Clean Odra in Szczecin — phase 2 (Q85407): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): Scope of the project:construction and supply activities including:Modernisation of the water mains of Medvedev in Szczecin — Stage III (0.71 km) with the replacement of the water supply network in ul. Cisowa in Szczecin for a section of 0.77 km. construction of the water supply network in ul. Yfweis-Santou in Szczecin over a distance of 0.12 km.Construction of sanitary sewage system in Szczecin with a length of approximately1.92 km.Renovation...) |
||
Property / summary | |||
Property / summary: Scope of the project:construction and supply activities including:Modernisation of the water mains of Medvedev in Szczecin — Stage III (0.71 km) with the replacement of the water supply network in ul. Cisowa in Szczecin for a section of 0.77 km. construction of the water supply network in ul. Yfweis-Santou in Szczecin over a distance of 0.12 km.Construction of sanitary sewage system in Szczecin with a length of approximately1.92 km.Renovation of the sanitary and combined sewerage system in Szczecin with a length of approximately 200 mm to 1 200 mm approx.12.3 km.Purchase of 3 mini-excavaters with trailers for their carriage.The measurement campaign and the update of the GIS database for waste water management.Natural gas installation for the Pomorzany.Cleaning up the system of the sanitary and storm-water sewerage system at the border of the Municipality of Good and the Municipality of Szczecin — winding up of the existing WWTP in Mielec, construction of a sewage pumping station together with 1.66 km pressure pipeline, separation of combined sewage system on a section of 0.4 km.Extension of the sludge processing node together with the necessary technical infrastructure in the area of the Pomorskie Province in Szczecin.The result indicators for the direct project “Clean Odra in Szczecin — step 2” are:the number of new users of the sewerage network who have joined the network as a result of the implementation of the project of 27 p.e. (English) / rank | |||
Revision as of 15:58, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Clean Odra in Szczecin — phase 2 |
Project in Poland financed by DG Regio |
Statements
26,557,234.46 zloty
0 references
31,243,805.25 zloty
0 references
85.0 percent
0 references
1 January 2014
0 references
19 December 2022
0 references
ZAKŁAD WODOCIĄGÓW I KANALIZACJI SP. Z O.O.
0 references
Zakres projektu: roboty budowlane i dostawy w tym: Modernizacja magistrali wodociągowej Miedwianka w Szczecinie - Etap III na odcinku 0,71km Wymiana sieci wodociągowej w ul Cisowej w Szczecinie na odcinku 0,77km Rozbudowa sieci wodociągowej w ul Jodłowej-Santockiej w Szczecinie na odcinku 0,12km. Budowa kanalizacji sanitarnej w ul Przestrzennej w Szczecinie o długości ok. 1,92 km. Renowacja sieci kanalizacyjnej sanitarnej i ogólnospławnej w Szczecinie o średnicy od 200 do 1200mm o długości ok. 12,3km. Zakup 3 minikoparek gąsienicowych wraz z przyczepami do ich przewozu. Kampania pomiarowa i aktualizacja bazy danych GIS w zakresie gospodarki ściekowej. Instalacja gazu ziemnego dla OŚ Pomorzany. Uporządkowanie systemu sieci kanalizacji sanitarnej i deszczowej na granicy Gminy Dobra i Gminy Miasto Szczecin - likwidacja istniejącej OŚ w Mierzynie, budowa przepompowni ścieków wraz z rurociągiem tłocznym o długości 1,66km, rozdział kanalizacji ogólnospławnej na rozdzielczą na odcinku 0,4km. Rozbudowa węzła obróbki osadu wraz z niezbędną infrastrukturą techniczną na terenie OŚ Pomorzany w Szczecinie. Wskaźniki rezultatu bezpośredniego projektu „Czysta Odra w Szczecinie – etap 2” to : liczba nowych użytkowników sieci kanalizacyjnej, którzy przyłączyli się do sieci w wyniku realizacji projektu 27 RLM. (Polish)
0 references
Identifiers
POIS.02.03.00-00-0157/16
0 references