Construction of the source of CHP source from biomass (RES) with energy accumulation and installation of FVE, accompanied by the smart management system for Milakice s.r.o. (Q18862): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: EU contribution (P835): 135,786.272 euro) |
(Changed an Item: Fixing rounding issue) |
||||||||||||||
Property / EU contribution | |||||||||||||||
135,786.27 Euro
| |||||||||||||||
Property / EU contribution: 135,786.27 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 135,786.27 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.04 Euro
| |||||||||||||||
Property / EU contribution: 135,786.27 Euro / qualifier | |||||||||||||||
point in time: 10 January 2020
|
Revision as of 19:58, 22 September 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of the source of CHP source from biomass (RES) with energy accumulation and installation of FVE, accompanied by the smart management system for Milakice s.r.o. |
Project in Czech Republic financed by DG Regio |
Statements
3,394,656.8 Czech koruna
0 references
4,243,321.0 Czech koruna
0 references
80 percent
0 references
28 March 2018
0 references
27 September 2018
0 references
15 November 2018
0 references
Služby Mikolajice s.r.o.
0 references
74784
0 references
Cílem projektu je instalace a zprovoznění zdroje na KVET o tepelném výkonu 43.5 kWt a el. výkonu 2 kWe (energie v palivu - tepelný příkon 50 kWt) s využitím jednotky ORC pro zajištění dodávky elektrické a tepelné energie, instalace a zprovoznění fotovoltaických panelů o elektrickém výkonu 10 kWe, aplikaci inteligentního řídicího systému výroby a spotřeby tepla a elektřiny s akumulací vyrobených energií a se zajištěním propojení řešených objektů. a. (Czech)
0 references
The project aims at installing and making the source of heat output 43.5 kWt and el. 2 kWe (energy in fuel — thermal input — thermal input of 50 kWt) using the ORC unit to ensure the supply of electricity and heat, installation of photovoltaic panels with electrical output of 10 kWe, an intelligent control system for the production and consumption of heat and power with energy storage and the interconnection of the subject sites. (English)
0 references
Identifiers
CZ.01.3.14/0.0/0.0/16_132/0010898
0 references