Water and wastewater management in the municipality of Pruszcz Gdański (Q85499): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The project concerns the construction of a sewerage system in the commune of Pruszcz Gdański with a length of 5.01 km, the dismantling of the container waste water treatment plant (and the diversion of waste water to the Gdansk East plant) and the improvement of the water supply system by the construction of the water mains “linking” m. Rothmanka-Yaszkowo (improved efficiency and network pressure) with a total length of 0.9 km.316 new users of...) |
||
Property / summary | |||
Property / summary: The project concerns the construction of a sewerage system in the commune of Pruszcz Gdański with a length of 5.01 km, the dismantling of the container waste water treatment plant (and the diversion of waste water to the Gdansk East plant) and the improvement of the water supply system by the construction of the water mains “linking” m. Rothmanka-Yaszkowo (improved efficiency and network pressure) with a total length of 0.9 km.316 new users of the sewerage network will be connected as a result of the project. (English) / rank | |||
Revision as of 16:45, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Water and wastewater management in the municipality of Pruszcz Gdański |
Project in Poland financed by DG Regio |
Statements
2,583,652.52 zloty
0 references
3,039,591.2 zloty
0 references
85.0 percent
0 references
1 January 2017
0 references
31 December 2018
0 references
EKSPLOATATOR SP. Z O.O.
0 references
Projekt dotyczy budowy kanalizacji sanitarnej na terenie Gminy Pruszcz Gdański o długości 5,01 km, likwidacji kontenerowej oczyszczalni ścieków (i przekierowania ścieków do oczyszczalni Gdańsk Wschód) oraz poprawy systemu zaopatrzenia w wodę poprzez budowę sieci wodociągowej „spinającej” m. Rotmanka-Juszkowo (poprawa wydajności i ciśnienia w sieci) o łącznej długości 0,9 km. W wyniku realizacji projektu zostanie podłączonych 316 nowych użytkowników sieci kanalizacyjnej. (Polish)
0 references
Identifiers
POIS.02.03.00-00-0306/17
0 references