Koumáci_1 (Q55188): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The project is a continuation of project CZ.03.1.51/0.0/0.0/15_035/0001918 Child group_UVR Mníšek pod Brddy a.s., supported by OP Z call 03_15_035. DS is the place of operation of the DS is Prazska 600, ÚCoR Mníšek pod Brady, 252 10 Mníšek pod Brady. This is a business DS with a capacity of 10 seats. The main space of the DS is 134.3 m², the sanitary and operating environment of the DS is 59.8 m². DS has its own entrance from the atrium of the...) |
||
Property / summary | |||
Property / summary: The project is a continuation of project CZ.03.1.51/0.0/0.0/15_035/0001918 Child group_UVR Mníšek pod Brddy a.s., supported by OP Z call 03_15_035. DS is the place of operation of the DS is Prazska 600, ÚCoR Mníšek pod Brady, 252 10 Mníšek pod Brady. This is a business DS with a capacity of 10 seats. The main space of the DS is 134.3 m², the sanitary and operating environment of the DS is 59.8 m². DS has its own entrance from the atrium of the City. The DS is a garden. The timetable for the project is 1. 3. 2019-28. 2. 2022, i.e. 36 months of operation. (English) / rank | |||
Revision as of 09:26, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Koumáci_1 |
Project in Czech Republic financed by DG Regio |
Statements
2,817,342.0 Czech koruna
0 references
3,314,520.0 Czech koruna
0 references
85 percent
0 references
1 March 2019
0 references
28 February 2022
0 references
UVR Mníšek pod Brdy a.s.
0 references
25210
0 references
Projekt navazuje na projekt CZ.03.1.51/0.0/0.0/15_035/0001918 Dětská skupina_UVR Mníšek pod Brdy a.s., podpořený z výzvy OP Z č. 03_15_035. Adresa místa provozu DS je Pražská 600, ÚVR Mníšek pod Brdy, 252 10 Mníšek pod Brdy. Jedná se o podnikovou DS s kapacitou 10 míst. Hlavní prostor DS má 134,3 m2, hygienické a provozní zázemí DS je na ploše 59,8 m2. DS má vlastní vchod z atria hl. budovy. Součástí DS je zahrada. Harmonogram projektu je 1. 3. 2019 - 28. 2. 2022, tedy provoz v délce 36 měsíců. (Czech)
0 references
Identifiers
CZ.03.1.51/0.0/0.0/19_101/0011153
0 references