project will be the residents of Rzeszów, Rzeszów Functional Area and Podkarpackie Province, as well as entrepreneurs and tourists. (English) / rank | |||
Revision as of 15:43, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | “Construction of the DW in Rzeszów on a section from ul. Lübeck to ul. Warsaw — link from DK 97 to DK 94” |
Project in Poland financed by DG Regio |
Statements
17,693,607.36 zloty
0 references
20,816,008.66 zloty
0 references
85.0 percent
0 references
4 February 2016
0 references
31 July 2019
0 references
GMINA MIASTO RZESZÓW
0 references
Projekt dotyczy budowy drogi wojewódzkiej pomiędzy ul. Lubelską a ul. Warszawską w Rzeszowie o dł. 1 378,91 m (w km 0+038,49 do 1+417,40), w tym: - dobudowę drugiej jezdni po południowej stronie istniejącej ul. R. Krogulskiego: 645,86 m (w km 0,+038,49 do 0+684,35) - budowę drogi po nowym śladzie: 733,05 m (w km 0+684,35 do 1+417,40) i obejmuje następujące elementy: 1. Budowę dwujezdniowej drogi klasy G, częściowo prowadzoną jako dobudowę drugiej jezdni do istniejącej ul. R. Krogulskiego, 2. Budowę lub przebudowę elementów zapewniających połączenie projektowanej drogi z innymi drogami 3. Przebudowę ul. Warszawskiej na odcinku wymagającym budowy skrzyżowania, 4. Budowę dodatkowych jezdni zapewniających dostępność komunikacyjną terenów przyległych do drogi, 5. Budowę chodników i ścieżek rowerowych, 6. Budowę lub przebudowę zatok autobusowych, 7. Budowę lub przebudowę zjazdów, 8. Budowę układu odwodnienia drogi, 9. Budowę i przebudowę oświetlenia drogi, 10. Budowę, przebudowę lub zabezpieczenie kolidujących urządzeń infrastruktury zewnętrznej, 11. Wykonanie oznakowania drogi oraz urządzeń bezpieczeństwa ruchu drogowego, 12. Prace o charakterze przygotowawczym, takich jak wycinka i nasadzenia zieleni, rozbiórki elementów dróg istniejących, itp. Dzięki realizacji projektu nastąpi: - wyprowadzanie ruchu tranzytowego z centrum Rzeszowa poprzez nowe połączenie z siecią dróg TEN-T, - poprawa bezpieczeństwa uczestników ruchu, - skrócenie czasu przejazdu i poprawa komfortu podróży, - zwiększenie ochrony środowiska poprzez ograniczenie hałasu i emisji spalin, - poprawa dostępności komunikacyjnej do nowych i istniejących terenów inwestycyjnych. Głównymi użytkownikami projektu będą mieszkańcy Rzeszowa, Rzeszowskiego Obszaru Funkcjonalnego i województwa podkarpackiego, oraz przedsiębiorcy i turyści. (Polish)
0 references
Identifiers
POPW.02.02.00-18-0001/17
0 references