Reconstruction of the Nepolisa walkway (Q62421): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The main thrust of the project is to increase the standard of daily life of the population, with particular emphasis on the safety of pedestrian movements in the municipality. The project covers the reconstruction of the pedestrian corridor using the road to bus stops, which is an essential means of transport to schools, jobs, etc. The project will also address the lack of accessibility. This is a pedestrian at the roads of II/327 and III/3241...)
Property / summary
The main thrust of the project is to increase the standard of daily life of the population, with particular emphasis on the safety of pedestrian movements in the municipality. The project covers the reconstruction of the pedestrian corridor using the road to bus stops, which is an essential means of transport to schools, jobs, etc. The project will also address the lack of accessibility. This is a pedestrian at the roads of II/327 and III/32412. The target group of the project is the population of the municipality of all ages. (English)
 
Property / summary: The main thrust of the project is to increase the standard of daily life of the population, with particular emphasis on the safety of pedestrian movements in the municipality. The project covers the reconstruction of the pedestrian corridor using the road to bus stops, which is an essential means of transport to schools, jobs, etc. The project will also address the lack of accessibility. This is a pedestrian at the roads of II/327 and III/32412. The target group of the project is the population of the municipality of all ages. (English) / rank
Normal rank
 

Revision as of 12:02, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reconstruction of the Nepolisa walkway
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,182,111.6 Czech koruna
    0 references
    47,284.46 Euro
    1 October 2020
    0 references
    1,244,328.0 Czech koruna
    0 references
    49,773.12 Euro
    1 October 2020
    0 references
    95 percent
    0 references
    16 October 2017
    0 references
    30 September 2018
    0 references
    30 September 2018
    0 references
    OBEC NEPOLISY
    0 references
    0 references

    50°11'31.9"N, 15°27'45.7"E
    0 references
    50363
    0 references
    Hlavní myšlenkou projektu je zvýšení standardu každodenního života obyvatel a to především s důrazem na bezpečnost pěších při jejich pohybu v obci. Předmětem projektu je rekonstrukce chodníku pro pěší s využitím při cestě k zastávkám veřejné autobusové dopravy, která je základním prostředkem při dopravě do škol, zaměstnání atd. Projekt vyřeší i nedostatečnou bezbariérovost. Jedná se o chodník u silnic II/327 a III/32412. Cílovou skupinou projektu jsou obyvatelé obce všech věkových kategorií. (Czech)
    0 references

    Identifiers

    CZ.06.4.59/0.0/0.0/16_038/0006995
    0 references