Eliminate territorial disparities in access to high-speed broadband internet in the Bialski Subregion A, ID: 3.3.06.09a (Q86788): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The project concerns the construction within NUTS-3 of the Bialski subregion (Part A), ID:3.3.06.09a in districts:the Bialski, the Danubian and Biała Podlaska City (‘the Intervention Area’) of a cable broadband network (for households and educational units with a total length of 1 119.40 km).As a result of the project, 15 263 households and 115 educational establishments will have access to the Internet. 15 263 farms will have access to a netw...) |
||
Property / summary | |||
Property / summary: The project concerns the construction within NUTS-3 of the Bialski subregion (Part A), ID:3.3.06.09a in districts:the Bialski, the Danubian and Biała Podlaska City (‘the Intervention Area’) of a cable broadband network (for households and educational units with a total length of 1 119.40 km).As a result of the project, 15 263 households and 115 educational establishments will have access to the Internet. 15 263 farms will have access to a network with a performance of at least 100 Mbps. all educational establishments indicated to be connected will gain the capacity of at least 100Mbps (symmetrical).The main objective of the project is to implement the access networks that telecommunications operators will use to provide retail services.The applicant will only be a provider of wholesale services and the network built under the project will be made available to all interested retail operators (user operators) on the basis of wholesale access.The project envisages the design and construction of a Broadband Area for the Broadband Area, leading to the maximisation of the coverage of the country with modern access to NGA networks. (English) / rank | |||
Revision as of 14:58, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Eliminate territorial disparities in access to high-speed broadband internet in the Bialski Subregion A, ID: 3.3.06.09a |
Project in Poland financed by DG Regio |
Statements
65,643,023.95 zloty
0 references
77,227,087.0 zloty
0 references
85.0 percent
0 references
24 August 2018
0 references
24 December 2021
0 references
FIBEE IV SP. Z O.O.
0 references
Projekt dotyczy budowy na terenie NUTS-3 – podregion bialski (część A), ID: 3.3.06.09a. w powiatach: bialskim, włodawskim oraz mieście Biała Podlaska (zwanym dalej „Obszarem Interwencji”) sieci szerokopasmowej w technologii kablowej (dla gospodarstw domowych oraz jednostek oświatowych o łącznej długości 1 119,40 km. W wyniku realizacji projektu 15 263 gospodarstw domowych oraz 115 placówek oświatowych uzyskają dostęp do Internetu.15 263 gospodarstw uzyska dostęp do sieci o parametrach co najmniej 100 Mb/s. Wszystkie placówki oświatowe wskazane do podłączenia uzyskają przepustowość min. 100Mb/s (symetryczne). Głównym celem projektu jest realizacja sieci dostępowych, które będą wykorzystane przez przedsiębiorców telekomunikacyjnych do świadczenia usług detalicznych. Wnioskodawca będzie dostawcą wyłącznie usług hurtowych a wybudowana w ramach Projektu sieć zostanie udostępniona wszystkim zainteresowanym operatorom detalicznym (operatorom korzystającym) na zasadach dostępu hurtowego. W ramach projektu zakłada się zaprojektowanie oraz wybudowanie na Obszarze Interwencji sieci szerokopasmowego Internetu, doprowadzając w efekcie do maksymalizacji pokrycia kraju nowoczesnymi sieciami dostępowymi NGA. (Polish)
0 references
Identifiers
POPC.01.01.00-06-0054/18
0 references