Water and sanitation infrastructure development in the Jaisielna Agglomeration Valley (Q85297): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The project will be implemented in Podkarpackie Province, Jarsienica Rosenna (Jansienica, Wola Jabelick and Blyne) and Brzozów (Stara Wieś), in the Jaisielna Agglomeracja Agglomeration.The aim of the project is to:investment in sewerage system extension in the gravity/discharge system and the extension and reconstruction of the wastewater treatment plant in Blim.The planned treatment plants are to:modification of premises:sewage pumping statio...)
Property / summary
The project will be implemented in Podkarpackie Province, Jarsienica Rosenna (Jansienica, Wola Jabelick and Blyne) and Brzozów (Stara Wieś), in the Jaisielna Agglomeracja Agglomeration.The aim of the project is to:investment in sewerage system extension in the gravity/discharge system and the extension and reconstruction of the wastewater treatment plant in Blim.The planned treatment plants are to:modification of premises:sewage pumping station, multitype hydrocentre reactor, existing station dmuchaw station.Demolition of existing plants:Step, sandbox, sandbox, water and social housing, junction of the water catchment area, a water catchment area, a water reservoir, an average sink station, an excessive sludge filter, and a pot.Construction of plants:The excess sludge reservoir, water pump and water pump, water pump, rain water pump, waste water reservoir, waste water, waste water collection reservoir, Komora divider, test date, reactor vessel, sewage water collection reservoir, water purification unit, mechanical cleaning building, sewage sludge of feeder, construction of a multifunctional property, Silos on lime, a coagulant dosage method, filter for air I, air filter II.The effluent will be dosed into the distribution compartments of multifunctional biological reactors with semestrial effect.The sewerage system will be constructed by 33.89 km (9.5 km from Jasieica Rosierna, 24.39 km from the Sta Wieś) and a sewerage network rebuilt in BBlim at 1.2 km.The water supply network will be 10 km in Jaisierica, as well as the construction and construction of 5 wells and the construction of the SUW. (English)
 
Property / summary: The project will be implemented in Podkarpackie Province, Jarsienica Rosenna (Jansienica, Wola Jabelick and Blyne) and Brzozów (Stara Wieś), in the Jaisielna Agglomeracja Agglomeration.The aim of the project is to:investment in sewerage system extension in the gravity/discharge system and the extension and reconstruction of the wastewater treatment plant in Blim.The planned treatment plants are to:modification of premises:sewage pumping station, multitype hydrocentre reactor, existing station dmuchaw station.Demolition of existing plants:Step, sandbox, sandbox, water and social housing, junction of the water catchment area, a water catchment area, a water reservoir, an average sink station, an excessive sludge filter, and a pot.Construction of plants:The excess sludge reservoir, water pump and water pump, water pump, rain water pump, waste water reservoir, waste water, waste water collection reservoir, Komora divider, test date, reactor vessel, sewage water collection reservoir, water purification unit, mechanical cleaning building, sewage sludge of feeder, construction of a multifunctional property, Silos on lime, a coagulant dosage method, filter for air I, air filter II.The effluent will be dosed into the distribution compartments of multifunctional biological reactors with semestrial effect.The sewerage system will be constructed by 33.89 km (9.5 km from Jasieica Rosierna, 24.39 km from the Sta Wieś) and a sewerage network rebuilt in BBlim at 1.2 km.The water supply network will be 10 km in Jaisierica, as well as the construction and construction of 5 wells and the construction of the SUW. (English) / rank
Normal rank
 

Revision as of 15:35, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Water and sanitation infrastructure development in the Jaisielna Agglomeration Valley
Project in Poland financed by DG Regio

    Statements

    0 references
    17,794,614.19 zloty
    0 references
    4,270,707.41 Euro
    13 January 2020
    0 references
    20,934,840.23 zloty
    0 references
    5,024,361.66 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    24 November 2014
    0 references
    31 December 2020
    0 references
    GMINA JASIENICA ROSIELNA
    0 references
    0 references
    Projekt będzie realizowany w woj. podkarpackim,gm. Jasienica Rosielna (Jasienica, Wola Jasienicka i Blizne) oraz gm. Brzozów (Stara Wieś), na terenie Aglomeracji Jasienica Rosielna. W ramach projektu planuje się: prace inwestycyjne z zakresu rozbudowy kanalizacji w systemie grawitacyjno-tłocznym oraz rozbudowę i przebudowę oczyszczalni ścieków w Bliznem. Na oczyszczalni planuje się: przebudowa obiektów: pompownia ścieków, reaktor wielofunkcyjny typu „Hydrocentrum”, stacja dmuchaw istniejąca, stacja trafo. Rozbiórka obiektów istniejących: Krata schodkowa, Piaskownik, Budynek technologiczno-socjalny, Punkt zlewny, Piaskownik punktu zlewnego, Zbiornik retencyjno-uśredniający punktu zlewnego, Zbiornik osadu nadmiernego, Filtr gruntowy, Studzienka pomiarowa. Budowę obiektów: Zbiornik osadu nadmiernego, Pompownia ścieków I stopnia, Pompownia ścieków II stopnia, Pompownia wody technologicznej, Pompownia wód deszczowych, Zbiornik retencyjny, ścieków, Zbiornik retencyjny ścieków dowożonych, Komora rozdzielcza, Studnia pomiarowa, Reaktor wielofunkcyjny, Stacja dmuchaw projektowana, Studnia pomiarowa ścieków oczyszczonych, Budynek oczyszczania mechanicznego, Pompownia ścieków dowożonych, Budynek wielofunkcyjny, Silos na wapno, Stacja dozowania koagulantu, Filtr powietrza I, Filtr powietrza II. Podczyszczone ścieki będą dawkowane pompowo do komór rozdzielczych wielofunkcyjnych reaktorów biologicznych o działaniu semiperiodycznym. Zostanie wybudowana kanalizacja o dł.33,89km (9,5km Jasienica Rosielna, 24,39km Stara Wieś) oraz przebudowana sieć kanalizacji w Bliznem o dł.1,2km. Sieć wodociągowa obejmie 10km w Jasienicy Rosielnej, oraz wykonanie i uzbrojenie 5 studni i budowę SUW. (Polish)
    0 references

    Identifiers

    POIS.02.03.00-00-0079/16
    0 references